Jump to content

Union Pacific North Line

Route map:
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Yobot (talk | contribs) at 07:57, 1 May 2016 (top: WP:CHECKWIKI error fixes using AWB (12006)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Union Pacific / North Line
A southbound train departs Highland Park station
Overview
StatusOperational
OwnerUnion Pacific Railroad
LocaleChicago metropolitan area
Termini
Stations27
Service
TypeCommuter Rail
SystemMetra
Operator(s)Union Pacific Railroad
Daily ridership41,000 (Avg. Weekday 2009)[1]
Technical
Line length51.9 miles (83.5 km)[2]
Track gauge4 ft 8+12 in (1,435 mm)
Route map

text
text
Amtrak
84.2 mi
135.5 km
Milwaukee
(1966-1971)
National Avenue
Amtrak
78.2 mi
125.9 km
74.7 mi
120.2 km
61.8 mi
99.5 km
Pike River
51.5 mi
82.9 km
Kenosha
KD Line
to Rockford
44.5 mi
71.6 km
Winthrop Harbor
43.1 mi
69.4 km
Camp Logan
42.1 mi
67.8 km
Zion
39.9 mi
64.2 km
Dunes Park
37.6 mi
60.5 km
Asbestos
35.9 mi
57.8 km
Waukegan
Waukegan Coach Yard
34.0 mi
54.7 km
33.7 mi
54.2 km
North Chicago
32.0 mi
51.5 km
Great Lakes
30.2 mi
48.6 km
Lake Bluff
28.3 mi
45.5 km
Lake Forest
25.7 mi
41.4 km
Fort Sheridan
24.5 mi
39.4 km
Highwood
23.0 mi
37 km
Highland Park
21.5 mi
34.6 km
Ravinia
20.9 mi
33.6 km
Ravinia Park
(Seasonal) Handicapped/disabled access
20.5 mi
33 km
Braeside
19.2 mi
30.9 km
Glencoe
17.7 mi
28.5 km
Hubbard Woods
16.6 mi
26.7 km
Winnetka
15.8 mi
25.4 km
Indian Hill
15.2 mi
24.5 km
Kenilworth
14.4 mi
23.2 km
Wilmette
13.3 mi
21.4 km
Evanston Central Street
12.7 mi
20.4 km
Weber Subdivision
to UP-NW
12.0 mi
19.3 km
Evanston Davis Street Pace Pulse
11.5 mi
18.5 km
11.0 mi
17.7 km
Evanston Main Street
10.3 mi
16.6 km
Purple to Howard or the Loop
9.4 mi
15.1 km
Rogers Park
8.4 mi
13.5 km
8.3 mi
13.4 km
Peterson/Ridge
7.8 mi
12.6 km
7.1 mi
11.4 km
Summerdale
6.5 mi
10.5 km
Ravenswood
6.2 mi
10 km
5.5 mi
8.9 km
Northcenter
Brown to the Loop
4.6 mi
7.4 km
Belmont Avenue
3.5 mi
5.6 km
Deering
Chicago River (north branch)
enlarge… UP-NW
2.9 mi
4.7 km
Clybourn
enlarge… UP-W to Elburn
Chicago River (north branch)
enlarge…MD-N enlarge…MD-W enlarge…NCS Amtrak
0 mi
Ogilvie
Key
Union Pacific North Line
Former route alignment
Other Metra lines
Metra Milwaukee District lines
Other freight lines
CTA lines
Mileage source[3]

Handicapped/disabled access All stations are accessible except
Clybourn, Indian Hill, and Hubbard Woods.

The Union Pacific / North Line (UP-N) is a Metra line in the Chicago metropolitan area. It runs between Ogilvie Transportation Center and Waukegan, Illinois with rush-hour trains continuing to Kenosha, Wisconsin. Although Metra owns the rolling stock, the trains are operated by the Union Pacific Railroad. (Metra does not refer to its lines by particular colors, but the timetable accents for the Union Pacific/North line are dark "Flambeau Green". The colors came from the company colors of the Chicago & North Western Railway, while "Flambeau" refers to the C&NW's Flambeau 400 passenger train.[4]) This line was known as the Chicago & Northwestern/North Line until C&NW was absorbed by Union Pacific circa 1995.

The current timetable has 35 weekday trains leaving Chicago, 17 of which terminate at Waukegan, 9 at Kenosha, 3 at Highland Park, 5 at Winnetka, 1 at North Chicago.

History

The route followed by the UP/North Line was constructed in 1854 by the Chicago & Milwaukee Railroad.[5] Passenger service between Chicago and Waukegan commenced on January 4, 1855. Initially, a single train operated each day, departing from a terminal in Chicago at Water & Kinzie Streets at 8:30 am and returning from Waukegan at 3:30 pm.[6][7] The president of the railroad, former Chicago mayor Walter S. Gurnee, speculated on land in Lake County spurring the development of railway suburbs along the line.[8] The railroad merged with the Green Bay, Milwaukee & Chicago Railroad in 1863, and was acquired by the Chicago and North Western Railway in 1866.[7][9] Commuter rail services along the line started operating into the new Chicago and North Western Terminal (now Ogilvie Transportation Center) in 1911, and became part of Metra when it was formed in 1984. The trains—though owned by Metra—continued to be operated by the Chicago and North Western Railway until that railroad was bought by UP in 1995. UP now operates passenger services along the line for Metra.

