===Funding===
===Funding===
A 2003 study commissioned by the Central Corridor Coordinating Committee placed the cost at US$840 million. Cost estimates placed the cost of the light rail line in 2003, at about US$957&nbsp;million, with the increase primarily due to inflation over the following decade.<ref name="MetCouncil_FAQ">{{cite web| title=Central Corridor LRT: Frequently asked questions| url=http://www.metrocouncil.org/transportation/ccorridor/ccfaq.htm| publisher= Metropolitan Council | date=June 27, 2008 | accessdate=2008-08-27}}</ref> On June 6, 2006, the light rail option was endorsed by the Central Corridor Coordinating Committee.<ref>{{cite news| first=Laurie| last=Blake| url=http://www.startribune.com/462/story/477369.html|title=Trains, not Buses on Central Corridor| publisher=[[Minneapolis Star-Tribune]]| date=June 6, 2006| accessdate=2006-06-07 |archiveurl = https://web.archive.org/web/20070102052158/http://www.startribune.com/462/story/477369.html <!-- Bot retrieved archive --> |archivedate = January 2, 2007}}</ref> The [[Metropolitan Council]] gave final approval to this decision on June 28, 2006.<ref>{{cite news| url=http://www.metrocouncil.org/news/2006/news_537.htm| title=Metropolitan Council approves light rail along Central Corridor| publisher=[[Metropolitan Council]]| date=June 28, 2006| accessdate=2008-08-27}}</ref>
A 2003 study commissioned by the Central Corridor Coordinating Committee placed the cost at US$840 million. Cost estimates placed the cost of the light rail line in 2003, at about US$957&nbsp;million, with the increase primarily due to inflation over the following decade.<ref name="MetCouncil_FAQ">{{cite web|title=Central Corridor LRT: Frequently asked questions |url=http://www.metrocouncil.org/transportation/ccorridor/ccfaq.htm |publisher=Metropolitan Council |date=June 27, 2008 |accessdate=2008-08-27 |deadurl=yes |archiveurl=https://web.archive.org/web/20110612083026/http://www.metrocouncil.org/transportation/ccorridor/ccfaq.htm |archivedate=June 12, 2011 |df= }}</ref> On June 6, 2006, the light rail option was endorsed by the Central Corridor Coordinating Committee.<ref>{{cite news| first=Laurie| last=Blake| url=http://www.startribune.com/462/story/477369.html|title=Trains, not Buses on Central Corridor| publisher=[[Minneapolis Star-Tribune]]| date=June 6, 2006| accessdate=2006-06-07 |archiveurl = https://web.archive.org/web/20070102052158/http://www.startribune.com/462/story/477369.html <!-- Bot retrieved archive --> |archivedate = January 2, 2007}}</ref> The [[Metropolitan Council]] gave final approval to this decision on June 28, 2006.<ref>{{cite news|url=http://www.metrocouncil.org/news/2006/news_537.htm |title=Metropolitan Council approves light rail along Central Corridor |publisher=[[Metropolitan Council]] |date=June 28, 2006 |accessdate=2008-08-27 |deadurl=yes |archiveurl=https://web.archive.org/web/20070928094446/http://www.metrocouncil.org/news/2006/news_537.htm |archivedate=September 28, 2007 |df= }}</ref>


