INS Vikrant (2013)
Vikrant being moved for fitting out in June 2015
| |
History | |
---|---|
India | |
Name | INS Vikrant |
Namesake | The decommissioned Majestic-class aircraft carrier of the same name |
Owner | Ministry of Defence |
Operator | Indian Navy |
Ordered | 2004 |
Builder | Cochin Shipyard Limited |
Laid down | 28 February 2009 |
Launched | 12 August 2013 |
Completed | July 2020[2] |
Commissioned | End of 2021(expected)[3] |
Motto | Sanskrit जयेम सं युधि स्पृध: "I defeat those who fight against me". |
Status | In Trials[4] |
General characteristics | |
Displacement | 40,000 tonnes (44,000 short tons) |
Length | 262 m (860 ft) |
Beam | 62 m (203 ft) |
Draught | 8.4 m (28 ft) |
Depth | 25.6 m (84 ft) |
Decks | 2.5 acres (110,000 sq ft; 10,000 m2) |
Installed power | 4 × General Electric LM2500+ gas turbines 2 × Elecon COGAG gearbox |
Propulsion | Two shafts |
Speed | 28 knots (52 km/h; 32 mph) |
Range | 8,000 nautical miles (15,000 km; 9,200 mi)[5] |
Crew | 196 officers, 1,449 sailors (including air crew)[6] |
Sensors and processing systems | |
Armament | |
Aircraft carried |
|
Aviation facilities | 10,000 m2 (110,000 sq ft) flight deck |
INS Vikrant, also known as Indigenous Aircraft Carrier 1 (IAC-1),[12] is an aircraft carrier under construction by Cochin Shipyard in Kochi, Kerala for the Indian Navy. It is the first aircraft carrier to be built in India. The name Vikrant (Sanskrit vikrānta, literally "stepping beyond") means "courageous".[13] The motto of the ship is Jayema Sam Yudhi Sprdhah, which is taken from Rigveda 1.8.3 and can be translated as "I defeat those who fight against me".
Work on the ship's design began in 1999, and the keel was laid in February 2009. The carrier was floated out of its dry dock on 29 December 2011[14] and was launched on 12 August 2013.[15] As of 2020, the ship is expected to start sea trials in December 2020 and enter into service in end of 2021.[16][17] The project cost has escalated, by 2014, to ₹19,341 crore (equivalent to ₹310 billion or US$3.7 billion in 2023).[18] With an additional ₹3,000 crore (equivalent to ₹37 billion or US$450 million in 2023) authorised for phase III, in 2019.[19]
Background
In 1989, India announced a plan to replace its ageing British-built aircraft carriers, INS Vikrant and INS Viraat (ex-HMS Hermes (R12)), with two new 28,000-ton Air Defence Ships (ADS) that would operate the BAe Sea Harrier aircraft. The first vessel was to replace Vikrant, which was set to decommission in early 1997. Construction of the ADS was to start at the Cochin Shipyard (CSL) in 1993 after the Indian Naval Design Organisation had translated this design study into a production model. Following the 1991 economic crisis, the plans for construction of the vessels were put on hold indefinitely.
