Jump to content

Link light rail: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
→‎Future extensions: Added information about proposed light rail line in western Seattle
Oranviri (talk | contribs)
Line 166: Line 166:
==Future extensions==
==Future extensions==
{{Link Light Rail}}
{{Link Light Rail}}
Sound Transit's Phase 2 plan, under the name of ST2 (Sound Transit 2), is the plan for the second phase of Link Light Rail expansion. ST2 was put before voters in November 2007 as part of the "Roads and Transit" measure, which included hundreds of miles of subway expansion along with the light rail, but failed to pass. Sound Transit then put another ST2 plan on the ballot in November 2008. The measure passed by large margins. The plan will extend light rail to Lynnwood Transit Center in the north, S. 272nd St. in [[Federal Way, Washington|Federal Way]] to the south, and Downtown Bellevue and Overlake Transit Center to the east.<ref>{{cite news|url=http://seattletimes.nwsource.com/html/localnews/2008355167_websoundtransit05m.html|title=Sound Transit calls Prop. 1 a gift "to our grandchildren"|publisher=Seattle Times|author=Mike Lindblom|date=2008-11-05|accessdate=2009-01-14}}</ref>
Sound Transit's Phase 2 plan, under the name of ST2 (Sound Transit 2), is the plan for the second phase of Link Light Rail expansion. ST2 was put before voters in November 2007 as part of the "Roads and Transit" measure, which included hundreds of miles of highway expansion along with the light rail, but failed to pass. Sound Transit then put another ST2 plan on the ballot in November 2008. The measure passed by large margins. The plan will extend light rail to Lynnwood Transit Center in the north, S. 272nd St. in [[Federal Way, Washington|Federal Way]] to the south, and Downtown Bellevue and Overlake Transit Center to the east.<ref>{{cite news|url=http://seattletimes.nwsource.com/html/localnews/2008355167_websoundtransit05m.html|title=Sound Transit calls Prop. 1 a gift "to our grandchildren"|publisher=Seattle Times|author=Mike Lindblom|date=2008-11-05|accessdate=2009-01-14}}</ref>


===North Link===
===North Link===

Revision as of 16:06, 5 March 2010

Link Light Rail
File:Sound-Transit-logo.png
Overview
LocaleSeattle metropolitan area
Transit typeLight rail
Number of lines2 existing
1 under construction
3 approved[1]
Number of stations17 existing
3 under construction
18 appproved
Daily ridership3,900[2] (Tacoma Link)
16,200[3] (Central Link)
Operation
Began operationTacoma Link:
August 22, 2003
Central Link:
July 18, 2009
Operator(s)Sound Transit
Technical
System length17.3 miles (27.8 km)
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationTacoma Link:
750 V DC, overhead catenary
Central Link:
1500 V DC, overhead catenary
System map

Sound Transit Link Light Rail is a rapid transit project in the Greater Seattle region, originally approved by a ballot measure in November 1996. Two lines are currently operating as of 2009: Tacoma Link, which uses 3 vehicles built by Skoda, and Central Link, which uses 35 vehicles built by Kinki Sharyo.[4] The University Link extension, extending Central Link northward from downtown Seattle to the University of Washington, began preliminary construction work in late 2008 with service slated to start in 2016. In addition, voters approved a November 2008 ballot measure to extend Link light rail north via Northgate to Lynnwood (with planning and property acquisition to support later extension to Everett), south to Redondo Heights Park & Ride in Federal Way (with route planning to support later extension to Tacoma and extensions of Tacoma Link to the east and west), and east via Mercer Island and Bellevue to Microsoft's main campus in Redmond (with route planning and right-of-way acquisition to support later extension to downtown Redmond).

History

In November 1996, voters in King, Pierce, and Snohomish Counties approved increases in sales taxes and vehicle excise taxes to pay for a US$3.9 billion transit package that included $1.7 billion for a light rail system, including Central Link and Tacoma Link.[5] Over the next several years, debates raged over various issues surrounding the Central Link line.

In the late nineties and early 2000s, Sound Transit underwent a series of financial and political difficulties. The cost of the line rose significantly,[6] and the federal government threatened to withhold necessary grants.[7] In 2001, Sound Transit was forced to shorten the line from the original proposal, and growing enthusiasm for the proposed monorail brought rising opposition to the light rail from Seattle-area residents.

