Jump to content

Datunludong station

Coordinates: 40°00′14″N 116°25′03″E / 40.003841°N 116.417377°E / 40.003841; 116.417377
From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by Deefun (talk | contribs) at 11:56, 20 June 2024. The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
Datunludong

大屯路东
Beijing Subway
Line 5 northbound platform

Line 15 platform
General information
Other namesDatundong[1][2] (大屯东)
LocationBeiyuan Road (北苑路) and Datun Road (大屯路)
Datun Subdistrict, Chaoyang District, Beijing
China
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)
Platforms4 (1 island platform and 2 side platforms)
Tracks4
Construction
Structure typeElevated (Line 5)
Underground (Line 15)
AccessibleYes
History
OpenedOctober 7, 2007; 17 years ago (2007-10-07) (Line 5)
December 26, 2015; 8 years ago (2015-12-26)
(Line 15)
Services
Preceding station Beijing Subway Following station
Beiyuanlubei Line 5 Huixin Xijie Beikou
Anli Lu Line 15 Guanzhuang
towards Fengbo
Location
Datunludong is located in Beijing
Datunludong
Datunludong
Location in central Beijing

Datunludong station[3] (simplified Chinese: 大屯路东站; traditional Chinese: 大屯路東站; pinyin: Dàtúnlù Dōng Zhàn) is an interchange station of Line 5 and Line 15 on the Beijing Subway.

History

[edit]
Interchange corridor under construction

The line 5 station opened on October 27, 2007. It was too small to handle the interchange between line 5 and 15, so the line 15 station was left unopened when the western extension was opened in December 2014. From October to December 2015, the line 5 station was closed to widen the station and build a transfer corridor.[4] The line 15 station opened on December 26, 2015,[5] one year later than the other stations on the line.

Station layout

[edit]

The line 5 station has 2 elevated side platforms. The line 15 station has an underground island platform.

Exits

[edit]

There are 5 exits in operation, lettered A1, B1, B2, G, and H2. Exits A1, B1 and G are accessible.

Exit H1 is under planning.

[edit]

References

[edit]
  1. ^ 北京晚报 (2004-03-12). "北京密织轨道交通网 地铁10号线二期规划亮相". Archived from the original on 2004-03-15. 立水桥站、立水桥南站、北苑西站、大屯东站、惠新西桥站、北土城东路站、和平西桥站
  2. ^ "Beijing Subway Plan 2008" (PDF). Argonne National Laboratory. Archived from the original (PDF) on 2010-05-28.
  3. ^ "JPG格式线路图下载". Archived from the original on 2024-01-02. Retrieved 2024-05-11.
  4. ^ "10月17日起5号线蒲黄榆站、大屯路东站因换乘改造施工临时封站". Beijing Subway (in Chinese). Archived from the original on 2020-05-08. Retrieved 2020-09-18.
  5. ^ "两条地铁线今日试运营". Beijing Daily (in Chinese). Archived from the original on 2015-12-27. Retrieved 2020-09-18.
[edit]

40°00′14″N 116°25′03″E / 40.003841°N 116.417377°E / 40.003841; 116.417377