Jump to content

Chiwan station

Coordinates: 22°28′46″N 113°53′56″E / 22.47944°N 113.89889°E / 22.47944; 113.89889
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Nwaiotbaw (talk | contribs) at 02:35, 21 October 2023. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Chiwan

赤湾
Shenzhen Metro
Chinese name
Traditional Chinese赤灣
Simplified Chinese赤湾
Literal meaningRed/Bare bay
Transcriptions
Standard Mandarin
Hanyu PinyinChì Wān
Yue: Cantonese
JyutpingCek3 Waan1
General information
LocationNanshan District, Shenzhen, Guangdong
China
Operated bySZMC (Shenzhen Metro Group)
Line(s)     Line 2
     Line 5
Platforms4 (2 island platforms)
Tracks4
ConnectionsShekou West railway station Shekou West
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code
  • 201 (Line 2)
  • 501 (Line 5)
History
OpenedLine 2: 28 December 2010; 13 years ago (2010-12-28)
Line 5: 28 September 2019; 5 years ago (2019-09-28)
Services
Preceding station SZM Shenzhen Metro Following station
Terminus Line 2 Shekou Port
towards Liantang or Xiaomeisha
Liwan
towards Huangbeiling
Line 5 Terminus
Route map
B2F,     Line 2
(Up arrow Shekou Port)
B2F (Line 2)
(Down arrow Shekou West Depot)
B2F,     Line 5
(Down arrow Liwan)

Chiwan station (simplified Chinese: 赤湾站; traditional Chinese: 赤灣站; pinyin: Chìwān Zhàn; Jyutping: Cek3 Waan1 Zaam6) is the southwest terminal metro station on Line 2 and Line 5 of the Shenzhen Metro. It opened on 28 December 2010. The Line 5 platforms opened on 28 September 2019.[1]

Station layout

G Exit
B1F
Concourse
Lobby Customer Service, Shops, Vending machines, ATMs
B2F
Platforms
Platform      Line 2 termination platform
Island platform, doors will open on the left, right
Platform      Line 2 towards Yantian Road (Shekou Port)
Platform      Line 5 towards Huangbeiling (Liwan)
Island platform, doors will open on the left, right
Platform      Line 5 towards Huangbeiling (Liwan)


Exits

Exit Destination
Exit B North Side of Zuopaotai Road, North Side of Chiwan 6th Road (E), North Side of Hanggang Road (E), Gangji Building, Shanhaijin
Exit C Hanggang Road, Chiwan Village, West Side of Xinghai Boulevard (S), Metro Security Inspection Battalion of Luohu Security Company, Shunsheng Logistics Shekou Warehouse
Exit D West Side of Xinghai Boulevard (N), Shekou Station
Exit E North Side of Chiwan 6th Road (W), Chiwan School, Shanyu Haiyuan

References

  1. ^ "Line 5 extension to open Sept. 28-Latest News-Shenzhen Government Online". english.sz.gov.cn. Archived from the original on 28 September 2019.


22°28′46″N 113°53′56″E / 22.47944°N 113.89889°E / 22.47944; 113.89889