All stations on the line except for Ravinia Park are open daily.

Current and future

In 2010, Metra began a project to replace 22 bridges between Clybourn and Rogers Park, which are at the end of their design lives and in need of replacement. Metra's initial plan called for significantly reduced service for the duration of the project.[10] Widespread frustration with this service pattern led to the project being delayed to investigate potential ways to keep existing service. Many people were angry that the original plan for the project would have centered the tracks in the existing right-of-way, preventing any possibility of rebuilding a third track without rebuilding the entire right-of-way or purchasing additional land.[11] Metra claimed that in order to maintain existing service levels during construction, $100 million in additional funding would be needed. This funding was eventually procured and in 2011, Metra began work on a modified plan that will allow pre-existing service levels to be maintained as the bridges are replaced.

There have been ongoing plans to extend the line, possibly as far as Milwaukee for many years. Wisconsin's now defunct Southeastern Regional Transit Authority (SERTA) had completed several studies of the project, but was disbanded in 2011.[12] An Application for funding under the FTA's New Starts program was submitted in 2010, and the agency received federal money for preliminary engineering and construction. In 2011, however, a new Wisconsin budget passed which disbanded SERTA. $15 million in federal funding was returned.[13] The project has since received little attention and is generally considered "Dead."

In late 2015, the Racine City Council unanimously approved a study to extend the line from its current terminus at Kenosha to Racine.[14]

Car 553

Car 553 is a club car operating exclusively on the UP/North Line. It is not actually owned by the railroad, but by a private club of commuters. UP allows the operation at no charge, apart from collecting ticket fares from the club members, who are in charge of maintaining the railcar. Club membership was once limited to wealthy male commuters from affluent North Shore towns such as Lake Forest, Lake Bluff and Highland Park, but is now open to any commuter on the line for a $900 annual membership fee.[15] It is the last privately owned railcar in American commuter service.

Route

The southern terminus of the UP/North Line is at the Ogilvie Transportation Center in downtown Chicago. The route traverses Chicago's northern neighborhoods and its northern and far northern suburbs to Kenosha, Wisconsin.

The Green Bay Trail parallel the Union Pacific / North Line, using the former right of way of the North Shore Line for over 51.9 miles (83.5 km) from Chicago Loop to Kenosha, Wisconsin.

References

  1. ^ "Ridership Reports – System Facts". Metra. Retrieved April 6, 2010.
  2. ^ Metra Railfan Tips – Union Pacific/North Line
  3. ^ State of the System - Union Pacific North Line
  4. ^ "Did you know?" (PDF). On the Bi-Level: 3. June 2009.
  5. ^ "Gurnee History". Village of Gurnee. Retrieved September 16, 2007.
  6. ^ Mason, Blanche (1919). "Historical Sketch of Highland Park". Highland Park Public Library. Retrieved December 3, 2007.
  7. ^ a b Giles, H. H. (1879). "Wisconsin Railroads". The History of Racine and Kenosha Counties, Wisconsin. Chicago: Western Historical Company. pp. 173–185.
  8. ^ Ebner, Michael H. "Lake County, IL". Encyclopedia of Chicago. Retrieved September 21, 2007.
  9. ^ "Chicago & North Western – A Capsule History". Chicago & North Western Historical Society. Retrieved September 16, 2007.
  10. ^ Wronski, Richard (August 24, 2010). "New Metra Union Pacific North schedule snarls commute for many". Chicago Tribune. Archived from the original on December 19, 2013. Retrieved May 2, 2013.
  11. ^ Wronski, Richard (September 25, 2010). "Metra's UP North bridge project pitting city riders vs. suburbanites". Chicago Tribune. Archived from the original on December 24, 2014. Retrieved May 2, 2013.
  12. ^ "Reports". Kenosha-Racine-Milwaukee Commuter Link. Archived from the original on January 21, 2015. Retrieved May 2, 2013.
  13. ^ Sandler, Larry (July 25, 2011). "It's official: Rail line from Kenosha to Milwaukee is dead". Milwaukee Journal Sentinel. Archived from the original on November 7, 2015. Retrieved May 2, 2013.
  14. ^ Asiyanbi, Heather (November 4, 2015). "City Council Unanimously Approves Metra Study". Racine County Eye. Archived from the original on November 11, 2015. Retrieved November 4, 2015.
  15. ^ Wronski, Richard (July 20, 2009). "Public Transit's Private Club". Chicago Tribune. Archived from the original on October 23, 2015. Retrieved September 23, 2011.
KML is from Wikidata