In 1999, then-Defence Minister George Fernandes revived the project and sanctioned the construction of the Project 71 ADS.[20] By that time, given the ageing Sea Harrier fleet, the letter of intent called for a carrier that would carry more modern jet fighters. In 2001, CSL released a graphic illustration showing a 32,000-ton STOBAR (Short Take-Off Barrier Arrested Recovery) design with a pronounced ski jump.[21] The aircraft carrier project finally received formal government approval in January 2003. By then, design updates called for a 37,500-ton carrier to operate the MiG-29K. India opted for a three-carrier fleet consisting of one carrier battle group stationed on each seaboard, and a third carrier held in reserve, in order to continuously protect both its flanks, to protect economic interests and mercantile traffic, and to provide humanitarian platforms in times of disasters, since a carrier can provide a self-generating supply of fresh water, medical assistance or engineering expertise to populations in need for assistance.[22]
In August 2006, then-Chief of the Naval Staff, Admiral Arun Prakash stated that the designation for the vessel had been changed from Air Defence Ship (ADS) to Indigenous Aircraft Carrier (IAC). The euphemistic ADS had been adopted in planning stages to ward off concerns about a naval build-up. Final revisions to the design increased the displacement of the carrier from 37,500 tons to over 40,000 tons. The length of the ship also increased from 252 metres (827 ft) to over 260 metres (850 ft).[23]
Design
It is 262 metres (860 ft) long and 60 metres (200 ft) wide, and displaces about 40,000 metric tons (39,000 long tons). It features a STOBAR configuration[24] with a ski-jump. The deck is designed to enable aircraft such as the MiG-29K to operate from the carrier. It is expected to carry an air group of up to thirty aircraft, which will include up to 24–26 fixed-wing combat aircraft,[25] primarily the Mikoyan MiG-29K, besides carrying 10 Kamov Ka-31 or Westland Sea King helicopters. The Ka-31 will fulfill the airborne early warning (AEW) role and the Sea King will provide anti-submarine warfare (ASW) capability.[26][27]
Vikrant is powered by four General Electric LM2500+ gas turbines on two shafts, generating over 80 megawatts (110,000 hp) of power. The gearboxes for the carriers were designed and supplied by Elecon Engineering.[14][28][29]
The ship's combat management system (CMS) was developed by Tata Power Strategic Engineering Division in collaboration with Weapon and Electronics System Engineering Establishment and MARS, Russia. It is the first CMS developed by a private company for the Indian Navy, was handed over to the Navy on 28 March 2019.[30][31]
Carrier air group
India considered a number of aircraft for operation from its INS Vikramaditya and the planned indigenous aircraft carrier. India evaluated the Russian Sukhoi Su-33, but chose the lighter Mikoyan MiG-29K as Vikramaditya was smaller and lacked an aircraft catapult.[32] On 18 January 2010, it was reported that India and Russia were close to signing a deal for 29 MiG-29K fighters to operate from IAC-1.[33] In addition, the navy signed a deal for six naval-variants of the HAL Tejas.[34] In June 2012, Flight Global reported that the Indian Navy was considering the use of Rafale M (Naval variant) on these carriers.[35]
In December 2016, the navy announced that the HAL Tejas was overweight for carrier operations, and other alternatives would be looked at.[36][37]
Construction
Vikrant is the first aircraft carrier to be designed by the Directorate of Naval Design of the Indian Navy and the first warship to be built by Cochin Shipyard. Its construction involved participation of a large number of private and public firms. The keel for Vikrant was laid by Defence Minister A.K. Antony at the Cochin Shipyard on 28 February 2009.[38][39]
The AB/A grade steel which was supposed to be supplied from Russia faced problems in delivery. To resolve this, the Defence Metallurgical Research Laboratory (DMRL) and Steel Authority of India Limited (SAIL) created facilities to manufacture the steel in India.[14][26] Reportedly, 26,000 tonnes of three types of special steel for the hull, flight deck and floor compartments were manufactured at the Bhilai Steel Plant, Chhattisgarh and Rourkela Steel Plant, Odisha. Due to this, this is the first ship of the Indian navy to be built completely using domestically-produced steel.[40] The main switch board, steering gear and water tight hatches have been manufactured by Larsen & Toubro in Mumbai and Talegaon; high-capacity air conditioning and refrigeration systems have been manufactured in Kirloskar Group's plants in Pune; most pumps have been supplied by Best and Crompton; Bharat Heavy Electricals (BHEL) supplied the Integrated Platform Management System (IPMS), which is being installed by Avio, an Italian company; the gear box was supplied by Elecon Engineering; and the electrical cables are being supplied by Nicco Industries.[41] Fincantieri provided consultancy for the propulsion package while Russia's Nevskoye Design Bureau designed the aviation complex[42]
