Jump to content

London–Aylesbury line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by G-13114 (talk | contribs) at 22:45, 27 November 2016 (Line speeds: rm unreferenced section, which is likely out of date anyway). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

London to Aylesbury
Amersham station with a Chiltern and a London Underground train in the distance.
Overview
StatusOperational
Owner
Locale
Termini
Stations16
Service
TypeCommuter rail, Suburban rail, Rapid transit
System
Services2
Operator(s)
Depot(s)Neasden (Met), Aylesbury TMD (Chiltern)
Rolling stock
History
Opened1892 (fully)
Closed
  • Quainton Rd - Verney Junction/Brill - 1936
  • North of Calvert (GCML) - 1966
Technical
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed75 mph (121 km/h) maximum
Route map
London–Aylesbury line
Calvert Freight Depot
Calvert
Quainton Road
Waddesdon Manor
Aylesbury Vale Parkway
Aylesbury Maintenance Depot
Aylesbury
Stoke Mandeville
Wendover
Great Missenden
Amersham London Underground
Chalfont & Latimer London Underground
Chorleywood London Underground
Rickmansworth London Underground
Watford South Junction
Non-stop section
Non-stop section
Moor Park
(LU only)
Northwood
Northwood Hills
Pinner
North Harrow
Harrow Junction
Harrow-on-the-Hill London Underground
Non-stop section
Non-stop section
Northwick Park
Preston Road
Wembley Park
Neasden Junction Chiltern ML
Neasden
Dollis Hill
Willesden Green
Kilburn
West Hampstead
Finchley Road
Hampstead tunnel
St. John's Wood tunnel
Lords tunnel
London Marylebone London Underground

The London to Aylesbury Line is the main railway line between London (Marylebone) and Aylesbury, going via the Chiltern Hills; it is operated by Chiltern Railways. The line includes a section where National Rail trains use track that is owned by London Underground. This section is approximately 16 miles (26 km): the total length of the passenger section of the line is about 39 miles (63 km), meaning nearly half of the line is owned by London Underground between Harrow on the Hill and the property boundary 1.4 miles (2.3 km) north of Amersham, near Weedonhill Wood (sometimes erroneously referred to as Mantles Wood).[1]

The line operates modified timetables during autumn, as trains need to take more time to brake due to the leaves that fall on the line in the heavily wooded section between Amersham and Rickmansworth.[2]

The line is part of the former trunk route, the Great Central Main Line.

History

The route towards Aylesbury opened in stages between 1868 and 1899:

  1. The Metropolitan & St. John’s Wood Railway (later part of the Metropolitan Railway) opened from Baker Street to Swiss Cottage in 1868.
  2. The Aylesbury and Buckingham Railway connected Verney Junction with Aylesbury in 1868. The route would become part of the Met in 1891.
  3. In 1879 the Met was extended from Swiss Cottage to Willesden Green.
  4. In 1880 to Harrow-on-the-Hill.
  5. In 1885 to Pinner.
  6. In 1887 to Rickmansworth.
  7. In 1889 to Chesham.
  8. Then in September 1892 the Metropolitan connected to Aylesbury via Amersham, making the Chesham route a branch line.

The Great Central Railway (GCR) decided to build a main line called the London Extension from Annesley Junction north of Nottingham to London via the Metropolitan Railway. It was the last main line to be built in Britain until High Speed 1. The line was completed in 1899. In 1903 the line between Harrow and Canfield Place (near Finchley Road) was built, thus bypassing this part of the Metropolitan tracks. The route was a major trunk route with many prestigious trains, such as The Master Cutler and The South Yorkshireman.

The line beyond Aylesbury Vale Parkway is currently closed to almost all passenger services: the Metropolitan line service north of Aylesbury to Verney Junction and Brill was withdrawn in 1936 as London Transport (LT) wanted to focus more closely on London. The permanent way is now lost.

The line north west from Harrow was electrified in stages. In 1925, four rail electrification reached Rickmansworth and Watford, and the Metropolitan Railway planned to electrify the line as far as Aylesbury by 1935. However, when the Met was absorbed into LT the plans were put on hold. Electrification of the final leg of the Met finally got under way in the late 1950s, but LT decided later to electrify only up to Amersham. The original intention to electrify further is evidenced by the colour light signalling which was fully installed as far as Aylesbury and by platform extensions up to Stoke Mandeville. In 1961 LT withdrew the Metropolitan line from Aylesbury and since then it goes only as far as Amersham. Following the end of steam-hauled Metropolitan line trains in 1961 the service was provided by British Rail Class 115 diesel multiple units until 1992 (which were then replaced by the line's current rolling stock) - along with Metropolitan line electric multiple units south of Amersham. Responsibility for the line north of Amersham was transferred from London Transport to British Railways on 11 September 1961; London Underground signage at the stations on this section was gradually replaced by those of British Railways.

