Jump to content

Chongqing–Wanzhou high-speed railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Ramramger (talk | contribs) at 14:55, 24 January 2021 (→‎References). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Chongqing–Wanzhou High-speed railway
渝万高速铁路
Overview
StatusPlanned
LocaleChongqing
Termini
Stations5
Service
TypeHigh-speed rail
Operator(s)China Railway High-speed
Technical
Line length291.3 km (181 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed350 km/h (217 mph)

Chongqing–Wanzhou high-speed railway is the second route between Chongqing and Wanzhou after Chongqing–Wanzhou intercity railway. The Chongqing–Wanzhou high-speed railway, on a faster 350 kilometres per hour (220 mph) alignment, is expected to open in 2025. It will take a different route, heading south to serve Zhongxian and Fengdu with new railway stations and interchanging with the existing Fuling North railway station and terminating at Chongqing East.

On 2 July 2018, initial plans for the railway, with seven stations, were unveiled.[1] Geological surveys began in 2020. The plans have been revised and the line will now have five stations. It is expected to be completed by 2025.[2]

Stations

Station Name Chinese Metro
transfers/connections
Chongqing East 重庆东 6 8 18 27
Fuling North 涪陵北
Fengdu North 丰都北
Zhongxian 忠县
Wanzhou North 万州北

References

  1. ^ 涪陵发布 (2019-02-20). "渝万高铁计划今年开工!途经涪陵!_手机网易网". 3g.163.com. Retrieved 2020-08-19.
  2. ^ "渝万高铁时速350公里 设5个站点". www.cq.xinhuanet.com (in Chinese). Retrieved 2020-08-19.