METRORail

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Brmedia (talk | contribs) at 15:56, 1 August 2014 (updated website). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

METRORail
A Houston METRORail train
Overview
OwnerMetropolitan Transit Authority of Harris County
LocaleHouston (Texas, USA)
Termini
  • Fannin South (south)
  • Northline Transit Center Station/HCC (north)
Stations24 (open)[1]
15 (under construction; 39 altogether)
WebsiteGo METRORail
Service
TypeLight rail
SystemMetropolitan Transit Authority of Harris County
ServicesRed Line (route 700)
Operator(s)Metropolitan Transit Authority of Harris County
Rolling stock37 Siemens S70 (also called Avanto)
History
OpenedJanuary 1, 2004
Technical
Line length12.8 mi (20.6 km)[2]
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Minimum radius350 ft (107 m)
Highest elevationat grade, shared with streets
Route map
Template:Infobox rdt

METRORail is the 12.8-mile (20.6 km)[2] light rail line in Houston, Texas (USA). With an average weekday ridership of 38,300, METRORail ranks as the second most-travelled light rail system in the Southern United States and the 14th most-traveled light rail system in the United States, with the second highest ridership per track mile.[3] METRORail is operated by the Metropolitan Transit Authority of Harris County (METRO).

History

This line was built after an approximately 20-year battle,[4] starting in 1983 when voters rejected a rail plan by referendum.[5] Voter referendum in 1988 approved a 20 mile light rail plan;[6] however, Bob Lanier was elected mayor in 1992 and stopped the plan.[5] In 1991, U.S. Rep. Tom DeLay, removed $65 million in federal funding for the rail line.[5] Then, Houston drew up a rail plan with entirely local funding. In 2001, several groups sued to stop construction, claiming that the METRO organization was a "private business" and subject to Houston City Charter provisions regulating business use of its streets;[7] they obtained 2 temporary injunctions in January 2001, which were reversed by appeals court on March 9, 2001.[7]

Ground was broken on this line on March 13, 2001.[8] The opening of METRORail, which took place on January 1, 2004, came 64 years after the previous streetcar system had been shut down.[9] The cost was $325 million [10] Houston was the largest city in the United States without a rail system after the 1990 opening of the Blue Line in Los Angeles.

Tom DeLay strongly opposed construction of the METRORAIL line and twice blocked federal funding for the system in the United States House of Representatives.[11] Thus the Metrorail was built without any federal funding until November 2011 when a $900 million grant was approved for expansions.[12]

In spite of the opposition of some groups to the Metrorail, surveys conducted by Stephen Klineberg and Rice University have shown consistent increases in support of rail transport and decreases in support for bigger and better roads/highways in the Houston metropolitan area in recent years.[13][14][15] Klineberg considers these changes a "paradigm shift" or "sea change" on attitudes towards mass transit.[13][15][16]

Ridership

In the first year of METRORail, ridership, though increasing from 12,102 in January to 32,941 in October, tapered off slightly in the last two months of the year, and "fell short of the 35,000 goal transit officials had set" in early 2004, according to the Houston Chronicle.[17] The line reached 75 million boardings in December 2011, four years ahead of schedule,[18] but throughout that year, ridership numbers remained flat or showed small decreases.[19] By 2012, average weekday ridership was 36,250.[20]

Notable records in ridership have occurred on the following dates:[21]

  • February 1, 2004: 64,005 passengers rode the METRORail to Super Bowl XXXVIII
  • February 23, 2004: 54,193 passenger boardings were recorded, the highest weekday at the time
  • February 27, 2007: 56,388 passengers were recorded the day of the Houston Livestock Show and Rodeo
  • March 15, 2012: 70,611 passengers were recorded; many of whom attended the Houston Livestock Show and Rodeo and a performance by The Band Perry after the rodeo at the Reliant Park sports complex.[22]
  • March 19, 2014: 76,925 passengers were recorded due in part to the Houston Livestock Show and Rodeo.[23]

Route and infrastructure

The route is a 12.8-mile (20.6 km)[2] double-tracked, 4 ft 8+12 in (1,435 mm) standard gauge line with 24 stations[1] approximately a 12-mile (0.8 km) apart, running from UH–Downtown to the Northline Transit Center Station/HCC Railway Technology. The entire route is at grade and on city streets. Power supply is from 600/750 Volt DC overhead wires with nine substations.[24] The line follows Main Street for 8 stations from UH–Downtown to Wheeler Station, then follows Fannin Street for the remainder of the route until Fannin South. However, northbound trains run on San Jacinto Street (rather than Fannin) for a small section of the route between the Wheeler and Museum District stations. The tracks are usually in the center of the street; however, the southbound tracks between the Wheeler and Museum District stations "hug the left curb" according to one source.[25]

Significant businesses and institutions along this route include the University of Houston–Downtown, Houston's restaurant district near Preston Station, the Downtown Transit Center, Houston's museum district, Rice University, Memorial Hermann Hospital, the Texas Medical Center, and Reliant Astrodome.