The mainline services north of Aylesbury (via Woodford Halse, Rugby and Loughborough to Nottingham Victoria and beyond) were withdrawn in 1966 as the Great Central Main Line was seen by Dr Beeching as a duplicate of the Midland Main Line. Now only freight services to Calvert and specials to and from Quainton run (the specials only run on certain Bank Holidays). The track remains in situ from Calvert west to Bicester Town and intermittently east to Bletchley.

Intercity 125 trains were used on the line, albeit rarely, during the 1980s.[3] Also in the 1980s, there were passenger specials north to Milton Keynes from Marylebone via Aylesbury and High Wycombe, which picked up passengers at Quainton Road and the disused Winslow railway station.[4]

On 14 December 2008, Chiltern Railways opened a new station, Aylesbury Vale Parkway. This station is situated two miles NW of Aylesbury station.

Route description

Class 165 and 168 trains seen at London Marylebone

From Marylebone the line runs through a series of tunnels as far as Finchley Road, from where the line runs overground and runs parallel to the Metropolitan and Jubilee lines. A passenger on a train departing from Marylebone can see the Metropolitan line just before the train enters the first tunnel, because the tunnels used by these two lines run only a few yards apart. At Neasden Junction, the Chiltern Main Line diverges to the west, while the Aylesbury line continues north parallel to the underground lines, passing Wembley Stadium.

The line then joins the Metropolitan line tracks a few yards south of Harrow-on-the-Hill station and shares this track with the London Underground's fast Metropolitan line services to Amersham from London Baker Street. This section runs parallel to the slow Met Line to Northwood and Watford. The line goes under the M25 north of Rickmansworth. After Chalfont & Latimer station, the Chesham branch diverges, and the main line continues to Amersham, the terminus for Metropolitan line trains.

Harrow-on-the-Hill station

Beyond Amersham the line returns to Network Rail control and runs north west to Aylesbury, roughly following the A413 road. The Princes Risborough line joins the main line at Aylesbury, where Chiltern Railways have a maintenance depot. There, the line becomes single track, and after Aylesbury Vale Parkway, freight only, passing through Quainton Road to Calvert, the site of a major waste transfer station and landfill site. Beyond Calvert, at the former junction, the line turns east to join the Varsity Line, while the trackbed of the former Great Central Main Line continues north west.

Because of its route through the Chiltern Hills and perhaps due to lack of overall planning,[citation needed] having been built in stages, the line has some steep gradients and harsh curves. This is one of the main reasons why the GCR built a new line (the Chiltern Main Line) to Woodford Halse in 1906.[citation needed]

Aylesbury station

Towns/villages served

The line serves the following stations:

Map

Geographical Route of the London to Aylesbury Line
Geographical Route of the London to Aylesbury Line

Operation

Passenger services are provided by Chiltern Railways. From Marylebone to Neasden Junction the track is shared with the Chiltern Main Line, and from Harrow to Amersham the track is shared with London Underground's Metropolitan line, and is used by their "fast" services. As a result, all Chiltern trains must be fitted with the tripcock braking system to run on Underground lines. Marylebone Signalling Control Centre controls all the signals on the line between Marylebone and south of Harrow, and also from north of Amersham to Aylesbury. Marylebone can see all train movements throughout the line but does not control the signals on the Metropolitan line section. These are operated by London Underground signal cabins at Harrow, Rickmansworth and Amersham. The Network Rail-controlled section of the line is fully equipped with ATP, one of only three lines in Britain to have this (the others being the Chiltern Main Line and the Great Western Main Line). As a result, all Chiltern trains must be equipped with ATP equipment.

