Manchester Arndale
Location | Manchester, England |
---|---|
Coordinates | 53°29′00″N 2°14′29″W / 53.48333°N 2.24139°W |
Opening date | 1975 |
Developer | Arndale Property Trust |
Owner | Prudential Capital Shopping Centres |
No. of stores and services | 210 |
No. of anchor tenants | 7 |
Total retail floor area | 1,400,000 sq ft (130,060 m²) |
No. of floors | 3 (21 in Office Tower) |
Parking | 1450 spaces, NCP (Manchester) Limited.[1] |
Website | www.manchesterarndale.com |
Manchester Arndale (known locally as The Arndale Centre or just The Arndale) is a large shopping centre in Manchester, England. The centre was built during the 1970s when many other cities were also constructing large malls. Manchester Arndale is the largest of a chain of Arndale Centres built across the UK in the 1960s and 1970s. It was originally constructed in phases between 1972 and 1979, at a cost of £100 m. [2]
The centre was redeveloped after the Provisional Irish Republican Army bomb in 1996. The shopping centre is the eighth largest in the United Kingdom.
History
The Arndale Property Trust was formed in the early 1950s, taking its name from its two founders, Arnold Hagenbach and Sam Chippindale. Hagenbach was a Yorkshireman of Swiss extraction at the head of a chain of baker’s shops who had been investing successfully in retail premises since before 1939. Chippindale was an estate agent and former civil servant from Otley. Arndale was unusual (but not unique) in being based outside London and specialising in shops. Of the pair, Hagenbach invested more and was the quieter, while Chippindale formed a reputation for being blunt and outspoken, and capable of convincing sceptical northern councils where London-based developers could not. Arndale began buying property north of Market Street in 1952.[3]
The need for redevelopment had been recognized before the end of the Second World War, and a plan that formed the basis for much of what followed was drawn up in 1942–5. The council’s position was set out by the city surveyor in 1962. "Manchester [is] crystallized in its Victorian setting … A new look for the city has been long overdue. ... Its unsightly areas of mixed industrial, commercial and residential development need to be systematically unravelled and redeveloped on comprehensive lines. Only in this way can a City assume its proper place as a regional centre." The corporation had already used the power of compulsory purchase to speed redevelopment at the bomb-damaged Market Place (between the Corn Exchange and the Royal Exchange—the development has since been demolished), at the CIS buildings, and at Piccadilly. In the view of the surveyor, "These schemes have greatly improved the appearance of the central area of the City ...". The corporation’s preferred form of building was a tower above a two or three storey podium, the form used in all three developments, and later that of the Arndale.[4] Corporation planners added land and buildings owned by the council to those already owned by Arndale to increase the size of the available plot.[5]
A 1965 version of the scheme, costed at £15M, was bounded by Market Street, Corporation Street, Withy Grove and High Street. It was intended to be the UK’s biggest single shopping centre from its inception.[6] The only change to the boundaries (as of 2008) was in 1973 (ie before opening) onto the site of the former Manchester Guardian offices on the opposite side of Market Street. Boots took the 110,000 square feet (gross) extension in its entirety, their biggest store at the time.[7]
Arndale Proprty Trust was acquired by Town & City Properties in April 1968.[8] A public enquiry into the redevelopment of the area started on 18 June 1968, with a submission that the existing street pattern, while historic, was "hopelessly inadequate for modern requirements". The city planning officer gave evidence that "the development would be comparable with the best carried out in North America and Scandinavia"[9] The scheme was to include seven public houses and a 200-bed hotel.[10] An economist gave evidence that spending in central Manchester would double by 1981.[11] The enquiry finished on 8 July 1968[10] and reported in early November 1969. The inspector approved the scheme, noting that the region north of Market Street needed redeveloping, and it was sensible to redevelop the frontage too.[12] Manchester corporation compulsorily purchased a further 8 acres (3 ha) of property in 1970[13] using money raised by selling land purchased for overspill housing.[14]
