Jump to content

Line 3 (Ningbo Rail Transit)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Waacstats (talk | contribs) at 15:03, 6 December 2020 (–{{PRChina-rail-transport-stub}}, –{{Metro-stub}}, +{{PRChina-metro-stub}} using StubSorter). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 3
 3 
Line 3 platform of Yinzhou Government station
Overview
StatusOperational
OwnerNingbo
LocaleNingbo, Zhejiang, China
Termini
Stations15
Service
TypeRapid transit
SystemNingbo Rail Transit
Operator(s)Ningbo Rail Transit Co.,Ltd.
History
Opened30 June 2019; 5 years ago (2019-06-30)[1]
Technical
Line length16.73 km (10.40 mi)[1]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Route map

Line 3 of Ningbo Rail Transit (Chinese: 宁波轨道交通3号线) is a rapid transit line in Ningbo. It starts from south Yinzhou District and ends in Datong Bridge Station in Jiangbei District. In the future extension plan, the line will further extend into Luotuo Area in Zhenhai District.[2] The construction of the first section, from south Yinzhou to Datong Bridge, started on December 23, 2014.[3]

Route

Line 3 starts from Gaotang Bridge Station in south Yinzhou District as an underground line. Then it turns into east-west direction on Yinzhou Avenue and makes a further turn into Ningnan South Road and goes in north-south direction again until it reaches Songjiang Middle Road. Then it runs to northeast to Qiubi and then crosses Yongtaiwen Railway from which it goes in north-south direction and extends along Zhongxing Road until it crosses Yongjiang River and reaches its destination, Datong Bridge Station.[4]

Opening timeline

Segment Commencement Length Station(s) Name
Datong Bridge — Gaotang Bridge 30 June 2019[1] 16.73 km (10.40 mi)[1] 15 Line 3 (Phase 1)

Stations

Section Station name Connections Distance
km
Location
English Chinese
Line 3 Template:NingboRT stations 大通桥  2  Jiangbei
Template:NingboRT stations 中兴大桥南 Yinzhou
Template:NingboRT stations 明楼  6 
Template:NingboRT stations 体育馆  7 
Template:NingboRT stations 樱花公园  1 
Template:NingboRT stations 儿童公园  4 
Template:NingboRT stations 仇毕
Template:NingboRT stations 钱湖北路
Template:NingboRT stations 锦寓路
Template:NingboRT stations 四明中路
Template:NingboRT stations 鄞州区政府  5 
Template:NingboRT stations 南部商务区
Template:NingboRT stations 鄞州客运总站
Template:NingboRT stations 句章路
Template:NingboRT stations 高塘桥
Yinfeng line (through operation) Template:NingboRT stations 姜山
Template:NingboRT stations 狮山
Template:NingboRT stations 明辉路
Template:NingboRT stations 朝阳
Template:NingboRT stations 方桥 Fenghua
Template:NingboRT stations 琎琳
Template:NingboRT stations 南渡
Template:NingboRT stations 大成东路
Template:NingboRT stations 金海路

References

  1. ^ a b c d http://zjnews.zjol.com.cn/zjnews/nbnews/201906/t20190620_10374840.shtml
  2. ^ "我委批复轨道交通3号线一期工程可行性研究报告". Ningbo Municipal Development & Reform Commission (in Chinese). November 3, 2014. Archived from the original on November 4, 2014.
  3. ^ "宁波地铁3号线一期开工 2019年试营". qjwb.com.cn (in Chinese). December 23, 2014. Archived from the original on December 23, 2014.
  4. ^ China Railway Siyuan Survey and Design Group, Environment impact report of Line 3, Ningbo Rail Transit, Wuhan, February, 2014