List of Singapore MRT and LRT rolling stock
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
|
Singapore MRT and LRT rolling stock includes the electric multiple units that run on the Mass Rapid Transit (MRT) and the people mover systems that run on the Light Rail Transit (LRT).
Current (MRT)
Line | Generation | Stock | Manufacturer(s) | Class | Assembly | Image | Trainset statistics | Speed | Power | Service | Cost | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Number of trainsets | Cars per trainset | Number of cars | Car length | Trainset length | Car Width | Car Height | Trainset carrying capacity |
Seats | Supply | Collection | Induction | Retirement | ||||||||||
rowspan="6" style="background-color:#Template:SMRT color" |North South Line | rowspan="6" style="background-color:#Template:SMRT color" |East West Line | 1st | C151 | Kawasaki Heavy Industries, Nippon Sharyo, Tokyu Car, & Kinki Sharyo | — | Kobe, Japan[1] | 66 | 6 | 396 | 23.65 m (DT) 22.80 m (M1/M2) |
138m | 3.2m | 3.7m | 1,920 passengers | 372 (original) 208 (refurbished) |
90 km/h (56 mph) (design) 80 km/h (50 mph) (service) |
750 V DC third rail |
Contact shoe | 7 November 1987 | 2024 | S$581.5 million | |
2nd | C651 | Siemens | Vienna, Austria | 19 | 114[4][5] | 372 (original) | 2 May 1995 | — | S$259 million[6] | |||||||||||||
3rd | C751B | Kawasaki Heavy Industries & Nippon Sharyo |
Kobe, Japan | 21 | 126 |
23.83m (DT) 22.80m (M1/M2) |
139m | 272 | 8 May 2000 | S$231 million | ||||||||||||
4th | C151A | Kawasaki Heavy Industries & CRRC Qingdao Sifang |
Qingdao, China | 35 | 210 |
292 | 27 May 2011 | S$368 million[11] | ||||||||||||||
5th | C151B | 45 | 270 | 16 April 2017 | S$281.5 million[12] | |||||||||||||||||
6th | C151C | 12 | 72 | 280 | 30 September 2018[13] | $136.8 million | ||||||||||||||||
colspan="2" rowspan="2" style="background-color:#Template:SMRT color" | North East Line | 1st | C751A | Alstom | Metropolis | Valenciennes, France | 25 | 150 | 23.65 m (DT) 22.80 m (Mp/Mi) |
138.5m | 296 (standard) 240 (high capacity) |
100 km/h (62 mph) (design) 90 km/h (56 mph) (service) |
1500 V DC overhead catenary |
Pantograph | 20 June 2003 | $260 million | |||||||
2nd | C751C | Alstom & Shanghai Electric | Shanghai, China | TBD | 18 | 108 | 296 | 1 October 2015 | S$234.9 million[16][17] | |||||||||||||
colspan="2" rowspan="2" style="background-color:#Template:SMRT color" | Circle Line | 1st | C830 | Alstom | Valenciennes, France | 40 | 3 | 120 | 23.65 m (DT) 22.80 m (Mp/Mi) |
70.1m | 931 passengers | 146 | 90 km/h (56 mph) (design) 78 km/h (48 mph) (service) |
750 V DC third rail |
Contact shoe | 28 May 2009 | S$282 million[18] | ||||||
2nd | C830C | Alstom & Shanghai Electric | Shanghai, China | TBD | 24 | 72 | 26 June 2015 | S$134 million[19][20] | ||||||||||||||
colspan="2" rowspan="2" style="background-color:#Template:SMRT color" | Downtown Line | 1st | C951 | Bombardier & CNR Changchun | Movia | Changchun, China | File:Bombardier MOVIA C951.jpg | 73 | 219 | 23.65m (DM1/ 22.80m (T) |
130 | 90 km/h (56 mph) (design) 80 km/h (50 mph) (service) |
22 December 2013 | S$570.7 million[21] | |||||||||
C951A | 19 | 57 | S$119.2 million[22] | |||||||||||||||||||
colspan="2" style="background-color:#Template:SMRT color" | Thomson–East Coast Line | 1st | CT251 | Kawasaki Heavy Industries & CRRC Qingdao Sifang |
— | Qingdao, China | File:CT251 Mandai Depot.png | 91 | 4 | 364 | 23.65m (DM) 22.80m (M/T) |