The keel for Vikrant was laid by Defence Minister A.K. Antony at the Cochin Shipyard on 28 February 2009.[43][44] The ship uses modular construction, with 874 blocks joined together for the hull. By the time the keel was laid, 423 blocks weighing over 8,000 tons had been completed.[45] The construction plan called for the carrier to be launched in 2010, when it would displace some 20,000 tonnes, as a larger displacement could not be accommodated in the building bay. It was planned that after about a year's development in the refit dock, the carrier would be launched when all the major components, including underwater systems, would be in place. Outfitting would then be carried out after launch. As per the Cabinet Committee on Security (CCS), sea trials were initially planned to commence in 2013, with the ship to be commissioned in 2014.[46][47]
In March 2011, it was reported that the project had been affected by the delay in the delivery of the main gearboxes for the carrier. The supplier, Elecon, attributed it to having to work around a number of technical complexities due to the length of the propulsion shafts.[48] Other issues resulting in delays included an accident with a diesel generator and an issue with its alignment.[49] In August 2011, the Defence Ministry reported to the Lok Sabha that 75% of the construction work for the hull of the lead carrier had been completed and the carrier would be first launched in December 2011, following which further works would be completed until commissioning.[50][51] On 29 December 2011, the completed hull of the carrier was first floated out of its dry dock at CSL, with its displacement at over 14,000 tonnes.[28] Interior works and fittings on the hull would be carried out until the second half of 2012, when it would again be dry-docked for integration with its propulsion and power generation systems.[5][14]
In July 2012, The Times of India reported that construction of Vikrant has been delayed by three years, and the ship would be ready for commissioning by 2018.[52] Later, in November 2012, Indian English-language news channel NDTV reported that cost of the aircraft carrier had increased and the delivery has been delayed by at least five years and is expected to be with the Indian Navy only after 2018 as against the scheduled date of delivery of 2014.[53] Work then commenced for the next stage of construction, which included the installation of the integrated propulsion system, the superstructure, the upper decks, the cabling, sensors and weapons.[54]
Launch
In July 2013, the Defence Minister A. K. Antony announced that Vikrant would be launched on 12 August at the Cochin Shipyard. The ship was launched by his wife, Elizabeth Antony, on 12 August 2013.[55] Extensive sea trials were expected to begin in mid of 2017 and the ship will be inducted into the navy by late 2018.[52]
According to Admiral Robin Dhowan, about 83% of the fabrication work and 75% of the construction work had been completed at the time of launching. He said that 90% of the body work of the aircraft carrier had been designed and made in India, about 50% of the propulsion system, and about 30% of its weaponry. He also said that the ship would be equipped with a long range missile system with multi-function radar and a close-in weapon system (CIWS).[56] After the launch, Vikrant would be re-docked for the second phase of construction, in which the ship would be fitted with various weapons and sensors, and the propulsion system, flight deck and the aircraft complex would be integrated.[41]
Undocking and fitting-out
Vikrant was undocked on 10 June 2015 after the completion of structural work. Cabling, piping, heat and ventilation works will be completed by 2017; sea trials will begin thereafter.[57] By October 2015, the construction of the hull was close to 98 percent complete, with flight deck construction underway.[58] The installation of machinery, piping and the propeller shafts was in progress by January 2016; it was reported, however, that there were delays in the delivery of equipment from Russia for the carrier's aviation complex.[59] By May 2017, the procurement delays had been resolved and the carrier's fitting-out was 62% complete, with trials of the auxiliary systems scheduled by late 2017.[6]