The existing Blue Line has exceeded ridership predictions, as is the case with many other light rail lines constructed in the U.S. during the last decade.<ref>{{cite web | title = Hiawatha Light Rail Transit facts | publisher = Metropolitan Council | url = http://www.metrocouncil.org/about/facts/HiawathaLRTFacts.pdf | accessdate = 2008-04-09}}</ref> This led to some delays for the Central Corridor project because local transit officials were forced to retool ridership models before submitting projections to the [[Federal Transit Administration]] (FTA). The Metropolitan Council, which operates Metro Transit, submitted numbers showing that a light rail line would carry 43,000 passengers daily by the year 2030. The FTA agreed that the line would be cost-effective at this level, a key requirement for obtaining federal funding.<ref>{{cite news| first=Bill| last=Salisbury| url=http://www.twincities.com/mld/twincities/14154845.htm| title=Central Corridor light rail wins key OK| publisher=[[St. Paul Pioneer Press]]| date=March 22, 2006| accessdate=2006-04-05}}</ref>
The existing Blue Line has exceeded ridership predictions, as is the case with many other light rail lines constructed in the U.S. during the last decade.<ref>{{cite web | title = Hiawatha Light Rail Transit facts | publisher = Metropolitan Council | url = http://www.metrocouncil.org/about/facts/HiawathaLRTFacts.pdf | accessdate = 2008-04-09}}</ref> This led to some delays for the Central Corridor project because local transit officials were forced to retool ridership models before submitting projections to the [[Federal Transit Administration]] (FTA). The Metropolitan Council, which operates Metro Transit, submitted numbers showing that a light rail line would carry 43,000 passengers daily by the year 2030. The FTA agreed that the line would be cost-effective at this level, a key requirement for obtaining federal funding.<ref>{{cite news| first=Bill| last=Salisbury| url=http://www.twincities.com/mld/twincities/14154845.htm| title=Central Corridor light rail wins key OK| publisher=[[St. Paul Pioneer Press]]| date=March 22, 2006| accessdate=2006-04-05}}</ref>
Line 64: Line 64:
===Construction===
===Construction===
[[File:METRO Green Line construction (5596780051).jpg|thumb|Green Line under construction]]
[[File:METRO Green Line construction (5596780051).jpg|thumb|Green Line under construction]]
The first construction began in late 2010, including work in downtown St. Paul and near the University of Minnesota campus.<ref name="official site" /> By November 2011, construction was about 32% complete, including most heavy construction such as the installation of track segments, a new bridge, partial completion of stations, a rebuilt skyway in St. Paul and the construction of Green Line facilities at St. Paul Union Station.<ref>{{cite web|title=Heavy construction wrapping up on Central Corridor light-rail project|url=http://www.progressiverailroading.com/passenger_rail/article/Heavy-construction-wrapping-up-on-Central-Corridor-lightrail-project--28719|publisher=Progressive Railroading|accessdate=November 5, 2011|archiveurl=http://www.webcitation.org/62xJmzqv5|archivedate=November 4, 2011|date=November 3, 2011}}</ref>
The first construction began in late 2010, including work in downtown St. Paul and near the University of Minnesota campus.<ref name="official site" /> By November 2011, construction was about 32% complete, including most heavy construction such as the installation of track segments, a new bridge, partial completion of stations, a rebuilt skyway in St. Paul and the construction of Green Line facilities at St. Paul Union Station.<ref>{{cite web|title=Heavy construction wrapping up on Central Corridor light-rail project |url=http://www.progressiverailroading.com/passenger_rail/article/Heavy-construction-wrapping-up-on-Central-Corridor-lightrail-project--28719 |publisher=Progressive Railroading |accessdate=November 5, 2011 |archiveurl=http://www.webcitation.org/62xJmzqv5?url=http://www.progressiverailroading.com/passenger_rail/article/Heavy-construction-wrapping-up-on-Central-Corridor-lightrail-project--28719 |archivedate=November 5, 2011 |date=November 3, 2011 |deadurl=yes |df= }}</ref>


Due to scope of project, a venture was created by C.S. McCrossan and Ames to complete an area known as The Civil West Project. This area extended from the west side of the 35W abutment, over the Mississippi River, through the UofM campus and ending at Bedford St. From Bedford to Saint Paul, Walsh Construction served as the general contractor.
Due to scope of project, a venture was created by C.S. McCrossan and Ames to complete an area known as The Civil West Project. This area extended from the west side of the 35W abutment, over the Mississippi River, through the UofM campus and ending at Bedford St. From Bedford to Saint Paul, Walsh Construction served as the general contractor.