Before clearance, the area was a patchwork of mostly Victorian buildings on a 17th and 18th century layout of streets, alleys, and courts.[15] Opinions differ as to the quality of the architecture. A map prepared for the 1961 meeting of the British Association shows shops fronting Market Street and Cross Street, with mainly warehousing behind (the opposite, south, side of Market Street was again fronted by shops, but was mostly office buildings behind).[16] Neither Stewart’s The Stones of Manchester (1956) nor Sharp et al’s survey Manchester Buildings (1966) describe the area in general or any buildings in particular. Stewart is generally strong on Victorian architecture, and none of its sixty "principal buildings" lie in it. Sharp et al covered both older and (then) new buildings; of the many described, from across the city, over fifty are in the city centre but none are in the cleared area.[17][18] Pevsner, writing in 1969 when clearance was due, found nothing of note.[19] In evidence to the public enquiry, all buildings were described as obsolescent by H W D Sculthorpe, the town clerk.[13] Hamilton (2001) writes that the area reflected Manchester’s wealth and leadership in the middle of the 19th century, with buildings designed by leading UK architects (though names are not given).[20]
Design and Construction
The architects were the partnership of Hugh Wilson and Lewis Womersley. Their other work as a pair included Hulme Crescents; Womersley, as Sheffield city architect, was responsible for Park Hill. The developers and the corporation did not allow the architects a free hand with the design of the centre. The developers demanded a closed building with little natural light and rejected a more open, roof-lit, design. The corporation insisted on a bus station, a market, car parking, an underground railway station, and provision for deck access to later developments. Cannon Street, which ran through the middle of the site, was to be kept open, and there were to be no shop fronts on it. Similarly, Corporation Street and High Street were main routes and only allowed shop fronts on the returns to Market Street. Market Street was then a busy thoroughfare, but was allowed shop fronts as it was due to be closed to traffic (though this did not happen until 1981). The three parties—architects, developers, and city—did not communicate well. As display windows were forbidden on most of the external parts of the centre, it inevitably followed that they had to be internal. The architects knew that "the brief [as] given … would produce a very introverted building. And we said this would not be attractive".[21][22]
Construction started in 1972. The building opened in stages, with the Arndale Tower and 60 shops opening in September 1976; followed by Knightsbridge Mall (the bridge over Market Street) in May 1977; the northern mall in October 1977; the market hall, Boots, and the bridge to the Shambles (over Corporation Street) in 1978; and finally the bus station off Cannon Street and the two anchor stores of Littlewoods and British Home Stores (close to the Market Street/High Street junction) in 1979.[23] On opening, the centre contained 210 shops and over 200 market stalls.[24]
The cost, estimated at £11½M in the public enquiry in 1968, had risen to £26M by 1972,[25] and to £30M by 1974, forcing the formation of the Manchester Mortgage Corporation, a partnership of Town & City, the Prudential Assurance Company, and Manchester Corporation. The trio remained convinced they were building "the finest shopping centre in Europe". The joint company, effectively run by Manchester Corporation, raised £5M on the stock market,[26][27] (a first for a company formed by a local authority), after the Prudential admitted it could not fully fund the project.[5] Town & City came close to bankruptcy, forcing them into a reverse takeover of Jeffrey Sterling’s Sterling Guarantee Trust in April 1974[28] and a £25M rights issue in 1975–6.[25][29] Costs reached £46M by 1974, of which £13M came from the council.[29] The final cost, described as "enormous" by Parkinson-Bailey, was £100M, made up of £11.5M for land, £44.5M for the building, and £44M for fitting out.[30]
"If there is some street or old shop in the market square, dock factory or warehouse, barn or garden wall which you have passed often and take for granted, do not expect to see it there next week. Because it is not listed, because it is of 'no historical interest' the bulldozers will be in and part of your background will be gone forever"
John Betjeman in The rape of Britain[31]
A backlash against comprehensive development in general was underway before the centre opened. Amery and Cruickshank’s critical The rape of Britain, with a foreword by John Betjeman, was published to mark European Architectural Heritage Year in 1975. Manchester is one of about twenty towns described in the book – under the heading "scenes of rape" – and is singled out in the introduction as an example of "brutal obliteration" undertaken by "the mind that seriously believes that the centre of Manchester should look like a futuristic vision or a barbaric new city borrowed from Le Corbusier". The pressure group SAVE Britain's Heritage was formed in the same year, in part to discourage the wholesale demolition of unremarkable industrial buildings in the north of England.[32]
Early days