But by the end of 2002, Sound Transit decided on a route and became more financially sound. On August 22, 2003, the Tacoma Link light rail line in Downtown Tacoma opened and quickly reached its forecast ridership,[8] and a couple months later, on November 8, 2003, a groundbreaking ceremony was held for the Central Link light rail line. Central Link opened between Westlake and Tukwila on July 18, 2009 and was extended to SeaTac/Airport on December 19, 2009.[9][10]

Service

Headways

Tacoma Link trains currently run on the following schedule:[11]

Time Headway
Monday
through
Friday
5:20 am – 6:50 am 20
6:50 am – 8:00 pm 10
8:00 pm – 10:10 pm 20
Saturday 8:00 am – 10:10 pm 10
Sunday 10:00 am – 6:00 pm 20

King County Metro, which operates Central Link, runs Central Link trains on the following schedule:

Time Headway
Monday
through
Friday
5:00 am – 6:00 am 15
6:00 am – 8:30 am 7.5
8:30 am – 3:00 pm 10
3:00 pm – 6:30 pm 7.5
6:30 pm – 10:00 pm 10
10:00 pm – 1:00 am 15
Saturday 5:00 am – 8:00 am 15
8:00 am – 10:00 pm 10
10:00 pm – 1:00 am 15
Sunday 6:00 am – 8:00 am 15
8:00 am – 10:00 pm 10
10:00 pm - 12:00 midnight 15

Connecting transit

A King County Metro Electric Trolley Bus (ETB) in Downtown Seattle

Tacoma Link is located entirely within Pierce County, and most of the connecting transit is provided by Pierce Transit. Sound Transit also runs express buses that provide connections from Tacoma Link to places around the region, and Intercity Transit runs an Olympia express bus from the Tacoma Dome Station.

Central Link is located entirely within King County, and therefore most of the connecting transit consists of buses provided by King County Metro. Metro buses and Link Light Rail share the Downtown Seattle Transit Tunnel, making bus-train transfers easy. At Westlake Station, one may transfer to the South Lake Union Streetcar or to the Seattle Monorail. Commuter buses to Snohomish County are provided by Community Transit, and Sound Transit runs several express buses from Downtown Seattle and the Seattle-Tacoma International Airport to points in King, Snohomish and Pierce Counties, as well as the Sounder commuter rail service to all three counties. Three Amtrak intercity rail routes run from Seattle's King Street Station to points around the country, and the intercity bus depot is located several blocks north of Westlake Station. Finally, ferry services are provided from Colman Dock on the waterfront in Downtown Seattle by Washington State Ferries, and by the King County Ferry District.

Fares

Central Link fares are distance-based, with a flat rate starting at $1.75 plus 5 cents per mile, rounded to the nearest quarter. Riding in the Downtown Transit Tunnel is not free, unlike on the buses.[12] This results in a maximum cost of $2.50 for a one-way trip from Downtown Seattle to Sea-Tac Airport, compared to fares (as of January 2010) of $2.00 (off-peak) to $2.75 (peak) for the same route on the 194 Metro bus.[13] Maintaining the ride-free area downtown for light rail would have resulted in fares 25 cents higher.

The ORCA card enables contact-less fare payment and automatically calculates transfer credit between Link Light Rail and Sound Transit, King County Metro, Community Transit, Pierce Transit, Everett Transit, Washington State Ferries, and Kitsap Transit.[14]

Tacoma Link is fare-free throughout its entire route in Downtown Tacoma.[15]

Rolling stock

The rolling stock fleet consists of two types of vehicle, for a total of 38 vehicles. Tacoma Link has three, while Central Link has 35.

The Tacoma Link cars were manufactured in the Czech Republic by Škoda in 2001-2, under a partnership with Inekon, another Czech company. The three cars are model 10T, the same type used by the Portland Streetcar (the latter's cars 001-007). They were delivered to Sound Transit in September 2002, prior to the 2003 opening of Tacoma Link. They only operate as single cars (not coupled in trains), and are 66 feet long, 8 feet wide, and have two articulations in the middle. They have a total capacity for 157 people, with 30 seated and 127 standing.[16] The cars draw their power from 750-volt overhead wires.[17]

Central Link cars are manufactured by Kinki Sharyo in Japan and the United States. The first vehicle arrived in November 2006, and two more per month began arriving in May 2007. The cars are 95 feet long and 105,000 pounds, with the ability to be coupled into four-car trains. They use 1500-volt electrical power drawn from a single overhead catenary wire, and have a capacity for 200 passengers, including 74 seated.[18]