In February 2020, all the major structural and outfitting work was declared complete by the government.[60] As of September 2020, Vikrant completed harbour trials while the basin trials will start from October 2020 to check propulsion, electric transmission and shafting systems.[2]
Sea trials
On 31 October 2019, Cochin Shipyard received a ₹3,000 crore (equivalent to ₹37 billion or US$450 million in 2023) contract for the Phase-III of the project.[61] This contract includes funds for the harbours trials, sea trials and support for the ship during its weapons and aviation trials after its delivery.[62]
In December 2019, it was reported that the engines on board the ship were switched on.[63]
Completion and Commissioning
The ship's completion and commissioning has been delayed several times. Vikrant was originally intended to be delivered in December 2010[64] and commissioned in 2016. This was later postponed, with sea trials to begin in 2017 and commissioning planned for 2018.[65] In July 2016, the Comptroller & Auditor General (CAG) published a 2014 project plan, supplied by the Cochin Shipyard, that shows an expected completion date in 2023,[64] though the Navy hoped to partially commission the ship before this date.[66]
In December 2017, the Chief of Naval Staff Admiral Sunil Lanba announced that the ship was expected to be commence sea trials and be commissioned in 2020.[65][67] In January 2018, Commodore Chowdhary, the principal director of naval design, announced the remaining procurement delays stalling Vikrant's construction had been resolved, and that the carrier would be completed and delivered by December 2018; it would then undergo two years of sea trials before its expected commissioning in October 2020.[68]
The start of the warship's trials was initially scheduled to begin on 12 March 2020, however construction delays caused that to be moved back to April. With the COVID-19 crisis, the navy says trials are unlikely to begin before September/October. During the Navy Day press meeting in December 2019, Navy Chief Admiral Karambir Singh said the INS Vikrant would be fully operational before the end of 2022. The COVID-19 pandemic has already pushed that back to 2023 and further delays are possible.[69] Indian Navy is expecting to commission Vikrant by the end of 2021.[2]
A part of the blame for the delay in delivery of INS Vikrant was attributed to the delay in the supply of aviation equipment from Russia. In response to a question in the Rajya Sabha (upper house of Indian Parliament), Sripad Naik, the minister of state for defence stated: "Ship's targeted delivery was affected due to delay in supply of aviation equipment from Russia".[70] In March 2020 it was revealed that Indian Navy after commissioning the aircraft carrier will deploy the ship at L&T's shipyard in Kattupalli near Chennai. This was done as the planned naval base in Rambilli near Vishakhapatnam is not ready yet. The navy wants to lease a 260 m berth at Kattupalli shipyard, for 8 years between 2022 and 2030 for interim berthing of the ship, by which time the naval base at Rambilli is expected to come up.[71]
See also
- Future ships of the Indian Navy
- List of active Indian Navy ships
- List of aircraft carriers in service
References
- ^ Ghoshal, Adreesh. "Defence Secretary Ajay Kumar Reviews The Progress of India's Indigenous Aircraft Carrier, Basin Trials To Commence Soon". Delhi Defence Review. Retrieved 24 August 2020.
- ^ a b c "India's first Indigenous Aircraft Carrier 'ready' for Sea trials in December 2020". The New Indian Express. Retrieved 23 August 2020. Cite error: The named reference ":0" was defined multiple times with different content (see the help page).
- ^ "https://www.newindianexpress.com/nation/2020/aug/21/indias-first-indigenous-aircraft-carrier-ready-for-basin-trials-in-september-2186478.html". Navy Recognition.
{{cite web}}
:|access-date=
requires|url=
(help); External link in
(help); Missing or empty|title=
|url=
(help) - ^ "India's first indigenous aircraft carrier INS VIKRANT(IAC1) is out for trials". Defence News India. 17 October 2020. Retrieved 20 October 2020.
- ^ a b "India Floats out Its First Indigenous Aircraft Carrier". DefenceNow.com. 2 January 2012. Archived from the original on 13 February 2015. Retrieved 18 May 2015.
- ^ a b Anandan, S. (13 May 2017). "In the heart of the iron beast". The Hindu. Archived from the original on 28 August 2017. Retrieved 13 May 2017.
- ^ "Annual Report 2019-20" (PDF). Cochin Shipyard Ltd. Retrieved 25 September 2020.
- ^ "List of Aircraft Carriers Under Construction: 2013". World Defense Review. Archived from the original on 19 May 2015. Retrieved 17 May 2015.