The early centre was split by two roads, Market Street and Cannon Street. South of Market Street, on the old Guardian buildings, was (and still is in 2009) a branch of Boots. A mall (then called Knightsbridge, later Voyager Bridge) bridges Market Street. The part between Market Street and Cannon Street was (and is) mostly two-storey and contained most of the anchor stores and access to the office block. The land falls about 24 feet (7 m) from High Street to Corporation Street, so that the ground level entrance at High Street is to the upper level, and that at Corporation Street is at the lower level. A centrally-placed entrance from Market Street enters via a mezzanine into Hallé Square, an open space. In the part north of Cannon Street, the ground floor was mostly taken up by the bus station, with the upper floor shops. At the High Street end was a two-floor market area and, over the shopping centre, sixty flats. The two parts were joined by a mall over Cannon Street at the Corporation Street end (ie lower) and a tunnel under Cannon Street at the High Street end (ie higher). Thus, there was a continuous pathway around the centre, but not at a single level. A multi-storey car park was sited above the market centre and over Cannon Street at the High Street end. In all there were 1,360 yards (1,240 m) of mall. Underneath the centre was a circular full-height service road, ½ mile (0.8 km) in overall length, with access at Withy Grove. By taking advantage of the change in height, the architects hoped to solve the often-seen problem of persuading shoppers to use the upper shopping area. While the northern part had no anchor stores, the placing of the car park and bus station meant that there would naturally be foot traffic through the area. Hence, the architects hoped, there would be no quiet spots.[33]
The final building was considered excessively large, and "an awful warning against thinking too big in Britain’s cities".[21] The underground railway scheme was abandoned in about 1976[34][25] and the only requirement for deck access was across Corporation Street to another Town & City development in the Shambles.[21][35] Its appearance has always attracted comment. In 1978 it was described as "so castle-like in its outer strength that any passing medieval army would automatically besiege it rather than shop in it ..."[21] At the official opening, one of its champions, Dame Kathleen Ollerenshaw, Mayor of Manchester, commented, "I didn’t think it would look like that when I saw the balsa wood models".[20] The "unrepentant" architects responded that they had provided what they had been asked to provide.[21] Kenneth Stone said in 1978 "We’re not responsible for everything in there, but we’re not sorry about the decisions we took as opposed to those which were forced upon us." The critics' opinion did not mellow with time, and it was described as "aggressive externally" in 1991.[36] The Economist noted in 1996 that it had "long been regarded as one of Europe's ugliest shopping centres. ... the epitome of lousy modern architecture ... [the outside] was hated".[37] The Financial Times in 1997 called it, with Birmingham's Bull Ring, "outstandingly ugly"[38] and in 2000 "one of Britain’s least-loved buildings".[39]
The main cause of its poor reputation (in the long term) was its external appearance. Most of the centre was covered by pre-cast concrete panels faced with ceramic tiles.[33] These tiles were made by Shaw Hathernware in a colour, T1980, that is technically "deep buff"[40] but is usually referred to as yellow. Variants include "bile yellow"[41] "putty and chocolate" (some parts were brown)[42] and "vomit-coloured".[37] These tiles inspired the epithet "the longest lavatory wall in Europe" (and variations), poking fun at the developers' claims.[43][44] According to The Guardian, the description was coined by Norman Shrapnel, the paper’s political columnist.[45]
Wear and tear and the vagaries of fashion mean the typical life of a shopping centre is about 10–20 years. Given a free hand, the owners must decide the most profitable choice between demolition, refurbishment, or doing nothing.[46] In the Arndale’s case, refurbishment began about six years after opening. The constant artificial lighting and undistinguishable malls, with multiple dead ends and no obvious circular route meant that shoppers were, in Morris's words, "bewildered by its maze-like intensity". Parkinson-Bailey describes the centre in this period as "never the pleasantest place to shop in … hot and stuffy".[47] Criticisms were addressed in a £½M upgrade[48] in which roof lights were inserted to allow in daylight, which also meant pot-plants could be grown.[49] To improve shoppers' navigation and to tone down the appearance, the flooring of each area was given a distinct colour scheme, decorative ironwork was added, a fountain was placed at one corner, and a double-floor height aviary placed at another. The Arndale's own radio station, Centre Sound, was installed. Hallé Square housed a food court by day, and could be used as a concert area by night if required. Beddington describes the results as "workmanlike but unromantic".[36]
