Line 6 (Hangzhou Metro)
Appearance
This article needs additional citations for verification. (January 2018) |
Line 6 | |
---|---|
6 | |
Overview | |
Status | Partially operational |
Owner | City of Hangzhou |
Locale | Hangzhou, Zhejiang |
Termini |
|
Stations | 36 (28 in service) |
Service | |
Type | Rapid transit |
System | Hangzhou Metro |
Services | 2 |
Operator(s) | Hangzhou Metro Corporation |
Depot(s) | Shuangpu Depot Fenbei Stabling Yard Songjiatang Depot |
Rolling stock | 6 cars, type AH |
History | |
Opened | 30 December 2020 |
Technical | |
Line length | 58.5 km (Phase 1: 27.0 km, Phase 2: 8.3 km, Fuyang: 23.2 km) |
Character | Underground |
Track gauge | 1,435mm |
Electrification | Overhead line, 1,500 V DC |
Operating speed | 100km/h (62mph) |
Line 6 | |||||||
---|---|---|---|---|---|---|---|
Simplified Chinese | 杭州地铁六号线 | ||||||
Traditional Chinese | 杭州地鐵六號線 | ||||||
|
Line 6 (Chinese: 杭州地铁6号线) is a partially operational subway line of the Hangzhou Metro. The line runs from Template:HZM stations (in Xihu) and Template:HZM stations (in Fuyang), merging at Template:HZM stations station, stretching through the south bank of Qiantang River before turning northwest and ending at Template:HZM stations. It connects Fuyang District with Binjiang, Hangzhou Sports Park Stadium, Qianjiang Century City and Hangzhou East Railway Station. The line is 58.75 km (36.51 mi) long. Phase 1 and Fuyang Section was opened on 30 December 2020, phase 2 is planned to be operational by 2021.[1]The line's color is blue. In future planning, the stations from Shuangpu to Xiaming Street will merge to Line 12.
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Shuangpu — Qianjiang Century City | 30 December 2020 | 26.95km | 17 | Phase 1 |
Xiangshan Campus,CAA — West Guihua Road | 30 December 2020 | 23.47km | 11 | Fuyang Section (former Fuyang Line) |
Stations
See also
References
- ^ "4条地铁同时开通!杭州十城区实现地铁全覆盖". baijiahao.baidu.com. Retrieved 2021-01-01.