- ^ "India's first indigenous aircraft carrier to be inducted in 2018". The Times of India. Archived from the original on 19 December 2016. Retrieved 22 December 2016.
- ^ a b c "Cochin Shipyard undockes INS Vikrant". Business Standard. 11 June 2015. Archived from the original on 28 August 2017. Retrieved 12 March 2016.
- ^ "India's First Indigenous Aircraft Carrier - INS Vikrant". Archived from the original on 12 March 2016.
- ^ Gady, Franz-Stefan. "India's First Homegrown Aircraft Carrier to Enter Sea Trials in Early 2020". The Diplomat. Retrieved 5 April 2019.
- ^ Singh, Harmeet (12 August 2013). "India unveils home-built aircraft carrier, INS Vikrant". CNN. Archived from the original on 17 May 2015. Retrieved 18 May 2015.
- ^ a b c d Anandan, S.; Martin, K. A. (30 December 2011). "Navy floats out first Indigenous Aircraft Carrier". The Hindu. Archived from the original on 4 January 2012. Retrieved 18 May 2015.
- ^ India launches first indigenous aircraft carrier INS Vikrant Archived 20 August 2016 at the Wayback Machine Times of India 12 August 2013
- ^ Peri, Dinakar (8 July 2019). "Indigenous Aircraft Carrier Vikrant to be delivered to Navy by February 2021". The Hindu. ISSN 0971-751X. Retrieved 13 July 2019.
- ^ "Navy's long-term plan is to have three aircraft carriers, says Navy chief Admiral Karambir Singh". Business Line. 3 December 2019. Retrieved 4 December 2019.
- ^ Mazumdar, Mrityunjoy (17 June 2015). "India's indigenous carrier is floated out". IHS Jane's Defence Weekly. 52 (24): 8.
- ^ "Cochin Shipyard signs Rs 3,000 crore contract with Indian Navy for INS Vikrant". Indian Transport and Locistics News. Retrieved 17 January 2020.
- ^ "Indian Aircraft Carrier (Project-71)". Bharat Rakshak. Archived from the original on 17 February 2012.
- ^ John Pike. "Air Defense Ship". Globalsecurity.org. Archived from the original on 28 December 2010. Retrieved 1 February 2011.
- ^ "India's Future Aircraft Carrier Force and the Need for Strategic Flexibility". idsa.in. Archived from the original on 6 April 2013. Retrieved 17 March 2019.
- ^ "Antony lays keel of first Indigenous Aircraft Carrier". Pib.nic.in. Archived from the original on 14 January 2011. Retrieved 1 February 2011.
- ^ Shrivastava, Sanskar (25 August 2013). "Comparison of Chinese Aircraft Carrier Liaoning and Indian INS Vikrant". The World Reporter. Archived from the original on 28 August 2013. Retrieved 18 May 2015.
- ^ a b Anandan, S. (29 September 2008). "Keel-laying of indigenous aircraft carrier in December". The Hindu. Retrieved 18 May 2015.
- ^ Simha, Rakesh Krishnan (5 December 2012). "Vikramaditya and Liaoning – forces of the future". IndRus. Retrieved 18 May 2015.
- ^ a b Vora, Rutan (26 December 2011). "Elecon to supply gears for India's first aircraft carrier". Business Standard. Retrieved 18 May 2015.
- ^ "India starts work on second indigenous aircraft carrier". The Economic Times. 16 July 2012. Retrieved 18 May 2015.
- ^ Gurung, Shaurya Karanbir (29 March 2019). "Indian Navy gets combat management system for INS Vikrant". The Economic Times. Retrieved 3 July 2019.
- ^ "Indian Navy gets most critical, made in India, CM system for its indigenous Aircraft Carrier". The Financial Express. 29 March 2019. Retrieved 3 July 2019.
- ^ "MiG-29 Shuts Down The Su-33". 13 October 2009. Archived from the original on 5 November 2012. Retrieved 31 December 2011.