A Park and Ride parking lot is available at one station: Fannin South.[26][27] It has approximately 1,200 parking spaces.[24] Parking fees included a daily rate of $3 and a monthly hangtag contract of $40.

Architectural firm Pierce Goodwin Alexander & Linville, of Houston, Texas, was in charge of the final architectural/engineering design and design support, with a $2.3 million contract.[24] However, all stations south of Burnett Transit Center were designed by the Houston office of St. Louis-based architectural firm Hellmuth, Obata and Kassabaum.[28] All the stations are of similar design—250-feet long and partially covered by glass roofs. Station length was constrained by the distance between crosswalks in downtown city blocks; station platforms are low-floor and 350mm high.[24]

The right-of-way and the stations were built by three contractors for approximately $115 million: Texas Sterling Construction Co. of Houston, Bencon Management of Houston, and Beers Construction Co. of Atlanta.[7] The line construction was divided into five sections, with a resident engineer for each section, to speed up construction.[24]

The route can handle three minute headways during peak hours[29] and has a design capacity of 8,000 people/hour in each direction while using two car trains with such a headway.[30]

The line has a yard and a maintenance facility connected by loop track to the south of the Fannin South station.[25]

Rolling stock

Houston operates a fleet of 18 Siemens-built Avanto S70 light-rail vehicles, delivered in 2003-2004,[31] purchased for $118 million,[7] and built in Florin, California.[24] Each 96-foot (29 m) long, double-articulated vehicle has four low-platform doors per side, is 70% low-floor, and has a capacity of 72 seated and approximately 169 standing passengers, or a total capacity of around 241 per car.[24][32] This approximately 250-person capacity has been reached on certain Super Bowl weekends.[33] These S70 cars have a top speed of 66 mph (106 km/h).[34] On this system, trains are operated as single cars or in 2-car sets.

METRO Red Line train approaching the Preston station
The inside cabin of a METRORail train

For future expansion of the METRORail system, Metro had originally turned to CAF USA, with a total order of 105 cars.[35] This order was cancelled in February 2011 as it did not meet the "Buy America" clause. CAF gave a refund, which METRO will apply to new cars.[36]

In the spring of 2011, METRO purchased 19 Siemens Avanto S70 cars (the same model as its original 18) that were originally slated for Utah Transit Authority's UTA TRAX system for $83 million.[34][37] The cars are being built in Florin, California,[34] and differ slightly from the cars Utah received in detail, including having more air-conditioning units.[18] They were slated to be delivered in October 2012 and enter service by that December.[38] METRO said that these cars were ordered to accommodate ridership that was 4 years ahead of expectations and to get cars more quickly.[18]

In September 2011, the METRO approved the purchase of 39 cars from CAF upon receipt of a new proposal from CAF that is compliant with Federal Transit Administration (FTA) and Buy America guidelines.[39][40]

Fares

The standard fare for this rail line is $1.25 for both cash and MetroQ Fare Card riders; $3 for a Day Pass. The discount fare of $0.60 available for MetroQ Fare Card riders who are seniors 65-69, disabled, Medicare cardholders, or full-time students (elementary, high school, and university); $1.50 for a Day Pass. All discount riders must show ID (except for elementary and high school students).[41] Free transfers to METRO buses are available with the MetroQ Fare Card only, for 3 hours in the same direction only. The MetroQ Fare Card holders can earn "Rider Rewards" of 5 free trips for every 50 paid trips.[41] Tickets and cards are purchased from machines at the stations. No charge applies to Houston Texans home game days, nor to seniors over 70.

Tickets and cards are checked by inspectors randomly aboard trains. Failure to pay the fare is a Class C Misdemeanor and is subject to a fine of up to $500. Consumption of alcoholic beverages is prohibited on the train platform and subject to the same fine as a Class C Misdemeanor.[42]

Operations

The light rail line operates all 7 days of the week. It begins operations at 4:30 a.m. weekdays and 5:30 a.m. weekends, and ends service at midnight Monday thru Thursday nights, 2:20 a.m. Friday and Saturday nights and 11:40 p.m. Sunday nights. Scheduled train frequency varies from 6 minutes during the day on weekdays to 20 minutes after 9 P.M. on all days.

