Jump to content

Line 6 (Hangzhou Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Rosguill (talk | contribs) at 17:02, 2 February 2021 (merge appears to have been completed). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 6
 6 
Train of Line 6 is departing from Olympic Sports Center Station
Overview
StatusPartially operational
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang
Termini
  • Goujulong
  • Shuangpu (Shuangpu Branch)
    West Guihua Road (Fuyang Branch)
Stations36
(28 in service)
Service
TypeRapid transit
SystemHangzhou Metro
Services2
Operator(s)Hangzhou Metro Corporation
Depot(s)Shuangpu Depot
Fenbei Stabling Yard
Songjiatang Depot
Rolling stock6 cars, type AH
History
Opened30 December 2020; 3 years ago (2020-12-30)
Technical
Line length58.5 km (Phase 1: 27.0 km, Phase 2: 8.3 km, Fuyang: 23.2 km)
CharacterUnderground
Track gauge1,435mm
ElectrificationOverhead line, 1,500 V DC
Operating speed100km/h (62mph)
Line 6
Simplified Chinese杭州地铁六号线
Traditional Chinese杭州地鐵六號線
Transcriptions
Standard Mandarin
Hanyu PinyinHǎngzhōu Dìtiě Lìuhào Xiàn
Line 6 drawn to scale.

Line 6 (Chinese: 杭州地铁6号线) is a partially operational subway line of the Hangzhou Metro. The line runs from Template:HZM stations (in Xihu) and Template:HZM stations (in Fuyang), merging at Template:HZM stations station, stretching through the south bank of Qiantang River before turning northwest and ending at Template:HZM stations. It connects Fuyang District with Binjiang, Hangzhou Sports Park Stadium, Qianjiang Century City and Hangzhou East Railway Station. The line is 58.75 km (36.51 mi) long. Phase 1 and Fuyang Section was opened on 30 December 2020, phase 2 is planned to be operational by 2021.[1]The line's color is blue. In future planning, the stations from Shuangpu to Xiaming Street will merge to Line 12.

Opening timeline

Segment Commencement Length Station(s) Name
Shuangpu — Qianjiang Century City 30 December 2020 26.95km 17 Phase 1
Xiangshan Campus,CAA — West Guihua Road 30 December 2020 23.47km 11 Fuyang Section (former Fuyang Line)

Stations

Station name Connections Date opened Location Section
English Chinese
Goujulong 枸桔弄 Under Construction Jianggan Phase 2
East Railway Station 火车东站  1   4  Hangzhou East railway station HGH
Yuanbaotang 元宝堂
Tanhua'an Road 昙花庵路
Sanbao 三堡
Asian Sports Village 亚运村 Xiaoshan
Fengbei 丰北 Phase 1
Qianjiang Century City 钱江世纪城  2  30 December 2020
Expo Center 博览中心
Olympic Sports Center 奥体中心  7  Xiaoshan/

Binjiang

Xingmin 星民 Binjiang
Jiangling Road 江陵路  1 
Jianghan Road 江汉路
Changhe 长河  5 
Jianye Road 建业路
Chengye Road 诚业路
Weiye Road 伟业路
Zhejiang Chinese Medical University 中医药大学  4 
Xipu Road 西浦路
Zhipu Road 之浦路 Under Construction Xihu
West Fenghua Road 枫桦西路 30 December 2020
Xiangshan Campus China Academy of Art 美院象山  6  (Train service to Shuangpu)
Template:HZM stations 音乐学院 Fuyang Section
Zhongcun 中村
Template:HZM stations 野生动物园东 Fuyang
Yinhu 银湖
Template:HZM stations 虎啸杏
Template:HZM stations 受降
Template:HZM stations 富阳客运中心
Gaoqiao 高桥
Template:HZM stations 新桥
Template:HZM stations 公望街
Template:HZM stations 桂花西路
Xiangshan Campus China Academy of Art 美院象山  6  (Train service to West Guihua Road) 30 December 2020 Xihu Phase 1
Xiaming Street 霞鸣街
Kehai Road 科海路
Shuangpu 双浦

See also

References

  1. ^ "4条地铁同时开通!杭州十城区实现地铁全覆盖". baijiahao.baidu.com. Retrieved 2021-01-01.