Current lines

Tacoma Link at the Tacoma Dome Station

Tacoma Link

Tacoma Link is a free light rail line running through the densest parts of Tacoma. This light rail system connects the Tacoma Dome Station (a regional hub for local and express bus, and commuter train service) with downtown Tacoma. It has stops at the Tacoma Dome Station, S. 25th Street, Union Station, the convention center, and the Theater District. The Union Station stop is next to the University of Washington's Tacoma campus and several museums. As of March 2008, Tacoma Link has a daily ridership of 3,900[2], surpassing the prediction that by 2010 it would have ridership of 2,000 per day.[19]

Light Rail Testing

Central Link

Service has begun on Sound Transit's 13.9 miles (22.4 km) Central Link light rail line. The trains began carrying passengers on July 18, 2009, stopping at 12 stations and running 4.4 miles (7.1 km) on elevated tracks, 2.5 miles (4.0 km) in tunnels and 7 miles (11 km) at grade. To support the line, Sound Transit retrofit the Downtown Seattle Transit Tunnel and four of its existing stations for joint use by both light rail trains and buses. Sound Transit also built new light rail stations in the following locations (listed here from north to south): Near Qwest Field and Safeco Field, in the Sodo district at Lander Street just south of downtown Seattle; on Beacon Hill at Beacon and Lander, in the Mount Baker neighborhood at McClellan and Rainier; in the Columbia City neighborhood at Edmunds and Martin Luther King Jr. Way (MLK); near Othello Street and MLK; in the Rainier Beach neighborhood at Henderson and MLK; and in Tukwila on Tukwila International Blvd. Sound Transit extended the line another 1.7 miles (2.7 km) to the Seattle-Tacoma International Airport, adding a thirteenth station on December 19, 2009[10]. The Beacon Hill tunnel is one of the main components of Central Link. Its west portal, or opening, is under I-5, east of Airport Way. The underground Beacon Hill Station is located at the southeast corner of Beacon Avenue South and South Lander Street, approximately 150 feet below grade. The east portal, or opening, is east of 25th Avenue South and south of South McClellan Street, where the light rail line emerges to an elevated trackway as it approaches the Mount Baker Station near the intersection of Rainier Avenue South and South Stevens Street.[20]

University Link

In November 2006, the US Federal Transit Administration approved Sound Transit's plan for extending the light rail 3.1 miles (5.0 km) north to the University of Washington after completion of an Environmental Impact Study. A grant was approved in November 2008, which allowed University Link to begin construction in December 2008. Actual construction will last until approximately 2016.[21]

Future extensions

Lynnwood City Center (2024)
Parking
Mountlake Terrace (2024)
Parking
Shoreline North/185th (2024)
Parking
Shoreline South/148th (2024)
Parking
Northgate
Parking
Roosevelt
U District
University of Washington
Capitol Hill
First Hill Streetcar
Westlake
Seattle Center Monorail South Lake Union Streetcar
University Street
Pioneer Square
Colman Dock
International District/Chinatown
Amtrak Cascades Sounder commuter rail First Hill Streetcar
Judkins Park (2025)
Mercer Island (2025)
South Bellevue
Parking
East Main
Bellevue Downtown
Wilburton
Operations and Maintenance
Facility East
Spring District
BelRed
Overlake Village
Redmond Technology
Parking
Marymoor Village (2025)
Downtown Redmond (2025)
Stadium
Greyhound Lines
SODO
SODO Operations and
Maintenance Facility
Beacon Hill
Mount Baker
Columbia City
Othello
Rainier Beach
Tukwila International Boulevard
Parking
SeaTac/Airport enlarge…
Seattle–Tacoma International Airport
Angle Lake
Parking
Kent Des Moines (2026)
Parking
Star Lake (2026)
Parking
Federal Way Downtown (2026)
Parking
Stadium District
S 4th
Tacoma General
Old City Hall
6th Ave
Theater District Pierce Transit
Hilltop District
Convention Center
St Joseph
Union Station
S 25th
Tacoma Dome Amtrak

Handicapped/disabled access All stations are accessible

Sound Transit's Phase 2 plan, under the name of ST2 (Sound Transit 2), is the plan for the second phase of Link Light Rail expansion. ST2 was put before voters in November 2007 as part of the "Roads and Transit" measure, which included hundreds of miles of highway expansion along with the light rail, but failed to pass. Sound Transit then put another ST2 plan on the ballot in November 2008. The measure passed by large margins. The plan will extend light rail to Lynnwood Transit Center in the north, S. 272nd St. in Federal Way to the south, and Downtown Bellevue and Overlake Transit Center to the east.[22]