The scheduled time for an end-to-end trip through the entire12.8-mile (20.6 km) route is on average 50 minutes.[43]

METRORail operations are controlled from Houston TranStar, a traffic and emergency management center for the city and surrounding region.[24] One source claims that the trains have priority signalling at intersections.[24] However, another source claims that the trains do not have signal priority at intersections in the vicinity of the medical centers, but at several intersections north of the medical centers the traffic lights for road traffic in all directions turn red when a train crosses the intersections.[44]

Controversies

This line has been the subject of several controversies from critics. It also has several supporters. Some businesses along the Main Street route applauded the line when it opened because of the anticipation of more business in the area.[10] The line has been credited for an increase in the population in Houston's core area (in the Houston Downtown Management District) [33] Light rail supporters noted the higher than anticipated early ridership statistics for this line.[45] Numerous Houston politicians such as Houston representative Sheila Jackson Lee [46] and former Houston Mayor Lee P. Brown [47] and even one state-level Texas Republican politician, Senator Kay Bailey Hutchison,[46][48][49] have supported the line.

Crashes

For a full year before the Metrorail system's opening, a program to prepare drivers to share Houston streets with the Metrorail trains was conducted, consisting of driver safety classes, community forums, and public service announcements.[50] However, in the beginning of METRORail's operation, the line averaged 11 crashes per track mile per year, compared with the national average of 0.55 for similar rail systems, giving rise to local derogatory nicknames among detractors such as the "Wham Bam tram"[51][52][53][54][55][56][57][58][59][60] and becoming part of Houston lore.[61] METRO has consistently blamed driver error as the cause of the high collision rate and the transit agency's police department regularly tickets motorists who cross paths with the train. METRO also argued that an independent panel of transportation experts at Texas A&M University issued a report in 2004 finding no fundamental flaws with the Metrorail system, although this report did recommend minor adjustments to signal timing and signage.[62]

For accidents occurring during the first year and a half of operation, the METRO and its police have blamed all but one on pedestrians getting too close to the tracks or motorists making illegal turns or running red lights.[63] Red light running is the main cause in downtown, whereas near the Texas Medical Center illegal turns are the main cause.[64] Some of the people involved in the crashes have claimed that poor signage and signal layouts have contributed to the problem. Critics argue that such a high rate of driver error must be attributable to an environment conducive to it.[51]

Critics have also noted the fact that the system is at-grade,[63] while supporters contend that lack of federal funding due to political opposition made construction of a grade separated rail line unfeasible.[65] Supporters of the METRO also claim that the Main Street corridor that the train travels upon had a high accident rate even before the METRORail entered service.[65] METRO has rearranged some signals and altered some sign arrangements to try to make things clearer.[66] These new signal arrangements decreased the accident rate to a fourth of its former level by August 2005, approximately 20 months after opening.[64] Sociology and urban studies professor Stephen Klineberg argues that the high rate of crashes in Houston is attributable to the high rate of automobile driving and low rate of walking in Houston.[50]

CAF-USA Expansion Order Controversy

The Federal Transit Administration investigated whether METRO's plan to order light-rail vehicles built for five new rail lines by Construcciones y Auxiliar de Ferrocarriles (CAF) violated federal "Buy America" rules. All federally funded projects require rolling stock to be assembled in the United States. If METRO violated the rules, $900 million in federal funds could be rescinded. METRO argued that its plan to have CAF build the 2 prototype cars for this order in Spain was permitted because only local funds were used for these cars and this order was separate from the order for the remaining 103 cars (to be built the US with federal funds).[67][68] However, the FTA disagreed, stating that the prototype contract was an "integral" part of the total contract [69] and that METRO's overall compliance to the rules was the most important issue.[68]

In February 2008, the Federal Transit Administration (FTA) responded to an inquiry that was made by a prospective rail car supplier. [citation needed] In March 2008, the FTA outlined this as one of the issues regarding the North/Red Line Extension and Southeast/Purple Line. [citation needed] The FTA wanted a response from then-president Frank Wilson in April 2010,;[70] whether he responded is unknown. METRO argued that they were purchasing "off the shelf, standard vehicles" to which (they claim) the rules do not apply.[71] In a July 2010 Record of Decision on the University Line, the FTA instructed METRO to refrain from purchasing any trains.[72] According to internal METRO emails, when Frank Wilson was approached by railcar contractor Siemens AG in January 2009 with what Siemens claims was a low bid on 29 new cars for the Red Line/Red Line Extension and the East End/Green Line, he allowed them to make their presentation but avoided any type of discussion or negotiation.[73]

On September 8, 2010, the FTA found METRO in violation of the rules, stating that METRO must rebid the contract.[74] The FTA blamed the previous METRO administration for "both alarming and disturbing" findings. METRO was blamed for working together with CAF to avoid numerous provisions in "Buy America" to the point that CAF had an advantage over other domestic firms.[citation needed]The FTA stated that the federal funds could be approved if METRO rectified the situation.[75][76][77][78] An online copy of the report is available.[79]