Weekday off-peak service pattern

As of 28 December 2014:[5]

Chiltern Railways[6]
Service Type Frequency Additional Information Chalfont & Latimer - Marylebone journey time
Marylebone - Aylesbury Fast 2 tph 1 tph extended to Aylesbury Vale Parkway 35 minutes
Metropolitan line[7]
Service Type Frequency Additional Information Chalfont & Latimer - Baker Street journey time
Aldgate - Amersham Slow 2 tph Some rush-hour services are limited-stop 48 minutes
Aldgate - Chesham Slow 2 tph Some rush-hour services are limited-stop 48 minutes

† - tph = train(s) per hour

Future

  • Following completion of a major track work project in December 2006, journey times on the line were cut by about 10 minutes. Currently major track replacement work is under way on the London Underground parts of the line, to increase maximum speeds.
  • The line north of Aylesbury was reopened to regular passenger traffic in 2008 as far as the new Aylesbury Vale Parkway station.[8] In the long term, the line will reopen in 2019 beyond Aylesbury Vale Parkway to allow passenger services to reach Milton Keynes and Bedford via the reopened Varsity Line and East West Rail Link.[9][10][11]
  • A proposal announced in March 2010 would route the future high speed line, High Speed 2, parallel with a section of the Chiltern Main Line. If this is undertaken, it will be a non-stop service, with no interconnects with the Chiltern Line.[12]

National Rail passenger volume

These are the passenger usage statistics on the National Rail network from the year beginning April 2002 to the year beginning April 2012. Large increases in the final year in some stations are mainly due to the introduction of Oyster Cards on the National Rail Network. The reason there were no usage figures in the first three years for stations from Amersham to Harrow-on-the-Hill was because these figures were not yet separated from the London Underground figures, who own and share the same tracks at this point. Aylesbury Vale Parkway has no previous data for the first five years as it only opened in 2008.[13]

Station usage
Station name 2002–03 2004–05 2005–06 2006–07 2007–08 2008–09 2009–10 2010–11 2011–12 2012–13 2013–14 2014–15 2015–16 2016–17 2017–18 2018–19 2019–20 2020–21 2021–22 2022–23
Aylesbury Vale Parkway - - - - - 13,058 49,212 55,864 72,760 81,696 100,886
Aylesbury 939,033 1,101,302 1,048,931 1,092,423 1,129,973 1,093,076 1,025,136 1,067,280 1,060,698 1,068,894 1,104,398
Stoke Mandeville 267,307 318,451 316,986 313,188 309,449 312,744 282,086 292,478 294,944 288,208 303,742
Wendover 382,436 409,616 405,386 403,674 405,247 427,314 406,506 414,214 435,292 434,952 462,490
Great Missenden 402,511 488,401 525,041 526,800 530,999 524,694 500,418 535,652 561,832 541,878 592,470
Amersham No data No data No data 1,805,767 1,510,922 1,059,766 1,218,936 1,713,718 1,784,026 2,035,452 2,164,370
Chalfont and Latimer No data No data No data 446,522 349,370 254,398 398,650 686,488 718,268 702,438 748,158
Chorleywood No data No data No data 650,033 499,400 339,532 402,688 608,914 613,282 632,460 671,680
Rickmansworth No data No data No data 276,561 202,743 152,268 285,790 663,990 735,116 733,604 807,286
Harrow-on-the-Hill No data No data No data 207,167 293,939 157,534 453,158 1,309,328 1,444,386 1,410,622 1,396,730
Marylebone 6,354,517 6,949,363 6,819,287 11,638,642 11,559,187 11,396,645 11,758,094 13,200,221 14,410,072 14,685,1481 15,520,762
The annual passenger usage is based on sales of tickets in stated financial years from Office of Rail and Road estimates of station usage. The statistics are for passengers arriving and departing from each station and cover twelve-month periods that start in April. Methodology may vary year on year. Usage from the periods 2019-20 and especially 2020-21 onwards have been affected by the Covid-19 pandemic

References

  1. ^ The myth of Mantles Wood Metropolitan Line and Network Rail boundary and Mantles Wood myth - METADYNE
  2. ^ New train simulator helps drivers deal with autumn leaf fall - Chiltern Railways
  3. ^ Track Sharing & Route Sharing
  4. ^ [1]
  5. ^ "London Underground Tube Guide" (PDF). Transport for London. 28 December 2014. Retrieved 3 February 2015.
  6. ^ "Chiltern Railways May 2011 timetable" (PDF). 22 May 2011.
  7. ^ "Metropolitan line Amersham/Chesham Guide Dec 2010 timetable" (PDF). 22 May 2011.
  8. ^ New Aylesbury Vale Parkway station to open in 2010 - Chiltern Railways
  9. ^ East West Rail Prospectus Accessed 14 December 2011
  10. ^ Rail Magazine, Issue 685, 14–28 December 2011, Pages 10-11
  11. ^ Bucks Herald (31 March 2014). "Disappointment as East West Rail delayed by two years". Retrieved 3 May 2014.
  12. ^ Greengauge21 proposal for a High Speed Two
  13. ^ "Station Usage". Rail Statistics. Office of Rail Regulation. Retrieved 2 January 2013.

Further reading