92.9m | 1,280 passengers | 156 | 100 km/h (62 mph) (design) 90 km/h (56 mph) (service) |
31 January 2020 | S$749 million[23][24] | ||||||
Total | — | 488 | — | 2,278 | — | S$4.208 billion |
Future (MRT)
Line | Generation | Stock | Manufacturer(s) | Class | Assembly | Image | Trainset statistics | Speed | Power | Induction | Cost | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Number of trainsets | Cars per trainset | Number of cars | Car length | Trainset length | Car Width | Car Height | Trainset carrying capacity |
Seats | Supply | Collection | |||||||||||
style="background-color:#Template:SMRT color" |North South Line | style="background-color:#Template:SMRT color" |East West Line | 7th | CR151 | Bombardier & CNR Changchun | Movia | Changchun, China | TBD | 66 | 6 | 396 | TBD | 90 km/h (56 mph) (design) 80 km/h (50 mph) (service) |
750 V DC third rail |
Contact shoe | 2021[25] | S$827 million[26] | |||||
colspan="2" style="background-color:#Template:SMRT color" | North East Line | 3rd | C851E | Alstom | Metropolis | Barcelona, Spain | 6 | 36 | 100 km/h (62 mph) (design) 90 km/h (56 mph) (service) |
1500 V DC overhead catenary |
Pantograph | 2020s | S$249.9 million | |||||||||
colspan="2" style="background-color:#Template:SMRT color" | Circle Line | 23 | 3 | 69 | 90 km/h (56 mph) (design) 78 km/h (48 mph) (service) |
750 V DC third rail |
Contact shoe | |||||||||||||||
colspan="2" style="background-color:#Template:SMRT color" |Jurong Region Line | 1st | CJ151 | Hyundai Rotem[29] | TBD | 62 | 3 (initial) 4 (final) |
186 (initial) TBD (final) |
18.6m[30] | TBD | 2.75m[30] | TBD | 600 passengers (3-car config) 800 passengers (4-car config) |
TBD | 2026 | TBD | ||||||
colspan="2" style="background-color:#Template:SMRT color" | Cross Island Line | 1st | TBD | TBD | 8 | TBD | Overhead catenary | Pantograph | 2029 | TBD |
Engineering stock
SMRT Trains was known to use the following vehicles for maintenance of way as of 2015: [31]
Stock | Purpose | Manufacturer | Number used (as of 2015) | Crew size | Weight | Speed |
---|---|---|---|---|---|---|
Track tamping vehicle | Tamp ballasts while simultaneously measuring and correcting track alignments | Plasser and Theurer | 2 | 5 (minimum) | 37/63 tons | Max. 19 km/h (self-propelled) |
Multi-function Vehicle | A moving inspection lab that uses a rail flaw detection system to detect internal cracks within the rail in real time and roller search units with ultrasonic transducers positioned in an array of angles for thorough test coverage; also uses track geometry measurement system which records and check the geometry of the running rail and third rail. | Tamper, Plasser and Theurer[32] |
at least 2 | 4 (minimum) | 32 tons | 18 km/h (self-propelled), 40 km/h (max speed) |
Rail grinding vehicle | Re-profile the rail heads and eliminate rail corrugation to reduce track stresses and extend the service life of the rail | Speno | 2 | 4 (minimum) | 118 tons | 18 km/h (self-propelled), 50 km/h (hauled by locomotive) |
Viaduct Inspection Wagon | Inspect elastomer bearing mounted between the concrete grinders and columns | Unknown | Unknown | 4 (minimum) + 1 (External Professional Engineer) | 36 tons | 50 km/h (hauled by locomotive) |
CKG diesel locomotive | Shunt passenger trains within Bishan Depot | CKG | 2 | 2 | 26 tons | 18km/h |