METRO announced that all new line construction would be delayed by up to a year.[80] Construction of the Uptown and University lines was threatened due to the FTA decision.[81] Texas Governor Rick Perry argued that former Houston mayor Bill White needed to own up to his decision to appoint Frank Wilson as the METRO CEO.[82] A stop-work order was issued by METRO to CAF USA, and METRO considered what could be done to retrieve the $40 million invested already.[83] CAF faced an investigation in order to confirm is it still qualified to be a bidder. [citation needed] CAF USA argued that the FTA decision was based upon incomplete and incorrect information and requested that the FTA reconsider it.[84] CAF threatened to sue METRO if they rebid,[85] and the METRO considered litigation "likely".[83] METRO planned to deal with a $430 million budget cut by removing 160 printers.[86] Property owners whose land were taken for the planned METRO lines complained about their land and that the lines may never be built.[87]

In September 2011, the METRO approved the purchase of 39 cars from CAF upon receipt of a new proposal from CAF that is compliant with Federal Transit Administration (FTA) and Buy America guidelines.[39][40]

Examiner.com claims, in an article titled "Houston METRO Transit uses local money to bail out another 'Buy America' problem", that Buy America violations also disqualified 1,200 radios purchased by METRO.

Other Controversies

During the 2003 expansion referendum, critics of the system opposed METRO for spending public funds for "educational advertisements" about the proposed system, which critics claimed promote the referendum.[88]

The main political action committee (PAC) supporting the bond was accused of having a conflict of interest because it received over US$100,000 in contributions from contractors and equipment suppliers for METRORail who stood to gain financially from its expansion.[88][dead link] This includes a US$50,000 donation from Siemens AG, the corporation which built METRORail's original 18 trains.

In November 2007, local NBC station, KPRC Local 2, reported that METRORail did not respond to disabled patrons, resulting in one being stranded. According to KPRC, little was done after 3 years of complaints.[89]

The METRO agency was accused of document shredding in January 2010.[90] This led to an investigation by the Harris County District Attorney,[91] followed by a seizing of documents by investigators.[92] Mayor Annise Parker replaced five members on METRO's board in order to move ahead.[93] CEO Frank Wilson resigned in May and the case was settled by June 2010.[94] METRO was acquitted of any wrongdoing on July 27, 2010 by the Harris County District Attorney.[95] However, Mayor Parker asked for further investigation, which showed that there were no records of METRO committee meeting decisions.[96] Michael Reed argued that METRO had been deteriorating financially under Frank Wilson.[97]

Allegations were made that METRO lied about the income from their sales tax revenue to allow them to gain $900 million in federal funds for all five planned rail expansions.[98] However, city officials found no such attempt by METRO to mislead them,[99] but the Federal Transit Administration continued to withhold its approval for the money until further figures can be examined.[100]

METRO has been criticized in blogs.[101][102][103][104][105]

The Woodlands (an unincorporated Houston suburb) became entangled with the City of Houston when it agreed to pay a sum of money in order to avoid annexation. This has led to the Woodlands area funding another METRORail project in which light rail stations would be better connected and walkways expanded. Comments about this have given rise to allegations of extortion.[106]

Future expansion

The new North line began operation on 21 December 2013, while the Southeast and East End lines are tentatively scheduled to be completed sometime during 2014.[107][108] Central Station will also be added to the current Red Line in order to provide transfers to/from both the Southeast/Purple and the East End/Green lines.[109]

In August 2010, a budget shortfall of $49 million was announced by METRO, which has halted progress on the University/Blue Line. The line has already received a final Federal Record of Decision but there are no official words regarding when construction would start or how the line would be funded.[110] METRO previously claimed that the completion of construction and opening of the Red Line Extension would be by 2013[111] and the East End/Green Line by 2014.[112] However, METRO announced on September 9, 2010 that the opening dates for the North, Southeast, and East End lines had been pushed back to 2014,[113] and by December 2011 the start date had slipped back to 2015.[108]

On December 8, 2011, the FTA announced an award of $900 million, broken into two $450 million grants from the New Starts transit program, to fund construction of the North and Southeast lines, by that time estimated to begin service in 2015.[108]

Following METRO's 2010 annual audit, the agency has decided to cancel the Burnett Plaza project. This is part of a US$168,000,000 asset liquidation. The price of the land US$21,000,000 is valued separately.[114]

METRO offered the public a chance to name stations on its expansion lines.[8]

Due to lack of funds, it was announced in early 2013 that the Uptown/Gold Line will be constructed initially as a bus rapid transit line. The design will feature the ability to easily convert the line to light rail in the future. This will allow the line to be functional as early as 2017.[115]

Line Name Distance Route Status
  North / Red Line Extension 5.3 mi (8.5 km)[2] UH–Downtown Station to the Northline Transit Center Opened December 21, 2013
  Southeast / Purple Line 6.6 mi (10.6 km)[2] Smith Street in Downtown Houston to the Palm Center at MLK & Griggs Street Under construction
  East End / Green Line 3.3 mi (5.3 km)[2] Smith Street in Downtown Houston to the Magnolia Transit Center Under construction
  University / Blue Line 11.4 mi (18.3 km)[2][116] Hillcroft Transit Center to the Eastwood Transit Center[116] Planned
  Uptown / Gold Line 4.8 mi (7.7 km)[2] Bellaire/South Rice Station on Westpark to the Northwest Transit Center Planned