In July 2011, the Metropolitan Council officially named the Central Corridor as the Green Line.<ref name="color names">{{cite web|url=http://www.metrocouncil.org/newsletter/transit2011/TransitLineColorsJuly.htm|title=Met Council approves line color names for region's developing transitway system|publisher=[[Metropolitan Council]]|date=July 2011|accessdate=August 31, 2011}}</ref> As of August 2013, construction was completed and test trains began running over the line which opened to the public on June 14, 2014.<ref name="start" />
In July 2011, the Metropolitan Council officially named the Central Corridor as the Green Line.<ref name="color names">{{cite web|url=http://www.metrocouncil.org/newsletter/transit2011/TransitLineColorsJuly.htm |title=Met Council approves line color names for region's developing transitway system |publisher=[[Metropolitan Council]] |date=July 2011 |accessdate=August 31, 2011 |deadurl=yes |archiveurl=https://web.archive.org/web/20110807233244/http://www.metrocouncil.org/newsletter/transit2011/TransitLineColorsJuly.htm |archivedate=August 7, 2011 |df= }}</ref> As of August 2013, construction was completed and test trains began running over the line which opened to the public on June 14, 2014.<ref name="start" />


An interesting component of the Green Line project was the complexities in design layout. Land surveyors worked directly with over twelve subcontractors to complete the work. A particular area required exclusive attention and support, that being outside the University of Minnesota's biology department. Between Pleasant and Harvard streets there was 1/8" of tolerance between design and as-builds. Control factors used in the biology labs would be impacted by the electromagnetic radiation emitted from the nearby light rail. The 1/8" tolerance is said to cancel out any EMR that the light rail may produce.
An interesting component of the Green Line project was the complexities in design layout. Land surveyors worked directly with over twelve subcontractors to complete the work. A particular area required exclusive attention and support, that being outside the University of Minnesota's biology department. Between Pleasant and Harvard streets there was 1/8" of tolerance between design and as-builds. Control factors used in the biology labs would be impacted by the electromagnetic radiation emitted from the nearby light rail. The 1/8" tolerance is said to cancel out any EMR that the light rail may produce.

Revision as of 04:46, 9 June 2017

Metro Green Line
An eastbound Green Line train just across the Washington Avenue Bridge traveling past the Weisman Art Museum on the University of Minnesota's East Bank
Overview
StatusOperational (Phase One)
and planned (Phase Two)
LocaleMinneapolis-Saint Paul metropolitan:
Minneapolis and Saint Paul, Minnesota
Termini
Stations23 (18 stations on the corridor to St Paul & 5 shared with the Blue Line)
(17 more planned on the Southwest Corridor)
Service
TypeLight rail
SystemMetro Transit Light Rail
Operator(s)Metro Transit
Daily ridership37,402 (avg. weekday, 2015)[1]
History
OpenedJune 14, 2014[2]
Technical
Line length11 mi (18 km) (operational)[3]
26.8 mi (43.1 km) (planned)[citation needed]
CharacterAt-grade on surface
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationOverhead lines 750 V DC
Route map

Southwest extension (2027)
Southwest Station
Eden Prairie Town Center
Golden Triangle
City West
MN-62.svg MN 62
Opus
Shady Oak Road
Downtown Hopkins
Blake Road
Louisiana Avenue
Wooddale Avenue
Beltline Boulevard
West Lake Street
Kenilworth Channel
21st Street
Bryn Mawr
Bassett Creek Valley
Royalston Avenue/Farmers Market
Target Field
to Northstar Line and proposed
Duluth and Red Rock lines
Warehouse District/Hennepin Avenue
Nicollet Mall
Government Plaza
U.S. Bank Stadium
arrow for u Downtown fare zone
West Bank
East Bank
Stadium Village
Prospect Park
Westgate
Raymond Avenue
Fairview Avenue
Snelling Avenue
Hamline Avenue
Lexington Parkway
Victoria Street
Dale Street
Western Avenue
arrow for d Downtown fare zone
Capitol/Rice Street
Robert Street
10th Street
Central
Saint Paul Union Depot

Handicapped/disabled access All stations are accessible

The Metro Green Line (formerly called the Central Corridor) is an 11-mile (18 km)[3][4] light rail line that connects the central business districts of Minneapolis and Saint Paul in Minnesota as well as the University of Minnesota. An extension is being planned that would extend the line to the southwest connecting St. Louis Park, Hopkins, Minnetonka and Eden Prairie. The line follows the path of former Metro Transit bus route 16 along University Avenue and Washington Avenue (which runs from downtown Minneapolis through the University of Minnesota main campus). It is the second light-rail line in the region, after the Blue Line, which opened in 2004 and connects Minneapolis with the southern suburb of Bloomington.