Town & City reverted its name to Sterling Guarantee Trust in 1983,[50] and in February 1985 merged with the Peninsular and Oriental Steam Navigation Company (universally called P & O), also run by Jeffrey Sterling.[51] P & O decided to refurbish Knightsbridge (the bridge over Market Street) with the aim of doubling the rents. The work took place in 1990–1, with the most visible change being the opening of a £9M food court (Voyagers) in an area not previously open to the public. The refurbishment was a success and the addition increased the popularity of the centre as a whole.[52]
By 1991 the bus station was Manchester’s busiest, handling 30,000 passengers and 1500 bus movements per day.[36]
As a shopping centre it was outstandingly succesful, and the critics' opinions were not universally held – especially by its owners.[53] By 1996 the Arndale was fully let and raising £20M a year in rents,[54] was the seventh busiest shopping area in the UK in terms of sales,[55] and was visited by 750,000 people a week.[56] The poet and author Lemn Sissay wrote "The Arndale Centre was always just the Arndale Centre. A palace of Perspex and people. A light extravaganza. ...a shopper's heaven on earth. In all its gargantuan glory I love it. Whether it is ugly or not is a purely subjective opinion. It is wonderful inside."[57]
1996 IRA bombing
The centre's profile, and the presence of several national chains, made it a target for terrorists. Arson attacks in April 1991 were followed by several firebombs in December 1991 which caused extensive damage to four stores. The Provisional Irish Republican Army (IRA) was blamed for both incidents, in which the devices were placed in soft furnishings during shopping hours.[58] After the second, Christmas shopping continued much as normal the following day in the unaffected stores. One unnamed fireman noted "What bugs me is if there's a big one planted there's a lot of glass around here, and a lot of people will be killed".[59]
Two men parked a van containing a 1,500 kg (3,300 lb) bomb on Corporation Street between Marks & Spencer and the Arndale at about 9:20 in the morning on Saturday 16 June 1996. At about 9:45, a coded warning was received by Granada TV, the local television station. The usual weekend population of people going about their everyday lives was supplemented by football fans in town for the Russia v. Germany game of UEFA Euro 1996, due to be staged the following day at Old Trafford. About 80,000 people were cleared from the area by local police and store staff using procedures developed after another IRA bombing incident in 1992, assisted by outside staff experienced in crowd control drafted in to help with the football fans. The bomb exploded at about 11:15, shortly after the army bomb squad arrived from Liverpool and began making it safe. Nobody was killed by the bomb, but over 200 people were injured, some seriously, mostly by flying glass, though one pregnant shopper was thrown in the air by the blast.[60]
In all 1200 properties on 43 streets were affected. Marks and Spencer's and the adjacent Longridge House were condemned as unsafe within days, and would be demolished. The frontage of the Arndale on Corporation Street and the footbridge were structurally damaged.[61] The reinsurance company Swiss Re estimated that the final insurance payout was over £400M, making it, at the time, the most expensive man-made disaster ever[61][62] (the costs of the 2001 attack on the World Trade Centre are greater).
Recent developments
Over the past decade, the centre has seen large-scale redevelopment. The centre now has a retail floorspace of 1,400,000 sq ft (130,060 m²), making it the Europes largest city-centre shopping mall.[63] It has held this record continuously since construction apart from a brief spell during the northern redevelopment when the title was held by the Birmingham Bullring. As well as retail space, Manchester Arndale also includes a 96 m tower containing office space.
Since renovation began, most of the tiles have been removed and a more modern sandstone and glass cladding introduced.[64] Now, the Manchester Arndale is home to Next, their largest in the world and features the largest glass store frontage in the UK.
By the late 1990s the centre was no longer owned by the Arndale Property Trust. A rebranding was proposed, but subsequently abandoned. Today the centre is jointly owned by PRUPIM and Capital Shopping Centres.
Manchester wasn't the only city to build a major shopping centre in it's city centre, the desire to provide modern shopping facilities was prevelant amoungs most councils in major cities, where the old Victorian buildings couldn't accomodate modern retailers. Other examples from around the same time include the Bull Ring, Birmingham and the Merrion Centre, Leeds.