See also

References

  1. ^ a b "METRORail Rider Guide" (PDF) (pdf). Metropolitan Transit Authority of Harris County, Houston, Texas. December 22, 2013. Retrieved 2014-01-08.
  2. ^ a b c d e f g h "METRO About Us". Metropolitan Transit Authority of Harris County, Houston, Texas. Retrieved 2013-07-23.
  3. ^ APTA Q4 2013 Light Rail Transit Ridership Report
  4. ^ "Trains finally roll in Houston rail system". CNN. 2003-12-31.
  5. ^ a b c http://soc.hfac.uh.edu/artman/publish/article_39.shtml
  6. ^ http://soc.hfac.uh.edu/artman/publish/article_302.shtml
  7. ^ a b c d Houston Breaks Ground for First Light Rail Line. Lightrailnow.org. Retrieved on 2013-08-15.
  8. ^ a b Light rail stations closer to getting names - Houston Chronicle. Chron.com (2011-07-07). Retrieved on 2013-08-15.
  9. ^ "MAIN STREET LIGHT RAIL / New ride for the new year / Festivals mark inaugural day for Metro train." Houston Chronicle. January 1, 2004.
  10. ^ a b Houston: Metro's Light Rail Opens in the Citadel of Asphalt. Lightrailnow.org (2004-01-01). Retrieved on 2013-08-15.
  11. ^ "Trains finally roll in Houston rail system - Jan. 1, 2004". CNN.com. 2003-12-31. Retrieved 2012-01-22.
  12. ^ "METRO to get $900 million in federal funds for light rail expansion projects | abc13.com". Abclocal.go.com. 2011-11-28. Retrieved 2012-01-22.
  13. ^ a b Wendy Natt, Apr 22, 09. "Survey shows strong support for transit". Houston Tomorrow. Retrieved 2012-01-22.{{cite web}}: CS1 maint: multiple names: authors list (link) CS1 maint: numeric names: authors list (link)
  14. ^ "METRO Connections 2009". Ridemetro.org. Retrieved 2012-01-22.
  15. ^ a b "Houstonians more positive about city despite economic woes, annual survey finds". e! Science News. 2009-04-20. Retrieved 2012-01-22.
  16. ^ Houston Business Journal (2009-04-20). "Houstonians say there's no place like home, survey finds - Houston Business Journal". Bizjournals.com. Retrieved 2012-01-22. {{cite news}}: |author= has generic name (help)
  17. ^ Houston rail ridership breezes past other cities - Houston Chronicle. Chron.com (2005-01-17). Retrieved on 2013-08-15.
  18. ^ a b c Thanks to Utah, Metro will get rail cars in 2012 - Houston Chronicle. Chron.com (2011-02-25). Retrieved on 2013-08-15.
  19. ^ Metro ridership lags despite pricy gas | Houston Politics | a Chron.com blog. Blog.chron.com (2011-04-22). Retrieved on 2013-08-15.
  20. ^ "Fiscal Year 2012 Monthly Ridership Report METROBus and METRORail" (PDF), Monthly Ridership Report, METRO, 3/7, p. 17 {{citation}}: |first= missing |last= (help); Check date values in: |date= and |year= / |date= mismatch (help)
  21. ^ "METRORail riding sets record". Houston Business Journal. 2007-02-28. Retrieved 2012-01-04.
  22. ^ "Rodeo helps Metro set rail record". The Houston Chronicle. 2012-03-15. Retrieved 2012-03-19.
  23. ^ "Metro rail record lasted less than a week before being shattered". The Houston Chronicle. 2014-03-21. Retrieved 2014-03-20.
  24. ^ a b c d e f g h i Houston MetroRail System. Railway Technology (2011-06-15). Retrieved on 2013-08-15.
  25. ^ a b Houston, Texas. world.nycsubway.org (2004-01-01). Retrieved on 2013-08-15.
  26. ^ Park and Ride Locations. Ridemetro.org. Retrieved on 2013-08-15.
  27. ^ Fannin South Park and Ride. Ridemetro.org. Retrieved on 2013-08-15.
  28. ^ [1][dead link]
  29. ^ Appeals Court Gives Green Light to Houston Light Rail Project. Lightrailnow.org. Retrieved on 2013-08-15.
  30. ^ Houston Light Rail: The Case for Building on What We Have. Lightrailnow.org. Retrieved on 2013-08-15.
  31. ^ "Vehicles Lines". Siemens. Retrieved 2009-11-08.
  32. ^ "S70 Light Rail Vehicle - Houston" (PDF). Siemens AG. May 2007. Retrieved 2009-11-08.
  33. ^ a b Houston's MetroRail Alleviates Congestion as Riders Fill LRT Trains. Lightrailnow.org. Retrieved on 2013-08-15.
