Linha Universidade

From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by Jvalienforce (talk | contribs) at 18:02, 11 July 2023. The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
Linha Universidade
Company typePrivate (S.A.)
IndustryRail transport
Founded22 November 2019; 5 years ago (2019-11-22)
Headquarters
Key people
Jaime Juraszek (CEO)[1]
ProductsCommuter transport
OwnerAcciona
Websitewww.linhauni.com.br

Linha Universidade or LinhaUni is the company responsible for the construction and operation of São Paulo Metro Line 6-Orange for 24 years (2020–2044), through a public-private partnership concession, in partnership with the Government of the State of São Paulo.[2][3] Its main associate is Spanish group Acciona.[4][5]

Line 6, in its first phase, will have 15.3 km (9.5 mi) of extension, and will connect stations Brasilândia and São Joaquim, being completely underground.[6][7]

LinhaUni rolling stock

[edit]

Line 6 will have a rolling stock of 22 trains, with 6 cars each, to be made by Alstom.[8][9]

See also

[edit]

References

[edit]
  1. ^ Lobo, Renato (10 July 2023). "Empresa resgata 4.000 itens históricos em obras de estação do metrô". Via Trólebus (in Brazilian Portuguese). Retrieved 11 July 2023.
  2. ^ Lobo, Renato (5 October 2020). "Em edição extra no Diário Oficial, concessionária assume terrenos da Linha 6 do Metrô". Via Trólebus (in Portuguese). Retrieved 28 November 2020.
  3. ^ Meier, Ricardo (9 October 2020). "Linha Universidade consegue captar R$ 1 bilhão para financiar obras da Linha 6-Laranja". Metrô CPTM (in Portuguese). Retrieved 28 November 2020.
  4. ^ "Concessionária Linha Universidade". LinhaUni (in Portuguese). 2020. Retrieved 28 November 2020.
  5. ^ Lobo, Renato (8 October 2020). "Quem é a Acciona, principal sócia da operadora da Linha 6-Laranja do Metrô?". Via Trólebus (in Portuguese). Retrieved 28 November 2020.
  6. ^ Meier, Ricardo (7 October 2020). "LinhaUni será a operadora da Linha 6-Laranja a partir de 2025". Metrô CPTM (in Portuguese). Retrieved 28 November 2020.
  7. ^ Meier, Ricardo (5 October 2020). "Doria anuncia retomada das obras da Linha 6-Laranja nesta terça-feira, 6". Metrô CPTM (in Portuguese). Retrieved 28 November 2020.
  8. ^ Meier, Ricardo (23 October 2020). "Alstom volta a ser contratada para fornecer trens da Linha 6-Laranja do Metrô". Metrô CPTM (in Portuguese). Retrieved 28 November 2020.
  9. ^ "Trens da Linha 6-Laranja serão fornecidos pela Alstom". Revista Ferroviária (in Portuguese). 23 October 2020. Retrieved 28 November 2020.
[edit]