Line 5 (Ningbo Rail Transit)
Line 5 | |
---|---|
5 | |
Overview | |
Status | Under construction |
Owner | Ningbo |
Locale | Ningbo, Zhejiang, China |
Termini | |
Stations | 22 |
Service | |
Type | Rapid transit |
System | Ningbo Rail Transit |
Operator(s) | Ningbo Rail Transit Co.,Ltd. |
History | |
Opened | 2021 |
Technical | |
Line length | 27.6 km (17.15 mi) |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 5 of Ningbo Rail Transit (Chinese: 宁波轨道交通5号线) is a rapid transit line under construction in Ningbo. It starts from west Yinzhou District and ends in Xingzhuang Road Station in Zhenhai District. In the future extension plan, the line will extend and become a loop.[1] The construction of the first section started on September 28, 2016.[2] The line will use fully automated trains.[3]
Route
Line 5 starts from Buzheng Station in western Yinzhou District as an underground line. Then it goes along Yinxian Road and passes the Fenghua River until it reaches Xiaying and turns north. Then the line goes along first Haiyan Road and then Yuanshi Road. Then the line passes the Yong River and reaches its destination, Xingzhuang Road Station.[4]
Stations
Phase 1 (open in 2021)
Station name | Connections | Location | |
---|---|---|---|
English | Chinese | ||
Template:NingboRT stations | 布政 | Haishu | |
Template:NingboRT stations | 张家潭 | ||
Template:NingboRT stations | 同德路 | ||
Template:NingboRT stations | 石碶 | 2 | |
Template:NingboRT stations | 雅渡 | ||
Template:NingboRT stations | 庙堰 | Yinzhou | |
Template:NingboRT stations | 钟公庙 | ||
Template:NingboRT stations | 鄞州区政府 | 3 | |
Template:NingboRT stations | 钱湖南路 | ||
Template:NingboRT stations | 南高教园区 | 4 | |
Template:NingboRT stations | 下应路 | ||
Template:NingboRT stations | 大洋江 | ||
Template:NingboRT stations | 泗港 | ||
Template:NingboRT stations | 曹隘 | ||
Template:NingboRT stations | 柳隘 | ||
Template:NingboRT stations | 海晏北路 | 1 | |
Template:NingboRT stations | 民安东路 | 7 | |
Template:NingboRT stations | 会展中心 | ||
Template:NingboRT stations | 院士路 | 6 | |
Template:NingboRT stations | 盎孟港 | ||
Template:NingboRT stations | 三官堂 | 2 | Jiangbei |
Template:NingboRT stations | 兴庄路 | Zhenhai | |
*Station names might be changed in construction.
References
- ^ "宁波市轨道交通5号线工程可行性研究及相关专题研究(其他)招标公告". Ningbo Development and Reform Council. 2011-04-15. Archived from the original on 2014-03-14. Retrieved 2012-03-21.
- ^ "地铁5号线一期今天上午开工!工期5年" (in Chinese). 甬派客户端. 2016-09-28. Retrieved 2016-09-28.
- ^ 魏诗瑶, 蔡玲玲. "捷报传来!中控信息中标宁波轨道交通5号线全自动运行系统项目". WeChat Official Accounts Platform. Retrieved 2020-05-19.
- ^ Ningbo Environment Protection Design Group, Environment impact report of Line 5, Ningbo Rail Transit, Ningbo, January, 2016