  34. ^ a b c Nusca, Andrew. (April 6, 2011) Siemens lands $83 million contract for light rail in Houston. SmartPlanet. Retrieved on 2013-08-15.
  35. ^ "Metro approves historic contract to build more light rail: Construction brings jobs to Houston". Houston Chronicle. May 15, 2010. Retrieved 2010-05-17.
  36. ^ "METRO Receives Refund From Spanish Rail Car Vendor". METRO News Release. February 16, 2011. Retrieved 2011-02-26. METRO has received a $14 million dollar refund from CAF, the Spanish rail car vendor.
  37. ^ http://press.siemens.us/index.php?s=43&item=1366
  38. ^ Morris, Mike (February 24, 2011). "Thanks to Utah, Metro will get rail cars in 2012". Houston Chronicle. Retrieved 2011-02-26. Metro will take delivery of 19 new rail cars for its Main Street line in late 2012 from an unlikely source — Utah.
  39. ^ a b "Houston Metro CAF rail vehicle purchase moving ahead - News". METRO Magazine. November 30, 2011. Retrieved 2012-01-22.
  40. ^ a b "News Release September 29, 2011". Ridemetro.org. September 29, 2011. Retrieved 2012-01-22.
  41. ^ a b http://www.ridemetro.org/SchedulesMaps/Pdfs/700-redline.pdf
  42. ^ METRORail Paid Fare Zones. Ridemetro.org. Retrieved on 2013-08-15.
  43. ^ "MetroRail Rider Guide" (PDF). Metropolitan Transit Authority of Harris County.
  44. ^ An Excursion on Houston Metro Rail. Greg-vassilakos.com. Retrieved on 2013-08-15.
  45. ^ "Light Rail Now! NewsLog - Light Rail Transit News". Lightrailnow.org. Retrieved 2013-09-23.
  46. ^ a b "TexMessage: Houston legislators laud light rail investment | Texas on the Potomac | a Chron.com blog". Blog.chron.com. 2011-11-29. Retrieved 2013-09-23.
  47. ^ The Associated Press (2004-01-02). "Houston light rail opens amid much fanfare | Amarillo.com | Amarillo Globe-News". Amarillo.com. Retrieved 2013-09-23.
  48. ^ "| Archives | Chron.com - Houston Chronicle". Chron.com. Retrieved 2013-09-23.
  49. ^ http://soc.hfac.uh.edu/artman/publish/article_104.shtml
  50. ^ a b Howlett, Debbie (2004-03-23). "Houston's crash course in light rail". Usatoday.Com. Retrieved 2012-01-22.
  51. ^ a b Gaver, John (2004-03-18). "The Wham-Bam-Tram". Action America. Retrieved 2007-10-25.
  52. ^ "Metro no 'wham bam tram'". Azcentral.com. 2006-05-11. Retrieved 2013-09-23.
  53. ^ Connelly, Richard (2011-01-14). "Metro Danger Train Cure: Warning Labels". Blogs.houstonpress.com. Retrieved 2013-09-23.
  54. ^ "Danger Train". PubliusTX.net. Retrieved 2013-09-23.
  55. ^ "Houston Metro Danger Train". Wn.com. Retrieved 2013-09-23.
  56. ^ "Danger Train draws blood on Friday the 13th (blogHOUSTON - The Stream)". blogHOUSTON. Retrieved 2013-09-23.
  57. ^ "Houston Pages | Wham-Bam-Tram". Actionamerica.org. Retrieved 2013-09-23.
  58. ^ "A Streetcar Named Disaster | Planetizen: The Urban Planning, Design, and Development Network". Planetizen. 2004-03-07. Retrieved 2013-09-23.
  59. ^ "UnSound Transit: Houston Light Rail - "A Streetcar Named Disaster"". Unsoundtransit.blogspot.com. 2008-03-10. Retrieved 2013-09-23.
  60. ^ Patton, Zach (2009-12-11). "Phoenix Drivers Confused by Light Rail". Governing.com. Retrieved 2013-09-23.
  61. ^ Dewan, Shaila K. (2004-06-25). "Houston Finds Some Pain in Car-Rail Coexistence". The New York Times.
  62. ^ LUCAS WALL, Copyright 2004 Houston Chronicle (2004-03-09). "Report: Rail design not to blame for vehicle accidents - Houston Chronicle". Chron.com. Retrieved 2012-01-22.{{cite web}}: CS1 maint: numeric names: authors list (link)
  63. ^ a b RAD SALLEE, Copyright 2005 Houston Chronicle (2005-05-10). "Video shows train had green light in fatal crash - Houston Chronicle". Chron.com. Retrieved 2012-01-22.{{cite web}}: CS1 maint: numeric names: authors list (link)
  64. ^ a b "Houston Light Rail - Houston's Drivers Are Awful! - Houston motor vehicle accidents". Lightrailnow.org. Retrieved 2012-01-22.