- ^ Pandit, Rajat (18 January 2010). "India, Russia to ink $1.2 bn deal for 29 more MiG-29Ks". The Times of India. Archived from the original on 2 February 2014.
- ^ Sandeep Unnithan (2 December 2009). "First indigenous aircraft carrier to be launched next year: Navy chief: LATEST HEADLINES: India Today". Indiatoday.intoday.in. Archived from the original on 26 January 2010. Retrieved 1 February 2011.
- ^ "IAC enters trial as navy eyes Rafale". Flight magazine. Archived from the original on 23 June 2012. Retrieved 1 August 2012.
- ^ "Navy rejects Tejas, says 'overweight' fighter does not meet its requirements". The Times of India. Archived from the original on 6 December 2016. Retrieved 22 December 2016.
- ^ "Navy rules out deploying 'overweight' Tejas on aircraft carriers". indianexpress.com. 2 December 2016. Archived from the original on 20 December 2016. Retrieved 22 December 2016.
- ^ "Govt overhauls coastal security; gives overall charge to Navy". dnaindia. Archived from the original on 10 April 2016. Retrieved 7 April 2016.
- ^ "India to lay keel of new aircraft carrier on Saturday | World | RIA Novosti". sputniknews. 26 February 2009. Archived from the original on 5 June 2011. Retrieved 18 May 2015.
- ^ Shukla, Ajai (7 August 2013). "INS Vikrant's first victory: being built from Indian steel". Business Standard. Archived from the original on 11 August 2013. Retrieved 18 May 2015.
- ^ a b "'Vikrant' Reborn in Indigenous Avtar". Indian Defence Review. 12 August 2013. Archived from the original on 26 February 2014. Retrieved 18 May 2015.
- ^ "In the heart of the iron beast, INS Vikrant". The Hindu. 13 May 2017. Retrieved 30 September 2017.
- ^ "India overhauls coastal security, Navy gets charge". NDTV.com. 28 February 2009. Archived from the original on 8 September 2012. Retrieved 1 February 2011.
- ^ "India to lay keel of new aircraft carrier on Saturday | World | RIA Novosti". En.rian.ru. 26 February 2009. Archived from the original on 5 June 2011. Retrieved 1 February 2011.
- ^ Ray, Kaylan (1 March 2009). "India joins elite warships club". Deccan Herald. Archived from the original on 15 July 2012. Retrieved 18 May 2015.
- ^ Unnithan, Sandeep (18 February 2009). "Keel laying of indigenous aircraft carrier next week". Indiatoday. Archived from the original on 27 July 2009. Retrieved 18 May 2015.
- ^ Sharma, Suman (7 October 2010). "Indigenous Aircraft Carrier's nucleus ready". Dnaindia.com. Archived from the original on 10 February 2011. Retrieved 18 May 2015.
- ^ Anandan, S. (12 March 2011). "Indigenous aircraft carrier a year behind schedule". The Hindu. Archived from the original on 14 December 2013. Retrieved 18 May 2015.
- ^ Prasad, K.V. (3 December 2011). "INS Arihant on track". The Hindu. Archived from the original on 14 December 2013. Retrieved 18 May 2015.
- ^ "Indigenous aircraft carrier launch this Dec". Zeenews. 2 August 2011. Archived from the original on 9 June 2015. Retrieved 18 May 2015.
- ^ "First indigenous aircraft carrier to be completed by Dec: Govt". Ibnlive.in.com. 2 August 2011. Archived from the original on 7 November 2012.
- ^ a b "India's first indigenous aircraft carrier to be inducted in 2018 - Times of India". The Times of India. Archived from the original on 17 December 2016. Retrieved 17 December 2016.
- ^ Sen, Sudhi Ranjan (20 November 2012). "Indian aircraft carrier: More costly, already delayed". Ndtv.com. Archived from the original on 9 July 2014. Retrieved 18 May 2015.
- ^ Pandit, Rajat (16 August 2014). "PM Modi inducts India's largest indigenously built warship INS Kolkata". The Times of India. Archived from the original on 2 October 2015. Retrieved 18 May 2015.