Deli diesel locomotive | Provide propulsion for maintenance wagons and other machinery | Changzhou Kate Mining Machinery Engineering Co.,Ltd.[33] | 19 | 56 tons | 50km/h | |
Schöma electric locomotive | Schöma | 4 | 34 tons | 50 km/h | ||
Tunnel cleaning wagon | Use high pressure water jets to clean tracks, third rail cover, mounting brackets alongside tracks and lower portion of tunnel walls | Unknown | Unknown | 2 | 41 tons | 50 km/h (hauled by locomotive) |
Heavy crane vehicle | Lift heavy objects of up to 3-tons. | Unknown | Unknown | One operator, one Rigger, one lifting supervisor | 60 tons | Limited to 18km/h |
In addition, the Land Transport Authority is also known to have procured multi-function vehicles for the Downtown MRT Line and Thomson-East Coast MRT Line from MERMEC of Italy, a railgrinder for the Downtown MRT Line from Harsco and Bo-Bo battery-electric locomotives from CRRC Zhuzhou Locomotive.[34][35] Engineering trains are also known to be interchangeable across different lines as shown with photos of a transfer of a multi-function vehicle between Bishan Depot and Kim Chuan Depot.[32]
Current and future stock (LRT)
Line | Generation | Stock | Supplier | Image | Cars (per train) | Total no. of cars |
Power supply | Speed | Service commencement | Retirement | Cost |
---|---|---|---|---|---|---|---|---|---|---|---|
style="background-color:#Template:SLRT color" rowspan="3" | Bukit Panjang LRT | 1st | C801 | Bombardier | 1-2 | 19 | AC 3-Phase 600 V | 55 km/h (34 mph) (design) 48 km/h (30 mph) (service) |
6 November 1999 | 2020s | TBD | |
2nd | C801A | 13 | 19 November 2014 | — | TBD | ||||||
3rd | C801B | TBD | 19 | TBD | 2020s | TBD | |||||
style="background-color:#Template:SLRT color" rowspan="2" | Sengkang LRT / Punggol LRT | 1st | C810 | Mitsubishi | 1-2 | 41 | DC 750 V | 80 km/h (50 mph) (design) 70 km/h (43 mph) (service) |
18 January 2003 | TBD | ||
2nd | C810A | 16 | 5 June 2016 | TBD |
References
- ^ Dhaliwal, Ray (8 July 1986). "A milestone for the fast track". Straits Times. NewspaperSG (NLB). p. 7.
- ^ Mass Rapid Transit Corporation, Singapore 1988, p. 15.
- ^ Chris Sherwell (12 April 1984). "Kawasaki wins major Singapore metro contract". Financial Times. London. p. 1.
- ^ "References — Metro System, MRTC, Six-Car Units, Singapore". Siemens AG. Archived from the original on 31 January 2008. Retrieved 7 December 2005.
- ^ "Improved MRT train for a better ride arrives". The Straits Times. Singapore. 21 September 1994. p. 3.
- ^ Singapore, National Library Board. "Woodlands MRT line | Infopedia". eresources.nlb.gov.sg. Archived from the original on 1 January 2018. Retrieved 2018-01-06.
- ^ "Hyogo Works History". Kawasaki Heavy Industries. Archived from the original on 18 November 2005. Retrieved 19 March 2006.
- ^ "Soon, a shorter wait for MRT trains". The Straits Times. Singapore. 9 May 2000. p. 31.
- ^ "Both orders for Singapore Subway Train 132 LTA" (Press release). 29 August 2012. Archived from the original on 23 October 2012. Retrieved 5 September 2012.
- ^ "LTA awards $368m train supply job". The Business Times. Singapore. 7 May 2009.
- ^ "AWARD OF CONTRACT 151A; 22 NEW TRAINS FOR NORTH-SOUTH / EAST-WEST LINES". 6 May 2009. Archived from the original on 15 July 2014. Retrieved 6 May 2009.
- ^ "Trains for North–South/East–West Lines and Tuas West Extension". Land Transport Authority. 28 August 2012. Archived from the original on 16 November 2013.