  65. ^ Sallee, Rad (2006-03-12). "Pavement signals will flash at 2 trouble spots". Houston Chronicle. Retrieved 2007-10-25.
  66. ^ Mike Snyder, Houston Chronicle (2010-04-29). "‘Buy America' probe of Metro unresolved - Houston Chronicle". Chron.com. Retrieved 2012-01-22.
  67. ^ a b Mike Snyder, Houston Chronicle (2010-05-14). "Voicemail key to Metro's claim it adheres to 'Buy America' - Houston Chronicle". Chron.com. Retrieved 2012-01-22.
  68. ^ Mike Snyder, Houston Chronicle (2010-09-12). "Firm warns axing Metro deal will cost money, jobs - Houston Chronicle". Chron.com. Retrieved 2012-01-22.
  69. ^ Snyder, Mike. "FTA: Metro's new trains may violate "Buy America" rule | Houston & Texas News | Chron.com - Houston Chronicle". Chron.com. Retrieved 2011-04-09.
  70. ^ ‘Buy America' probe of Metro unresolved Transit chief meets feds in D.C., tries to end fight over Spanish vendor
  71. ^ http://www.metrosolutions.org/clients/1068/354067.pdf
  72. ^ Knight, Paul (2010-08-27). "Metro: E-Mails Show How Not To Negotiate To Buy Rail Cars - Houston News - Hair Balls". Blogs.houstonpress.com. Retrieved 2011-04-09.
  73. ^ "Feds: Houston light rail expansion violates rules". BusinessWeek. 2010-09-08. Retrieved 2011-04-09.
  74. ^ "Busted! Houston Violates Buy American Provision, Gets in Bed with Spanish – AltTransport: Your Guide to Smarter Ways of Getting Around". Alttransport.com. 2010-09-08. Retrieved 2011-04-09.
  75. ^ http://www.hcnonline.com/articles/2010/09/08/eastex_advocate/news/3810metro_ea.txt
  76. ^ "Federal Investigation Puts Light Rail Projects on Hold". Myfoxhouston.com. 2010-09-08. Retrieved 2011-04-09.
  77. ^ Snyder, Mike (2010-09-09). "Metro riders must wait longer for new rail lines | Houston & Texas News | Chron.com - Houston Chronicle". Chron.com. Retrieved 2011-04-09.
  78. ^ "Report of Investigation (Signed) 2010-09-03". Scribd.com. Retrieved 2011-04-09.
  79. ^ Connelly, Richard (2010-09-09). "Metro "Clarifies" That Feds' Ruling Will Delay Light Rail Construction - Houston News - Hair Balls". Blogs.houstonpress.com. Retrieved 2011-04-09.
  80. ^ "FTA: Metro violated law; $900 million grant stalls - Houston Community Newspapers: News". Hcnonline.com. Retrieved 2011-04-09.
  81. ^ "Perry blames Houston Metro's legal woes on White". Houston Chronicle. 9 September 2010. Archived from the original on 11 September 2010. Retrieved 23 January 2012. [dead link]
  82. ^ a b Knight, Paul (2010-09-15). "Walmart Tagged, Metro Gets Spotlight At City Council - Houston News - Hair Balls". Blogs.houstonpress.com. Retrieved 2011-04-09.
  83. ^ Snyder, Mike (2010-09-17). "Rail car firm asks feds to reconsider nixing Metro deal | Houston & Texas News | Chron.com - Houston Chronicle". Chron.com. Retrieved 2011-04-09.
  84. ^ Snyder, Mike. "Firm warns axing Metro deal will cost money, jobs | Houston & Texas News | Chron.com - Houston Chronicle". Chron.com. Retrieved 2011-04-09.
  85. ^ Knight, Paul (2010-09-16). "Metro Tackles Huge Budget Gap...By Getting Rid Of Some Office Printers? - Houston News - Hair Balls". Blogs.houstonpress.com. Retrieved 2011-04-09.
  86. ^ "METRO Probe Irks People Who Lost Land". Myfoxhouston.com. 2010-09-08. Retrieved 2011-04-09.
  87. ^ a b The METRO Money Train [dead link]
  88. ^ "Handicapped Riders Complain About METRORail - Houston News Story - KPRC Houston". Click2houston.com. 2007-11-01. Archived from the original on 3 January 2008. Retrieved 2011-04-09.
  89. ^ "METRO Accused Of Shredding Documents - Houston News Story - KPRC Houston". Click2houston.com. 2010-02-25. Archived from the original on 27 February 2010. Retrieved 2011-04-09.
  90. ^ "Mayor Calls For METRO Investigation - Houston News Story - KPRC Houston". Click2houston.com. 2010-02-25. Retrieved 2011-04-09. [dead link]