- ^ "India launches home-built, 37,500-tonne aircraft carrier in a shot across the bow to China". National Post. Associated Press. 12 August 2013. Archived from the original on 14 August 2013. Retrieved 18 May 2015.
The 37,500 tonne INS Vikrant is expected to go for extensive trials in 2016 before being inducted into the navy by 2017, reports say. With this, India joins the select group of countries comprising the United States, the United Kingdom, Russia and France capable of building such a vessel.
- ^ Sen, Sudhi Ranjan (11 August 2013). "INS Vikrant, first Indian-made aircraft carrier, enters water next week". NDTV. Archived from the original on 14 December 2013. Retrieved 18 May 2015.
- ^ Anandan, S. (10 June 2015). "Cochin Shipyard undocks INS Vikrant". The Hindu. Archived from the original on 17 July 2015. Retrieved 12 June 2015.
- ^ Gupta, Jayanta (15 October 2015). "Aircraft carrier INS Vikrant will be delivered to Navy on time: Cochin Shipyard chief". The Times of India. Archived from the original on 18 October 2015. Retrieved 18 October 2015.
- ^ "Navy chief reviews Vikrant project". The Hindu. 17 January 2016. Archived from the original on 17 January 2016. Retrieved 30 March 2016.
- ^ Gurung, Shaurya Karanbir (10 February 2020). "Structural and outfitting work of India's first indigenous aircraft carrier complete". The Economic Times. Retrieved 12 February 2020.
- ^ "Cochin Shipyard hits 52-week high after bagging Rs 3,000-crore contract". Moneycontrol. 1 November 2019. Retrieved 1 November 2019.
{{cite web}}
: CS1 maint: url-status (link) - ^ Narasimhan, T. E. (1 November 2019). "Cochin Shipyard bags Rs 3,000 crore contract for aircraft carrier Vikrant". Business Standard India. Retrieved 1 November 2019.
- ^ Pubby, Manu (2 December 2019). "Engines fired up, basin trials next for Indigenous Aircraft Carrier". The Economic Times. Retrieved 2 December 2019.
- ^ a b "CHAPTER II: PERFORMANCE AUDIT ON CONSTRUCTION OF INDIGENOUS AIRCRAFT CARRIER - page 39" (PDF). Comptroller and Auditor General (CAG) of India. Government of India. Retrieved 17 January 2020.
- ^ a b "India's First Homegrown Aircraft Carrier to Begin Sea Trials in 2020". The Diplomat. Retrieved 6 December 2018.
- ^ Pandit, Rajat. "India without aircraft carrier for 8 months". The Times of India. Archived from the original on 4 December 2016. Retrieved 17 November 2016.
- ^ Gurung, Shaurya Karanbir (1 December 2017). "14 Chinese navy ships spotted in Indian Ocean, Indian Navy monitoring locations". The Economic Times. Retrieved 2 December 2017.
- ^ Peri, Dinakar (19 January 2018). "Navy confident of commissioning aircraft carrier Vikrant in two years". The Hindu. Retrieved 4 February 2018.
- ^ "Delivery date of Indian Navy Aircraft Carrier INS Vikrant once again delayed". Navy Recognition. 25 May 2020. Retrieved 24 August 2020.
{{cite web}}
: CS1 maint: url-status (link) - ^ "Delay in supply of equipment from Russia affected delivery of India's aircraft carrier". Defence Star. 14 February 2020.
- ^ "Indian Navy to berth new aircraft carrier at private shipyard".
External links
- Delay in equipment from Russia affected the delivery schedule of INS Vikrant
- Images during the launch of Vikrant
- Making of Indigenous Aircraft Carrier, Transition to Guardianship: The Indian Navy 1991-2000, Vice Adm (Retd) G M Hiranandani
- Indigenous Aircraft Carrier on Bharat Rakshak
- History of Air Defense Ship on Global Security
- Global Security