Construction on the Green Line began in late 2010.[5] It opened to the public on June 14, 2014.[6] The travel time between the downtown Minneapolis and downtown St. Paul stops is about 46 minutes.[4] This entire line operates 24 hours a day, seven days a week.[7] In 2015, the line carried a total of 12.4 million passengers.[1]

History

Former streetcar and bus lines

The route is a descendant of the Twin City Rapid Transit Company's "St. Paul–Minneapolis" streetcar line, also known as the "Interurban" line. Streetcars became practical along the route with the advent of electrification, and full service began along the route on December 9, 1890.[8] In the 1950s, the decision was made to convert the streetcar system to buses. Streetcar service along the Interurban line ended in Saint Paul on October 31, 1953, and the route was the last to carry passengers in the city. Service continued a short while longer in Minneapolis until November 28.[9] However, due to fragmentary service elsewhere in Minneapolis, streetcars continued to use the tracks along University to reach the shops at Snelling Avenue in Saint Paul until June 1954. Twin City Lines continued to privately operate buses until 1970, when the company was taken over by the Metropolitan Transit Commission, a precursor to Metro Transit.

The route 16 bus was developed in the 1950s to replace the streetcar, and followed the route of the modern-day Green Line.[10] Other parallel service included freeway express service on route 94 and limited-stop service to the University of Minnesota on route 50.[11]

Proposals

In 1972, the Regional Fixed Guideway Study for the Metropolitan Transit Commission (the forerunner of today's Metro Transit) proposed a $1.3 billion 37- or 57-mile (sources differ) heavy-rail rapid transit system, but the then-separate Metropolitan Council disagreed with that idea – refusing to even look at the plan – and continuing political battles meant that it was never implemented. The Met Council had its own plans for bus rapid transit in the metropolitan region. Another system using smaller people movers was proposed in the 1975 Small Vehicle Fixed Guideway Study and gained the most traction with the Saint Paul city council, but was eventually dropped in 1980.

In the 1980s, light rail was proposed as an alternative and several possible corridors were identified, including the Central Corridor line which had a Draft Environmental Impact Statement (DEIS) drawn up in 1982.[12][13][14] It took another two decades before the Blue Line light rail line began operation. It began service on June 26, 2004, just over 50 years since the last regular-service streetcar ran on June 19, 1954.

Central Corridor Coordinating Committee

The Central Corridor Coordinating Committee was a workgroup in the Minneapolis-St. Paul area set up to explore transit options for the Central Corridor, the interurban corridor roughly following University Avenue in the Twin Cities area. After a long period of examination, this committee narrowed transit options for the corridor from a broad universe of choices to just three: a no-build option where services are only incrementally improved, a Bus Rapid Transit (BRT) option, wherein buses run on semi-dedicated transitway, and a Light Rail Transit (LRT) option using Light Rail Vehicles (LRVs). In May 2006 the CCCC concluded its study by publishing a Draft Environmental Impact Study, which concluded that LRT was the best option for the corridor. After a period of public meetings and public comment, the CCCC recommended on June 6, 2006 that the Metropolitan Council select LRT as the locally preferred alternative for the corridor and apply for preliminary engineering to begin.[15] On June 28, 2006, the Metropolitan Council concurred with the CCCC's decision and officially selected LRT as the locally preferred alternative.[16][17]

Metropolitan Council manages all transit, waterway, and other public resources for the seven-county area surrounding the Twin Cities, and as such, the Central Corridor project will now transition to Metropolitan Council. The work of the Central Corridor Coordinating Committee is now complete.

