USS John F. Kennedy (CVN-79)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Trappist the monk (talk | contribs) at 15:32, 22 July 2017 (Undid revision 791790663 by Special:Contributions/2602:306:365B:7670:1416:C3E9:6101:98C4 unsupported edit;). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

USS John F. Kennedy (CVN-79)
Artist impression of the John F. Kennedy.
History
NameJohn F. Kennedy
NamesakeJohn F. Kennedy
BuilderHuntington Ingalls Industries
Laid down22 August 2015
Launched2018, planned
Sponsored byCaroline Kennedy
Commissioned2020, planned
IdentificationCVN-79
StatusUnder construction
General characteristics
Class and typeGerald R. Ford-class aircraft carrier
TypeNuclear Aircraft Carrier
DisplacementAbout 100,000 long tons (100,000 tonnes) (full load)[1]
Length1,106 ft (337 m)
Beam134 ft (41 m)
Draft39 feet (12 m)
Installed powerTwo A1B nuclear reactors
PropulsionFour shafts
SpeedIn excess of 30 knots (56 km/h; 35 mph)
RangeUnlimited distance; 20–25 years
Complement4,660
Armament
Aircraft carriedMore than 80, can hold up to 90 combat aircraft
Aviation facilities1,092 ft × 256 ft (333 m × 78 m) flight deck

John F. Kennedy (CVN-79) is the second Template:Sclass- being built for the United States Navy. The ship is under construction and planned to be commissioned in 2020.

Naming

On 7 December 2007, the 66th anniversary of the Attack on Pearl Harbor, Congressman Harry Mitchell (D-AZ) proposed naming this ship USS Arizona. In 2009, Congressman John Shadegg (R-AZ) proposed naming either CVN-79 or the subsequent CVN-80 Barry M. Goldwater, after Barry Goldwater, the late senator from Arizona.[2] On 29 May 2011, the Department of Defense announced that the ship would be named for John F. Kennedy (1917–1963), the 35th President of the United States, who served in the navy during World War II.[3][4] She will be the third navy ship named after members of the Kennedy family, and the second aircraft carrier named John F. Kennedy, succeeding USS John F. Kennedy (CV-67), which served from 1967 to 2007.

Construction

On 15 January 2009, Northrop Grumman Shipbuilding was awarded a $374 million contract for design work and construction preparation for John F. Kennedy.[5] On 30 September 2010, Northrop Grumman announced a new vice president for the construction of John F. Kennedy, Mike Shawcross, and that preparations were under way to begin construction.[6]

On 25 February 2011, the navy conducted the First Cut of Steel ceremony at Northrop Grumman Shipbuilding in Newport News, signalling the formal start of construction for John F. Kennedy.[7][8]

John F. Kennedy was originally planned to be completed in 2018. This was extended to 2020 after Secretary of Defense Robert Gates announced in 2009 that the program would shift to a five-year building program so as to place it on a "more fiscally sustainable path". By late 2012, delays had occurred in construction, and the Navy Department was investigating extending the construction time of both the USS Enterprise (CVN-80) and John F. Kennedy by an additional two years which could delay the carrier's entry into service until 2022.[9]

In September 2013, the Government Accountability Office recommended delaying the detail design and construction contract for John F. Kennedy until programmatic shortfalls are sorted out. The Navy and Defense Department have rejected the recommendation. The Navy faces technical, design, and construction challenges to completing USS Gerald R. Ford (CVN-78), including producing systems prior to demonstrating their maturity to meet required installation dates. Gerald R. Ford had costs increase by 22 percent to $12.8 billion, and additional increases could follow due to uncertainties facing critical technology systems and shipbuilder underperformance. Risk is introduced in the navy's plan to conduct integration testing of key systems at the same time as initial operational test and evaluation. One action the GAO says could be taken to ensure Ford-class carrier acquisitions are supported is conducting a cost-benefit analysis of required capabilities and associated costs.[10]

The ship's keel was laid in Newport News, Virginia on 22 August 2015.[11] As part of the traditional keel laying ceremony, the initials of ship sponsor Caroline Kennedy, daughter of President Kennedy, were welded into the ship's hull.[11]

References

  1. ^ "Aircraft Carriers - CVN". Fact File. United States Navy. 17 September 2020. Retrieved 18 November 2020.
  2. ^ [1]
  3. ^ [2] Archived 29 May 2011 at the Wayback Machine
  4. ^ Frost, Peter, "U.S. Navy's Next Aircraft Carrier Will Be Named After The Late John F. Kennedy", Newport News Daily Press, 30 May 2011.
  5. ^ "Archived copy" (PDF). Archived from the original (PDF) on 5 July 2010. Retrieved 2009-05-26. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)CS1 maint: archived copy as title (link)
  6. ^ "Photo Release -- Northrop Grumman Announces Leadership Changes at Shipbuilding Sector in Newport News" (Press release). Northrop Grumman. 30 September 2010.
  7. ^ "Construction Begins on Navy's Newest Aircraft Carrier" (Press release). Newport News Shipbuilding. 25 February 2011. Retrieved 29 May 2011.
  8. ^ Frost, Peter, "Shipyard Cuts First Steel For Next Carrier; Funding Remains In Flux", Newport News Daily Press, 26 February 2011.
  9. ^ Ronald O'Rourke (26 July 2012). "Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress" (PDF). Congressional Research Service. Retrieved 1 December 2012.
  10. ^ Michael Fabey (5 September 2013). "Delay Kennedy Carrier Contract, GAO Says | Defense content from". Aviation Week. Retrieved 17 September 2016.
  11. ^ a b LaGrone, Sam (22 August 2015). "Keel Laid for John F. Kennedy Carrier". United States Naval Institute. Retrieved 29 January 2016.