  91. ^ "Documents Seized From METRO - Houston News Story - KPRC Houston". Click2houston.com. 2010-04-08. Archived from the original on 11 April 2010. Retrieved 2011-04-09.
  92. ^ "All aboard: Mayor's reshaping of Metro is off to a promising start | Editorial | Chron.com - Houston Chronicle". Chron.com. 2010-03-20. Retrieved 2011-04-09.
  93. ^    (2010-06-01). "METRO, attorney to settle document destruction lawsuit | abc13.com". Abclocal.go.com. Retrieved 2011-04-09.{{cite web}}: CS1 maint: extra punctuation (link)
  94. ^ Rogers, Brian (2010-07-27). "Harris DA clears Metro of document shredding | Houston & Texas News | Chron.com - Houston Chronicle". Chron.com. Retrieved 2011-04-09.
  95. ^ "METRO releasing results of external review into document shredding and other policies | abc13.com". Abclocal.go.com. 2010-08-19. Retrieved 2011-04-09.
  96. ^ "Examiner's Reed on METRO's deteriorating finances (blogHOUSTON - The Stream)". blogHOUSTON. 2010-08-18. Retrieved 2011-04-09.
  97. ^ "Did Metro try to deceive feds to get $900M? | khou.com | Khou.com - News, Houston news, Texas News, Headlines". Khou.com. Retrieved 2011-04-09.
  98. ^ "Metro, city officials deny effort to mislead FTA | Houston Politics | Chron.com - Houston Chronicle". Blogs.chron.com. Retrieved 2011-04-09.
  99. ^ "Feds take action on Metro rail lines to protect taxpayers | khou.com | Khou.com - News, Houston news, Texas News, Headlines". Khou.com. Retrieved 2011-04-09.
  100. ^ Posted by Tom at April 20, 2010 12:01 AM (2010-04-20). "Houston's Clear Thinkers: Houston Metro in a few years". Blog.kir.com. Retrieved 2011-04-09.{{cite web}}: CS1 maint: numeric names: authors list (link)
  101. ^ Posted by Tom at March 22, 2010 12:01 AM (2010-03-22). "Houston's Clear Thinkers: The bad Metro bet". Blog.kir.com. Retrieved 2011-04-09.{{cite web}}: CS1 maint: numeric names: authors list (link)
  102. ^ King, Bill (2010-03-20). "Metro expansion plan rests on myths and falsehoods | Viewpoints, Outlook | Chron.com - Houston Chronicle". Chron.com. Retrieved 2011-04-09.
  103. ^ Advarion Incorporated - NJN (2010-03-16). "Bill King: Public Policy Blog". Billkingblog.com. Retrieved 2011-04-09.
  104. ^ King, Bill (2010-08-25). "King: Metro's at-grade rail plan will leave a sorry legacy | Viewpoints, Outlook | Chron.com - Houston Chronicle". Chron.com. Retrieved 2011-04-09.
  105. ^ "The Woodlands funds more Houston projects". Ultimate The Woodlands. 2010-07-02. Retrieved 2011-04-09. [dead link]
  106. ^ Glentzer, Molly (2013-08-08). "MetroRail commissions art for new light-rail stations". Houston Chronicle. Retrieved 2013-09-23.
  107. ^ a b c "$900m awarded to extend Houston's light rail system". Rail.co. December 8, 2011. Retrieved December 9, 2011. {{cite web}}: Cite has empty unknown parameter: |1= (help)
  108. ^ By:. "Southeast Line Downtown Segment Updates". Metrosolutions.org. Retrieved 2011-04-09.{{cite web}}: CS1 maint: extra punctuation (link)
  109. ^ JOHN PERERAWeb Producer (2010-04-26). "Final Approval on University Light-Rail Line". Myfoxhouston.com. Retrieved 2011-04-09.
  110. ^ Sarnoff, Nancy (2010-05-29). "Rail puts Fulton Corridor on the verge of a boom | Business | Chron.com - Houston Chronicle". Chron.com. Retrieved 2011-04-09.
  111. ^ "Metro announces $49M budget shortfall | khou.com | KHOU.com Home Page". khou.com. Retrieved 2011-04-09.
  112. ^ JOHN PERERA (2010-04-26). "Rail Lines Will Not Meet Oct. 2013 Deadline". Myfoxhouston.com. Retrieved 2011-04-09.
  113. ^ "Metro writing off $168 million in worthless assets - Houston Community Newspapers: News". Yourhoustonnews.com. Retrieved 2011-04-09.
  114. ^ "Post Oak redesign drops rail for bus lane". Houston Chronicle. 2013-02-10.
  115. ^ a b "University Line FTA Approval". Gometrorail.org. Retrieved 2011-04-09.

External links

Template:Link GA