Jump to content

Line 6 (Suzhou Rail Transit)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Lekvwa (talk | contribs) at 15:12, 4 July 2024. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 6
A train of Suzhou Rail Transit Line 6
Overview
StatusUnder construction
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations31
Service
TypeRapid transit
SystemSuzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
History
Opened29 June 2024; 49 days ago (2024-06-29)
Technical
Line length36.12 kilometres (22.44 mi)
Track length79.2m
Number of tracks2
CharacterUnderground[1]
Track gauge1,435 mm (4 ft 8+12 in)
Electrificationoverhead wire

Line 6 of Suzhou Rail Transit is a line under construction. Running north-west to south-east, it will connect Suzhou New District, Suzhou's city center of Gusu District and Suzhou Industrial Park. The line 6, except Huayun station, started operation in 29 June 2024.[2]

Stations

Station name[3] Connections Distance
km
Location
English Chinese
Suzhou Xinqu Railway Station 苏州新区火车站  3 
Suzhou Xinqu railway station ITH
Suzhou Tram Tram line 2
0.00 0.00 New District
Baofeng 保丰
Fuqiang 富强 Gusu
Changjing 长泾
Baiyangwangongyuan 白洋湾公园  8 
Jinjidun 金鸡墩
Huqiu 虎丘
Qingshanqiaobang 清山桥浜
Jiangxingqiao South 江星桥南
Sujin 苏锦  4 
Pinghe Lu 平河路  2 
Meixiang 梅巷
Humble Administrator's Garden Suzhou Museum 拙政园苏博
Xuanqiaoxiang 悬桥巷
Lindun Lu 临顿路  1 
Wangxingqiao Soochow University 望星桥苏大
Xujiabang 徐家浜 SIP
Reyunqiao 惹云桥  7 
Qiutangbang 秋塘浜
Ligongdi West 李公堤西  3 
Qiongjidun 琼姬墩  8 
Nanshigongyuan South 南施公园南
Suzhou Olympic Sports Centre 苏州奥体中心  5 
Children's Hospital 儿童医院总院
Hanqingqiao 涵青桥
Jinjiayan 金家堰
Beixiebu 北斜步
Nanxiebu 南斜步
Jinshang Lu 金尚路  2 
Sangtiandao 桑田岛  2 
Huayun 华云

Rolling stock

Fleet numbers Year Built Time in service Builder Class Number in service No
of
car
Assembly Rolling stock Number Depots Line assigned Notes
240 (40 sets) 2022-2024 2024-present CRRC Nanjing Puzhen B 174 (29 sets) 6 Tc+Mp+M - M + Mp+Tc PM186 060101-064006 (0601-0640) Xushuguan Depot  6 

References

  1. ^ "国家发展改革委关于苏州市城市轨道交通第三期 建设规划(2018~2023年)的批复". Retrieved 28 September 2018.
  2. ^ "苏州轨道交通6号线、S1线开工,2024年将建成9条线". news.sina.com.cn. Archived from the original on 2019-06-09. Retrieved 2018-11-27.
  3. ^ "官宣!苏州轨道交通6、7、8号线车站站名定了". 2024-01-24.