- ^ hermesauto (2018-09-30). "New MRT trains with tip-up seats now in service". The Straits Times. Archived from the original on 30 March 2019. Retrieved 2019-03-30.
- ^ "12 More Trains to Boost Capacity of North-South and East-West Lines". Land Transport Authority. 22 September 2015. Archived from the original on 19 November 2015. Retrieved 20 October 2015.
- ^ Tan, Christopher (22 September 2015). "Kawasaki clinches contract for final batch of new MRT trains". Straits Times. Archived from the original on 25 September 2015. Retrieved 22 September 2015.
- ^ "Alstom to supply 34 Metropolis trains and signaling upgrade to Singapore metro" (Press release). Paris: Alstom. 1 February 2012. Archived from the original on 10 May 2012. Retrieved 8 April 2012.
- ^ "LTA and SMRT Award Contracts for New Trains and Re-Signalling Project". Land Transport Authority. 1 February 2012. Archived from the original on 29 September 2013. Retrieved 16 November 2013.
- ^ "Award of Electrical and Mechanical Systems Contract 830 for the Marina Line" (Press release). Land Transport Authority. 28 December 2000. Archived from the original on 11 August 2003. Retrieved 12 July 2014.
- ^ "Alstom to supply 34 Metropolis trains and signaling upgrade to Singapore metro" (Press release). Paris: Alstom. 1 February 2012. Archived from the original on 10 May 2012. Retrieved 8 April 2012.
- ^ "LTA and SMRT Award Contracts for New Trains and Re-Signalling Project". Land Transport Authority. 1 February 2012. Archived from the original on 29 September 2013. Retrieved 16 November 2013.
- ^ "LTA Awards 6 Downtown Line Contracts Totalling $1.13 Billion". Land Transport Authority. 7 November 2008. Retrieved 7 October 2019.
- ^ "Shorter Waiting Time with 15 More Trains for Downtown Line". Land Transport Authority. 28 March 2013. Retrieved 7 October 2019.
- ^ "Contract T251". Land Transport Authority. 28 May 2014. Archived from the original on 29 May 2014.
- ^ Sim, Royston (28 May 2014). "LTA buys 91 trains for Thomson, Eastern Region lines for $749 million". The Straits Times. Retrieved 7 October 2019.
- ^ "Land Transport Authority – We Keep Your World Moving". www.facebook.com. Retrieved 2018-08-13.
- ^ "New fleet to replace 66 oldest MRT trains from 2021". Channel NewsAsia. Archived from the original on 25 July 2018. Retrieved 2018-07-25.
- ^ "Tender information | Land Transport Authority". www.lta.gov.sg. Archived from the original on 26 July 2018. Retrieved 2018-07-26.
- ^ Lim, Adrian (30 April 2018). "Alstom to supply 17 new MRT trains for North East Line and Circle Line". The Straits Times. Retrieved 7 October 2019.
- ^ "Jurong Region Line to use Korean trains with emergency battery propulsion". The Straits Times. 6 February 2020. Retrieved 6 February 2020.
- ^ a b "Smaller train cars for Jurong Region Line to navigate tight curves in built-up areas". 2018-05-10. Retrieved 2019-10-07.
- ^ "Engineering Trains in SMRT". SMRT. 30 August 2015. Archived from the original on 5 April 2016. Retrieved 6 October 2019.
- ^ a b "SMRT / MFV Transfer". Facebook. Titan Project Services (S) Pte Ltd.
- ^ "JMY600FI(B) Diesel Hydraulic Locomotive". Changzhou Kate Mining Machinery Engineering Co.,Ltd.
- ^ "Tender Information". LTA.
- ^ "Singapore Battery Electric Locomotive". CRRC Zhuzhou. 2013-11-26.
Notes
- ^ Contract covers combined cost of acquiring 36 C851E cars for the North East Line and 33 C851E cars for the Circle Line for a total of 69 cars.
- ^ Kawasaki Heavy Industries manufactured 66 cars and Nippon Sharyo manufactured 60 cars.