Funding

A 2003 study commissioned by the Central Corridor Coordinating Committee placed the cost at US$840 million. Cost estimates placed the cost of the light rail line in 2003, at about US$957 million, with the increase primarily due to inflation over the following decade.[18] On June 6, 2006, the light rail option was endorsed by the Central Corridor Coordinating Committee.[19] The Metropolitan Council gave final approval to this decision on June 28, 2006.[20]

The existing Blue Line has exceeded ridership predictions, as is the case with many other light rail lines constructed in the U.S. during the last decade.[21] This led to some delays for the Central Corridor project because local transit officials were forced to retool ridership models before submitting projections to the Federal Transit Administration (FTA). The Metropolitan Council, which operates Metro Transit, submitted numbers showing that a light rail line would carry 43,000 passengers daily by the year 2030. The FTA agreed that the line would be cost-effective at this level, a key requirement for obtaining federal funding.[22]

In April 2008, Governor Tim Pawlenty initially vetoed $70 million in funding for the Central Corridor project, along with other items, from the state budget. The funding was part of a state-local package of $227 million necessary to get federal transportation funds, and the future of the project was in doubt[23] until May 18, 2008, when a revised bonding bill including the $70 million for the Central Corridor was passed in the Legislature and signed into law by the governor.[24] In August 2009 the Central Corridor project received a Record of Decision from the Federal Transit Administration. The FTA found the project to have fully and accurately completed its environmental documentation with the publication of the Final Environmental Impact statement earlier in the summer, thus clearing the project for final design.[25]

Construction

Green Line under construction

The first construction began in late 2010, including work in downtown St. Paul and near the University of Minnesota campus.[5] By November 2011, construction was about 32% complete, including most heavy construction such as the installation of track segments, a new bridge, partial completion of stations, a rebuilt skyway in St. Paul and the construction of Green Line facilities at St. Paul Union Station.[26]

Due to scope of project, a venture was created by C.S. McCrossan and Ames to complete an area known as The Civil West Project. This area extended from the west side of the 35W abutment, over the Mississippi River, through the UofM campus and ending at Bedford St. From Bedford to Saint Paul, Walsh Construction served as the general contractor.

In July 2011, the Metropolitan Council officially named the Central Corridor as the Green Line.[27] As of August 2013, construction was completed and test trains began running over the line which opened to the public on June 14, 2014.[6]

An interesting component of the Green Line project was the complexities in design layout. Land surveyors worked directly with over twelve subcontractors to complete the work. A particular area required exclusive attention and support, that being outside the University of Minnesota's biology department. Between Pleasant and Harvard streets there was 1/8" of tolerance between design and as-builds. Control factors used in the biology labs would be impacted by the electromagnetic radiation emitted from the nearby light rail. The 1/8" tolerance is said to cancel out any EMR that the light rail may produce.

Additional stations

Central Station of the Green Line in downtown Saint Paul

Some in favor of the line have expressed concern with the number of stations.[28] The neighborhoods along University have demanded that the line have stations every half-mile, from Snelling to Rice Street, which would mean stations at Hamline Avenue, Victoria Street and Western Avenue. In February 2008, the Central Corridor Management Committee passed a resolution to include below-ground infrastructure for the Hamline, Victoria and Western stations "with the understanding that, if the CEI increases or other dollars are made available by mid-summer 2008, the first claim on those dollars would be one of the infill stations."[29] The Metropolitan Council has included this infrastructure work in their Draft Environmental Impact Statement and has also committed to building one station if any funds become available.

As of 2009, the Federal Transit Administration has increased the Cost Effectiveness Index such that buildout of one station is now feasible.[30] On January 25, 2010, the FTA announced that the three "infill" stations will be built. By 2016, five stations between Snelling and Rice Street were built - Hamline Ave, Lexington Pkwy, Victoria St, Dale St, and Western Ave. [31]

Opposition

Many businesses along the line were opposed to its development because of reduced access for automobiles.[28][32][33] Under the final plans, 87% of on-street parking disappeared along University Avenue between Raymond Avenue and Rice Street. At least one restaurant has cited light rail construction as a reason for closing.[34]

The corridor contains working-class residents and immigrant populations from Laos and Vietnam. Although the Green Line construction is mostly on an existing roadway and no land will be condemned, the disruption to existing transit and pedestrian ways was a concern to some groups. There is also concern that stops for light rail will be placed too far apart and along with reductions in bus service, transportation options for people will be reduced. Others are concerned about gentrification, where rising property values and taxes could force out lower-income residents.[35]