North Link

North Link is a future extension of Central Link partially approved by voters in November 2008. It will connect the University Link project currently under way to a central University District station, Roosevelt, Northgate, and points north. Once North Link is complete, the major urban centers of downtown Seattle, Capitol Hill, the University District, and Northgate will be connected via light rail. It is a top priority for Sound Transit as it will add over 40,000 daily riders to Link Light Rail by 2030, easing pressure on the Interstate 5 corridor.[23]

Proposition 1, the measure on the ballot in 2008, included extensions of Central Link north to Lynnwood Transit Center, via the stations described above and Jackson Park, Shoreline, and Mountlake Terrace. The ballot measure also includes funding for a study to develop possible routes for a future extension of Central Link to Everett. As the extension to Lynnwood Transit Center, will be finished in 2023, it can be assumed that an extension to Everett would not be completed until well after that year. An extension to Everett would require a separate, future measure.

South Link

Sound Transit plans to connect the south end of Central Link, SeaTac Airport, to the Tacoma Dome Transit Center. The proposed route will have stations at South 200th Street, Highline Community College, Redondo/Star Lake Park-and-Ride, Federal Way Transit Center, South Federal Way Park-and-Ride, and Fife. The length of this connection will be aerial, mostly following Highway 99. There are many stakeholders, including the Washington State Department of Transportation, so many agreements must be made before it is built. The line, which has a projected daily ridership of 38,000, would fulfill one of the main goals of Sound Transit: to connect Seattle and Tacoma via light rail. It will not be possible to extend Central Link on Tacoma Link's tracks unless Tacoma Link is retrofitted with Central Link technology. Tacoma Link currently runs on 750 volt power, while Central Link runs on 1500 volt power. It uses different types of cars and has much shorter station platforms as well.[24]

The November 2008 Proposition 1 included a portion of South Link, extending Central Link as far south as Redondo/Star Lake Park-and-Ride, and passed by a vote of about 57% to 43%. The extension to South 200th Street and Highline Community College is scheduled to open in 2020, with the Redondo/Star Lake extension following it in 2023.[25] The whole extension all the way to the Tacoma Dome was on the ballot as part of the previous 2007 Roads and Transit package, but that measure failed 56% to 44%.

East Link

In November 2008, voters approved the construction of an East Link light rail line connecting the city of Seattle to Mercer Island and the Eastside communities of Bellevue and Redmond as part of the Proposition 1 measure. This line will split from Central Link just south of the International District Station in downtown Seattle, extend across the I-90 bridge express lanes through downtown Bellevue and serve the Overlake Transit Center, including Microsoft headquarters.

It will provide stations on I-90 at Rainier Avenue and Mercer Island; in Bellevue at South Bellevue Park-and-Ride, East Main, Bellevue Transit Center, Overlake Hospital, and on the Bel-Red corridor at 124th and 130th; and along SR 520 at Overlake Village and Overlake Transit Center, adjacent to Microsoft. South Bellevue, East Main, and Overlake Hosptial stations will be elevated and the Bel-Red corridor, Overlake Village, and Overlake Transit Center station at-grade. The Bellevue Transit Center in the middle of Downtown Bellevue will be either at-grade or underground. Bellevue wants a tunnel through its downtown, but money was not included for this in Proposition 1, so Bellevue will have to come up with its own funds to build the tunnel. If it does not come up with the money, that segment of the route will be along the streets.[26]

East Link also includes right-of-way preservation work for later service extension from Overlake Transit Center to downtown Redmond, with stations in SE Redmond adjacent to Marymoor Park and in Downtown Redmond adjacent to Redmond Town Center.

Tacoma Link extensions

Sound Transit is considering several extensions of Tacoma Link Light Rail. One of these proposed extensions would extend the line west to Tacoma Community College. The proposed route would be at grade, and would serve key destinations including Stadium High School, Mary Bridge Children's Hospital, Tacoma General Hospital, and the University of Puget Sound. It is projected to boost the daily ridership of Tacoma Link by 8,000 people.[27] The ballot measure in 2008 included matching funds for this and possibly other Tacoma Link extensions.[28]

Other proposed extensions

Seattle mayor Michael McGinn has proposed building a new light rail line on the western side of Seattle, and has promised to hold a public vote on the matter in 2011. This new light rail line would be built as a joint project between Sound Transit and the city of Seattle, and could service districts including but not limited to Ballard, West Seattle, Fremont, and Belltown.[29] This would fill a key gap in the Link's currently-planned service area.