Redevelopment
The centre was badly damaged in the 1996 Manchester City Centre bombing by the Provisional IRA and required extensive redevelopment work. In the immediate aftermath of the bombing the southern half of the centre was repaired and refurbished. The northern half was patched up with buses originally stopping on Cannon Street itself, before being replaced by Shudehill Interchange in January 2006. Marks and Spencer, which was particularly badly damaged in the explosion, reopened in a separate building, linked to the main mall on the first floor by a glass footbridge which was designed by Stephen Hodder. Shortly after opening the large branch, the building was split into two independent shops. Half remained a branch of Marks and Spencer while the side facing The Triangle became a branch of Selfridges.
In October 2003, as the final stage of rebuilding the city centre after the bombing, the whole of the half of the centre north of Cannon Street was closed and demolished. Over the next two to three years, the northern half of the centre was completely rebuilt and extended. The first phase of the "northern extension", known as 'Exchange Court', opened on 24 October 2005. Exchange Court features Britain's flagship and the world's largest Next store and River Island. This was followed by the second phase known as 'New Cannon Street'. This opened on 6 April 2006. Stores in this phase include a new flagship branch of TopShop and Topman.
On 7 September 2006 the third and final phase of the northern extension opened. The new Winter Garden features stores such as a new Zavvi (formerly Virgin Megastores) to replace the one that used to be on Market Street, a Waterstone's bookshop, and a new single-level unit for the Arndale Market. The completed mall provides a link from Exchange Square and The Triangle to the Northern Quarter, and from Market Street to The Printworks.
Only the southern half of the centre has been extensively refurbished, and there are some major design differences between the two halves of the centre. Halle Square has been modernised, including new skylights, but there is still a major difference in levels of natural light between the original malls and the northern extension. The original 1970s malls were designed to "protect" visitors from the outside, whereas the newer malls seek to maximise natural light.
Food Court
Like many large shopping malls, Manchester Arndale has a food court. The Food-Chain (formerly known as Voyagers) is an 800-seat food court situated on the second floor above the far south-west tip of the centre. It can be reached by an escalator from Market Street and from the first floor at the south-western tip of the centre close to Argos and the first floor entrance to Boots.
References
- ^ "Getting here". Manchester Arndale web pages. Retrieved 12 December 2008.
•NCP (Manchester) Limited is a joint venture between National Car Parks (NCP) and Manchester City Council, see "About us". Retrieved 12 December 2008. - ^ Frame, Don (20 October 2005). "Revealed: The new Arndale". Manchester Evening News. M.E.N media.
{{cite news}}
: Unknown parameter|accessdaymonth=
ignored (help); Unknown parameter|accessyear=
ignored (|access-date=
suggested) (help) - ^ Wainwright, Martin (20 January 1990). "Arndale heritage: Obituary of Sam Chippindale". The Guardian.
•"Arnold Hagenbach: Entrepreneur whose Arndale shopping centres brought US-style modernity to postwar Britain's high streets". The Times. 8 April 2005.
•Marriott, Oliver (1967). The property boom. H Hamilton. ISBN 0-241-91325-X.
•Atkins, Philip (1987). Guide across Manchester : a tour of the city centre, including the principal streets and their buildings. Manchester: North West Civic Trust. ISBN 0-901347-38-8.{{cite book}}
: Unknown parameter|coauthors=
ignored (|author=
suggested) (help)
•"Arndale Action". Property Week. 6 August 1999. - ^ Nicholas, R: "Planning the city of the future", in Carter (1962) pp. 254–262.
- ^ a b "Arndale in Manchester". Built Environment. 3 (3): 138–42. 1974.
- ^ "£15M plan for centre of Manchester". The Times. 14 January 1965.
- ^ "£30m project for Manchester Central station site". The Times. 18 January 1973.
- ^ "Town & City Properties figures 91/2 PC higher". The Times. 2 August 1968.
- ^ Morris, Michael (19 June 1968). "Plans for 30-acre shopping precinct". The Guardian.
- ^ a b "Plan to develop city centre area". The Guardian. 10 July 1969.
- ^ "Attracting spending power". The Guardian. 3 July 1968.
- ^ Morris, Michael (3 November 1969). "Ministry approves city shopping plan". The Guardian.
- ^ a b Morris, Michael (25 November 1970). "23-storey tower in £30M city plan". The Guardian.
- ^ Morris, Michael (23 July 1970). "Manchester property plan". The Guardian.