Others have opposed using Washington Avenue for a pedestrian transit mall and have opposed using the Washington Avenue bridge, citing traffic concerns, along with the age of the bridge, when other bridges upriver could be used to cross the Mississippi River: the 10th Avenue Bridge, the new I-35W bridge or the Northern Pacific Bridge Number 9. This last option was preferred by the University of Minnesota, which feared traffic disruption and vibration at some of their research facilities from use of the Washington Avenue route.[36] In late summer 2008, preliminary engineering reports showed that mitigation work could negate the effects of vibrations on university laboratory equipment. The University of Minnesota renewed its objections over vibration concerns along Washington Avenue in late 2009. Negotiations between the Metropolitan Council and the university continued into early 2010. A compromise was reached between the University and the Metropolitan Council and the Washington Avenue bridge was selected for use. As of Summer 2011, work had begun on the Washington Avenue bridge.

In January 2009, Minnesota Public Radio (MPR) raised concerns over the effects of the light-rail trains on their recording studios on Cedar Street in downtown St. Paul. MPR presented the results of an engineering study which they sponsored that conflicted with that performed by the Metropolitan Council. A settlement between MPR and other involved parties will keep the light rail trains on Cedar Street and will also compensate MPR for the addition of sound-proof upgrades to their studios.

Line color

In July 2011, the Metropolitan Council officially announced that the Central Corridor will be known as the Green Line. Corresponding transit lines will include the Blue Line (existing Hiawatha LRT), the Orange Line (under-construction I-35W BRT) and the Red Line.[27]

Extension

The line is to be extended to Southwest Station in Eden Prairie, Minnesota along the Southwest LRT. The extension will add 15 additional stations and 11.5 miles (18.5 km) of trackage to the line. Due to neighborhood opposition from the Kenwood neighborhood and additional studies on the environmental effects of the Southwest Corridor, the opening has been delayed to 2020. If approved by the city of Minneapolis, the Southwest Corridor would utilize the Kenilworth Rail Corridor and Cedar Lake Junction near downtown Minneapolis.

The Northstar Line commuter rail line connects downtown Minneapolis with northwestern suburbs, with a station at the north/western terminus of the Blue and Green Lines. The two light rail lines share trackage through downtown.

The eastern terminus of the Green Line is a street level station in front of the Saint Paul Union Depot, considered one of the great architectural achievements in the city and formerly one of the main points of departure for area train riders up until passenger rail service in the United States was restructured in the 1960s and 1970s. The concourse of the Union Depot is planned to become a transfer point for people coming into St. Paul along the proposed Rush Line commuter rail line. As of June 2014, Union Depot is a transit center for Metro Transit, MVTA, Jefferson Lines, Megabus, Greyhound buses and Amtrak's Empire Builder.

Bus service

Snelling Avenue Green Line station

Metro Transit Route 16 parallels the Green Line between St. Paul and the University of Minnesota. Route 50 formerly operated alongside Route 16 during weekdays, but with stops generally spaced about one-half mile apart. It was discontinued when the Green Line entered service. After the Green Line opened, Route 16 service was cut back from 1 AM to 5 AM, frequency was reduced to every 20 minutes and the route was truncated at the University of Minnesota.[37] In 2010, route 16 had an operating budget of $10 million and generated $3.7 million in revenue (a farebox recovery ratio of 37%), while Route 50 had a 2010 budget of $3.5 million and generated $1.3 million in revenue (37% farebox recovery ratio).[38] Route 16 carried about 5 million passengers, with weekday ridership averaging 16,880 and Saturday and Sunday ridership averaging 12,082 and 7,110, respectively. Route 50 carried about 1.5 million riders over the course of the year, with weekday ridership averaging 6,886.[38]

Metro Transit also provides weekday express bus service along Interstate 94 between the St. Paul and Minneapolis downtown areas.[39]