Land-use impacts

An expressed purpose in building the Link Light Rail system has been to support a "smart growth" approach to handling the region's population growth and development.[30][31] By concentrating new development along light rail lines (a practice known as "transit-oriented development"), more people can live more densely without the increases in automotive commuting traffic that might otherwise be expected. In addition, the concentration of residents near stations helps maintain ridership and revenue.[32] Climate change activists also point out that compact development around light rail lines has been shown to result in dramatic reductions in residents' CO2 emissions, compared to more conventional suburban automotive commutes.[33]

Environmentalists, transportation groups and some affordable housing advocates have sought greater government regulatory support for transit-oriented development along Link Light Rail, and in 2009 a bill was introduced in the Washington State Legislature that would have raised allowable densities (as well as lowering parking requirements and easing some other regulations on development) in station areas.[32] The bill did not pass, but supporters vow to bring it back in 2010.[34]

See also

References

  1. ^ http://www.soundtransit.org/Projects-and-Plans.xml
  2. ^ a b American Public Transportation Association, Light Rail Transit Ridership Report, First Quarter 2008.
  3. ^ http://seattletimes.nwsource.com/html/localnews/2010272103_airportlink14m.html
  4. ^ "Link Light Rail Projects". Sound Transit. Retrieved 2007-06-04.
  5. ^ David Schaefer (1996-11-08). "Voters Back Transit Plan On Fourth Try". The Seattle Times. Retrieved 2007-02-26.
  6. ^ "Light-rail cost soars $1 billion". The Seattle Times. 2000-12-13. Retrieved 2007-02-28.
  7. ^ Andrew Garber (2001-03-30). "Federal aid in jeopardy for light rail". The Seattle Times. Retrieved 2007-04-21.
  8. ^ Sound Transit:Tacoma Link, retrieved 2009-01-06
  9. ^ "Countdown to a new era: all aboard Link light rail starting July 18" (Press release). Sound Transit. April 20, 2009. Retrieved 2009-04-20.
  10. ^ a b "Sound Transit: Countdown to airport connection: Link light rail to Sea-Tac Airport starts Dec. 19". Sound Transit. 2009-11-13. Retrieved 2009-11-14.
  11. ^ "Tacoma Link Schedule". Sound Transit. Retrieved 2008-01-13.
  12. ^ "Riding Link Light Rail: What it costs to ride". Sound Transit. Retrieved 2008-03-27.
  13. ^ "Sound Transit proposes fares for Link light rail, seeks public input". Sound Transit. Retrieved 2008-01-14.
  14. ^ "ORCA Smart Card". Community Transit. Retrieved 2009-01-17.
  15. ^ "Tacoma Link Light Rail Fares". Sound Transit. Retrieved 2009-01-13.
  16. ^ "Streetcar model Škoda 10T". Škoda. Retrieved 2009-04-21.
  17. ^ "Tacoma Link Light Rail Train Specifications". Sound Transit. Retrieved 2008-01-14.
  18. ^ "Link Light Rail Train Specifications". Sound Transit. Retrieved 2008-01-14.
  19. ^ "Tacoma Link: The Little Tram That Could". Light Rail Now!. 2004. Retrieved 2007-07-14. {{cite web}}: Unknown parameter |month= ignored (help)
  20. ^ "Link Light Rail Fact Sheet, June 2006" (PDF). Sound Transit. Retrieved 2007-07-14.
  21. ^ Meghan Erkkinen (2006-11-28). "Feds give light rail green light". The Daily. Retrieved 2007-07-14.
  22. ^ Mike Lindblom (2008-11-05). "Sound Transit calls Prop. 1 a gift "to our grandchildren"". Seattle Times. Retrieved 2009-01-14.
  23. ^ "North Link Light Rail". Sound Transit. Retrieved 2009-01-14.
  24. ^ "Conversion of Tacoma Link to Central Link Technology" (PDF). Sound Transit. Retrieved 2009-01-14.
  25. ^ "Expanding Link light rail". Sound Transit. Retrieved 2009-08-07.
  26. ^ "East Link Project". Sound Transit. Retrieved 2009-08-07.
  27. ^ "Potential Tacoma Link Extensions - West" (PDF). Sound Transit. Retrieved 2008-01-13.
  28. ^ "Sound Transit 2: A Mass Transit Guide - Plan Details". Sound Transit. Retrieved 2008-01-13.
  29. ^ "McGinn wants light-rail line on Seattle's west side". Retrieved 2010-02-22.
  30. ^ http://www.metrokc.gov/kcdot/solutions/projects/link.cfm
  31. ^ http://www.psrc.org/publications/pubs/view/0701.htm
  32. ^ a b http://www.transitorienteddevelopment.org/
  33. ^ http://www.vtpi.org/tdm/tdm45.htm
  34. ^ http://www.futurewise.org/priorities/transportation/document_view

External links