Jump to content

Line 28 (Beijing Subway)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Garuda3 (talk | contribs) at 22:26, 21 October 2020 (→‎History). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 28
 28 
Overview
Other name(s)M28 (planned name)
CBD line
StatusPlanned[1]
LocaleChaoyang district
Beijing
Termini
Stations9
Service
TypeRapid Transit
SystemBeijing Subway
Rolling stock6-car Type LB
Technical
Line length8.877 km (Phase 1)[2]
CharacterUnderground
Operating speed80 km/h[2]

Line 28 of the Beijing Subway (Chinese: 北京地铁28号线; pinyin: běijīng dìtiě èrshíbā hàoxiàn) is a planned rapid transit line in Beijing. It was formerly known as CBD line.

Construction was expected to start in 2019 and complete in 2022.[1]

It will use 6-car Type LB linear motor rolling stock, similar to the Capital Airport Express of Beijing Subway, and Guangzhou Metro's Line 4, Line 5 and Line 6.[1]

List of Stations

Station Name[2] Connections Distance
km
Location
English Chinese
Template:BJS stations 东大桥  6   17   Pinggu  Chaoyang
Template:BJS stations (Jintaixizhao) 京广桥 (金台夕照)  10   Pinggu 
Template:BJS stations 光华路
Template:BJS stations 核心区
Template:BJS stations 大望路  1   14 
Template:BJS stations 北京东站  Bcr  Sub-Central Beijing East railway station BOP
Template:BJS stations 大郊亭  7 
Template:BJS stations 广渠路
Template:BJS stations 广渠东路

History

In August 2015, planning authorities proposed an underground automatic people mover (APM) line through the Central Business District (CBD).[3]

According to the most recent plan announced in August 2019, the line will run 8.877 km (5.516 mi), have 9 stations from Dongdaqiao to Guangqudonglu.[2] The line is upgraded to a subway line, not an automatic people mover (APM).[citation needed]

A feasibility study for the line was approved in October 2020.[4]

Notes

References

  1. ^ a b c http://bj.people.com.cn/n2/2018/1201/c82840-32355186.html
  2. ^ a b c d "北京地铁28号线最新车站方案公布:5座车站可以换乘". 2019-08-20.
  3. ^ Cao Zheng (曹政) (13 August 2015). CBD拟通'地下小火车:初步设8站 呈Z形斜穿'. Beijing Daily. Archived from the original on 26 November 2015. Retrieved 12 November 2015.
  4. ^ www.bjnews.com.cn. "地铁28号线可行性研究报告批复,纳入今年北京市政府重点工程". www.bjnews.com.cn. Retrieved 2020-10-21.