Vehicles

Siemens Industry Incorporated built 47 S70 Light Rail Vehicles for the Green Line,[40] at a per-LRV cost of $3,297,714 and a total contract value of $154,992,558.[41] The LRVs were built in Florin, California and the first vehicle was delivered on October 10, 2012.[42][43]

Safety

During testing of the Green line before it opened, there were four accidents recorded.[44] One accident was at Portland Avenue and 5th Street in Downtown Minneapolis. This intersection was already in use by Blue Line and is now being shared by the Blue and Green Lines. The first death occurred in August 2014,[45] when Shana Buchanan, former attorney, was struck by a train as she attempted to cross the tracks at Westgate Station.[46] On April 30, 2015, the Minnesota Senate's office of counsel and research receptionist Lynne Thomas was the second pedestrian killed by a Green Line train since it began operating.[47] On December 10, 2015, a third pedestrian, Nurto Abdi Aden, was struck and killed as she crossed the Green Line tracks near Hamline Avenue Station.[48]

References

  1. ^ a b "Metro Transit ridership tops 85.8 million in 2015" (Press release). Metro Transit. January 22, 2016. Retrieved August 3, 2016.
  2. ^ "Green Line Homepage" (Press release). Metropolitan Council. June 9, 2014. Retrieved June 9, 2014.
  3. ^ a b "Central Corridor - Route". Metropolitan Council. Retrieved June 15, 2014.
  4. ^ a b "Metro Green Line Fact Sheet". Metropolitan Council. 2014. Retrieved May 29, 2014.
  5. ^ a b "Central Corridor Light Rail Transit (LRT)". Metropolitan Council. 2010. Retrieved December 30, 2010.
  6. ^ a b Nelson, Tim (January 22, 2014). "Green Line light rail service to start June 14". Minnesota Public Radio. Retrieved January 22, 2014.
  7. ^ http://www.metrotransit.org/metro-green-line
  8. ^ Russell L. Olson (1976). The Electric Railways of Minnesota. Hopkins, Minnesota: Minnesota Transportation Museum, Inc. p. 37.
  9. ^ Olson. p. 65.
  10. ^ "Route 16: The original Minneapolis-St. Paul connection". Metro Transit. June 13, 2013. Retrieved November 7, 2016.
  11. ^ Platt, Adam (May 15, 2014). "Will Metro Transit's Green Line really replace 500 bus trips?". MinnPost. Retrieved November 7, 2016.
  12. ^ "A bold experiment: the Metropolitan Council at 40" (PDF). Metropolitan Council. Retrieved December 16, 2009.
  13. ^ Jeff Severns Guntzel (May 19, 2008). "A train linking Minneapolis and St. Paul? We had that scoop in 1984". City Pages. Retrieved February 17, 2010.
  14. ^ "ALL ABOARD: For the Transit Study that Never Ends". City Pages. September 5, 1984.
  15. ^ Blake, Laurie (June 6, 2006). "Trains, not Buses on Central Corridor". Minneapolis Star-Tribune. Archived from the original on January 2, 2007. Retrieved June 7, 2006. {{cite news}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  16. ^ "Metropolitan Council approves light rail along Central Corridor". Metropolitan Council. June 28, 2006. Archived from the original on September 28, 2007. {{cite news}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  17. ^ "Welcome to the Central Corridor". Central Corridor Coordinating Committee. Retrieved June 29, 2006.
  18. ^ "Central Corridor LRT: Frequently asked questions". Metropolitan Council. June 27, 2008. Archived from the original on June 12, 2011. Retrieved August 27, 2008. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  19. ^ Blake, Laurie (June 6, 2006). "Trains, not Buses on Central Corridor". Minneapolis Star-Tribune. Archived from the original on January 2, 2007. Retrieved June 7, 2006.
  20. ^ "Metropolitan Council approves light rail along Central Corridor". Metropolitan Council. June 28, 2006. Archived from the original on September 28, 2007. Retrieved August 27, 2008. {{cite news}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  21. ^ "Hiawatha Light Rail Transit facts" (PDF). Metropolitan Council. Retrieved April 9, 2008.