- ^ Morris, Michael (19 June 1968). "Plans for 30-acre shopping precinct". The Guardian.
- ^ Freeman, T W: "The Manchester conurbation", in Carter (1962) pp. 47–60.
- ^ Stewart, Cecil (1956). The Stones of Manchester. London: Edward Arnold.
- ^ Sharp, Denis; et al. (1966). Manchester Buildings. Architecture North West. Vol. 19.
{{cite book}}
: Explicit use of et al. in:|author=
(help) - ^ Pevsner, Nikolaus (1969). Lancashire. The buildings of England. Harmondsworth: Penguin. ISBN 0-140-71036-1.
- ^ a b Hamilton, Andy; et al. (2001). "Learning through visual systems to enhance the urban planning process". Environment and Planning B: Planning and Design. 28: 833–845. doi:10.1068/b2747t.
{{cite journal}}
: Explicit use of et al. in:|author=
(help) - ^ a b c d e "The architects have taken all the stick ... but there are answers to a lot of the questions". The Guardian. 16 October 1978.
- ^ Parkinson-Bailey (2000), pp. 194–5, 209–212.
- ^ "£100m new look for Arndale". Manchester Evening News. 2 August 2000.
- ^ Law, Christopher M (1986). "The uncertain future of the city centre: the case of Manchester". Manchester Geographer. 7: 26–43.
- ^ a b c Waterhouse, Robert (14 January 1976). "Citadel seeking instant success". The Guardian.
- ^ Hanson, Michael (23 April 1974). "Local authorities join in Partnership schemes". The Times.
- ^ Raggett, B P. "Principles of partnership schemes: Theory and practice". Journal of Property Research. 1 (2): 83–99. doi:10.1080/02640828408723871.
- ^ Davis, John (7 April 1974). "Triumph for Sterling". The Observer.
•McRae, Hamish (7 July 1983). "There's no guarantee that P & O will fit in Sterling but you never know". The Guardian.
•Cowton, Rodney (7 July 1987). "Special Report on P&O (1837 - 1987) (1): Royal salute to a long voyage". The Times. - ^ a b Hanson, Michael (8 April 1976). "Britain's largest shopping centre". The Guardian.
- ^ Parkinson-Bailey (2000), p. 210.
- ^ Betjeman, John: in Amery & Cruickshank (1975), p. 7.
- ^ Amery and Cruickshank (1975) pp. 12, 14. Parkinson-Bailey (2000) pp. 204–205.
- ^ a b Wilson, Hugh (c1972). Arndale Centre, Manchester. Manchester: University of Manchester.
{{cite book}}
: Check date values in:|year=
(help); Unknown parameter|coauthors=
ignored (|author=
suggested) (help)CS1 maint: year (link) - ^ Haywood, Russell (1998). "Mind the gap: Town planning and Manchester's local railway network: 1947–1996". European Planning Studies. 6 (2): 187–210. doi:10.1080/09654319808720454.
- ^ Parkinson-Bailey (2000).
- ^ a b c Beddington (1991), pp. 39, 40, 46–7, 163–5.
- ^ a b "Silver lining". The Economist. 341 (7989): 69. 1996.
- ^ Wolffe, Richard (10 March 1997). "Radical remake in a tale of two cities". Financial Times.
- ^ Jones, Sheila (3 August 2000). "Least-loved mall to be redeveloped". Financial Times.
- ^ Stratton, Michael (1996). Structure and style : conserving 20th century buildings. London: E. & F. N. Spon. p. 184. ISBN 0-419-21740-1.
- ^ Jacobson, Howard (3 December 1999). "My Manchester". The Independent.
- ^ Atkins, Philip (1987). Guide across Manchester : a tour of the city centre, including the principal streets and their buildings. Manchester: North West Civic Trust. ISBN 0-901347-38-8.
{{cite book}}
: Unknown parameter|coauthors=
ignored (|author=
suggested) (help) - ^ Chartres, John (16 August 1976). "Twelve pleasurable ways of getting to know 'England's second city' from a first-floor perspective". The Times.
- ^ Bryson, Bill (1993). Notes from a small island. London: Doubleday. ISBN 0-385-60073-9.
- ^ "A complex city of many centres with echoes of the Crystal Palace and the public lavatory". The Guardian. 10 November 1981.
- ^ Guy (1995), pp. 187–8.
- ^ Parkinson-Bailey (2000), p. 211.
- ^ "Arndale centre improving". Building. 247 (7372): 8. 1984.
- ^ Adams, David (2005). Planning, public policy & property markets. Oxford: Blackwell. ISBN 1-4051-2430-X.
{{cite book}}
: Unknown parameter|coauthors=
ignored (|author=
suggested) (help) - ^ Pagano, Margareta (July 7 1983). "Sterling to become P & O deputy chairman". The Guardian.
{{cite news}}
: Check date values in:|date=
(help) - ^ The monopolies and mergers commission (1986). The Peninsular and Oriental Steam Navigation Company and European Ferries Group PLC. A report on the merger situation. London: HMSO.
- ^ Pugh, C (1992). "The refurbishment of shopping centres". Property Management. 10 (1): 38–46. doi:10.1108/02637479210030213.
- ^ Williams (2003), p. 127.
- ^ Williams(2003), pp. 172–4.
- ^ London, Simon (9 July 1996). "Shopping centres in lead". Financial Times.
- ^ Farrelly, Paul (31 August 1997). "P & O set to sell Arndale Centre for £300M". The Observer.
- ^ Sissay, Lemn (3 August 1996). "The Arndale? Don't change a single tile". Manchester Evening News.
- ^ Meikle, James; et al. (9 December 1991). "Store fire-bomb attacks prompt fear of mainland IRA campaign". The Guardian.
{{cite news}}
: Explicit use of et al. in:|author=
(help)
•Sharratt, Tom (6 April 1991). "Arson attacks on shops linked to rail station bag". The Guardian.{{cite news}}
: Unknown parameter|coauthors=
ignored (|author=
suggested) (help) - ^ Clouston, Erlend (9 December 1991). "Gritty Christmas shoppers brave fire and high water". The Guardian.
{{cite news}}
: Unknown parameter|coauthors=
ignored (|author=
suggested) (help) - ^ Lester & Panter (2006), pp. 10–15.
- ^ a b Williams (2003), p. 86–8.
- ^ Sengupta, Kim (28 March 1997). "£411M cost after Manchester bomb sets record". The Independent.
- ^ "Manchester Arndale, The Mall" (PDF). 2008. Retrieved 10 August 2008.
{{cite web}}
: Unknown parameter|dateformat=
ignored (help); Unknown parameter|month=
ignored (help) - ^ Parkinson-Bailey (2000), p. 211.
Bibliography
- Amery, Colin (1975). The rape of Britain. London: Elek. ISBN 0-236-30943-9.
{{cite book}}
: Unknown parameter|coauthors=
ignored (|author=
suggested) (help) - Beddington, Nadine (1991). Shopping centres : retail development, design and management. London: Butterworth Architecture. ISBN 0-7506-1213-4.
- Carter, Charles Frederick, ed. (1962). Manchester and its region : a survey prepared for the meeting of the British Association for the Advancement of Science held in Manchester August 29 to September 5 1962. Manchester: Manchester University Press.
- Guy, Clifford M (1994). The retail development process : location, property, and planning. London: Routledge. ISBN 0-415-07504-1.
- King, Ray (2006). Detonation: rebirth of a city. Clear Publications Limited. ISBN 0-9552621-0-0.
- Lester, Sarah (2006). The Manchester bomb. Manchester: Manchester Evening News. ISBN 0-9549042-7-3.
{{cite book}}
: Unknown parameter|coauthors=
ignored (|author=
suggested) (help) - Parkinson-Bailey, John J (2000). Manchester : an architectural history. Manchester: Manchester University Press. ISBN 0-7190-5606-3.
- Peck, Jamie (2002). City of revolution : restructuring Manchester. Manchester: Manchester University Press. ISBN 0-7190-5888-0.
{{cite book}}
: Unknown parameter|coauthors=
ignored (|author=
suggested) (help) - Williams, Gwyndaf (2003). The enterprising city centre : Manchester's development challenge. London: Spon. ISBN 0-415-25262-8.
See also
External links
- Manchester Arndale Centre home page
- Manchester Arndale Market home page for Manchester Arndale's Market
- Capital Shopping Centres (CSC) - Manchester Arndale
- Manchester Arndale Letting Plans (including Northern Extension)