  22. ^ Salisbury, Bill (March 22, 2006). "Central Corridor light rail wins key OK". St. Paul Pioneer Press. Retrieved April 5, 2006.
  23. ^ Salisbury, Bill; Dave Orrick (April 9, 2008). "Central Corridor dead – or alive?". St. Paul Pioneer Press. {{cite news}}: |access-date= requires |url= (help)
  24. ^ Scheck, Tom (May 18, 2008). "Deal reached at Capitol with little time to spare". Minnesota Public Radio.
  25. ^ "Central Corridor Project Record of Decision". Metropolitan Council. August 19, 2009. Retrieved August 20, 2009.
  26. ^ "Heavy construction wrapping up on Central Corridor light-rail project". Progressive Railroading. November 3, 2011. Archived from the original on November 5, 2011. Retrieved November 5, 2011. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  27. ^ a b "Met Council approves line color names for region's developing transitway system". Metropolitan Council. July 2011. Archived from the original on August 7, 2011. Retrieved August 31, 2011. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  28. ^ a b Foti, Jim (February 25, 2008). "Central Corridor: Cost concerns put Plan B in driver's seat". Minneapolis Star-Tribune. Retrieved August 27, 2008.
  29. ^ "Meeting of the Central Corridor Management Committee February 27, 2008" (PDF). Central Corridor Management Committee. February 27, 2008. Retrieved August 20, 2009.
  30. ^ "FY 2009 New Starts and Small Starts Evaluation and Rating Process". Federal Transit Administration. 2009. Retrieved August 20, 2009.
  31. ^ http://www.metrotransit.org/metro-green-line
  32. ^ Havens, Chris (July 29, 2008). "Giving up parking spots on University, but for what?". Minneapolis Star-Tribune. Retrieved August 27, 2008.
  33. ^ Yuen, Laura (August 11, 2008). "University Avenue business owners step up opposition to LRT". Minnesota Public Radio. Retrieved August 27, 2008.
  34. ^ Slavik, Rachel (March 31, 2011). "Porky's in St. Paul To Close Doors Sunday". CBS Minnesota. Retrieved January 25, 2012.
  35. ^ Yuen, Laura (April 9, 2006). "Rondo haunting light-rail debate". St. Paul Pioneer Press. Retrieved April 9, 2006.
  36. ^ Foti, Jim (May 28, 2008). "Volume rises as U, Met Council debate Central Corridor route". Minneapolis Star-Tribune. Retrieved August 27, 2008.
  37. ^ "Local Bus Route 16 schedule" (PDF). Metro Transit. Retrieved March 23, 2015.
  38. ^ a b "Central Corridor Transit Service Study Existing Conditions Report" (PDF). Metro Transit. 2012. p. 52. Retrieved March 30, 2012.
  39. ^ "Metro Transit - Online Schedules - Route 94". www.metrotransit.org. Retrieved May 17, 2017.
  40. ^ http://www.metrotransit.org/new-light-rail-vehicles-begin-service
  41. ^ "Transportation Committee Business Item 2010-275" (PDF). Metropolitan Council. July 30, 2010. Retrieved August 6, 2010.
  42. ^ Kevin Giles (August 25, 2010). "Central Corridor contracts awarded". Star Tribune. Retrieved August 28, 2010.
  43. ^ "First Central Corridor light rail vehicle, rebranded Hiawatha LRV meet the press" (PDF). Metro Council. October 10, 2012. Retrieved October 21, 2012.
  44. ^ Blume, Paul - New Green Line endures 4th crash before opening day KMSP Fox 9, June 9, 2014
  45. ^ Nelson, Tim. "Authorities ID woman killed by Green Line train". www.mprnews.org. Retrieved February 24, 2016.
  46. ^ Lindberg, Joseph and Emily Gurnon -Woman killed by Green Line train was a former attorney. Pioneer Press, September 3, 2014
  47. ^ Woltman, Nick (April 30, 2015). "Pedestrian killed in Green Line accident was 'very safety conscious'". TwinCities.com. Retrieved May 7, 2015.
  48. ^ Collins, Jon. "Blue Line train hits, kills bicyclist in Minneapolis". www.mprnews.org. Retrieved February 24, 2016.
KML is from Wikidata