Jump to content

Line 7 (Hangzhou Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by GreenC bot (talk | contribs) at 16:17, 14 August 2023 (Removed 2 archive links. Wayback Medic 2.5). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 7
 7 
Train of Line 7 is departing from Olympic Sports Center
Overview
StatusOperational
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
Termini
Stations24
Service
TypeRapid transit
SystemHangzhou Metro
Services1
Operator(s)Hangzhou Metro Corporation
Depot(s)Yingzhong Depot
Jiangdongsan Road Stabling Yard
Rolling stock6 cars, type A
History
Opened30 December 2020; 4 years ago (2020-12-30)
Technical
Line length47.48 km (29.50 mi)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead, 1500 V DC
Operating speed100 km/h (62 mph)
Route map

1
Wushan Square
2
Jiangcheng Road
 5 
Chengzhan  1   5 
3
Moyetang
4
Guanyintang
 9 
5
Citizen Center
 4 
6
Olympic Sports Center
 6 
7
Xingyi
8
Mingxing Road
9
Jianshesan Road
 2 
Left arrow Chaoyang – Liangzhu Right arrow
10
Xinxing Road
11
Xinhan Road
12
Xinjie
13
Hehuan Road
Yingzhong Depot
14
Yingzhong
15
Kanshan
16
Xingang
17
Xiaoshan International Airport
 1   19  Hangzhou Xiaoshan International Airport
18
Yongsheng Road
 19 
19
Xinzhen Road
20
Yipeng
21
Tangxinxian
22
Middle Qingliu Road
 8 
23
Qicheng Road
24
Jiangdong'er Road
Jiangdongsan Road Stabling Yard
Line 7 drawn to scale.

Line 7 of the Hangzhou Metro (simplified Chinese: 杭州地铁七号线; traditional Chinese: 杭州地鐵七號線; pinyin: Hángzhōu Dìtiě Qīhào Xiàn) is a metro line in Hangzhou.[2][3] The line will be 47.48 km long and will run in a west–east direction between Wushan Square station in Shangcheng District and Jiangdong'er Road station in Qiantang District in the east,[4] passing through downtown Hangzhou and providing transfers with multiple other lines in the system. The section between Olympic Sports Center Station and Jiangdong'er Road Station was opened on 30 December 2020,[5] the remaining section opened on 1 April 2022.

Opening timeline

Segment Commencement Length Station(s) Name
Olympic Sports Center — Jiangdong'er Road 30 December 2020 39.62 km 19 Initial Section of Phase 1
Olympic Sports Center — Citizen Center 17 September 2021[6] 3 km[6] 1 Central Section of Phase 1
Citizen Center — Wushan Square
(except Moyetang)
1 April 2022[7][8] 6 km[7] 4 Remaining Section of Phase 1
Moyetang 22 April 2022 - 1 Infill station

Stations

Legend

  - Operational
  - Under construction

Station name Connections Distance
km
Location Opening date
English Chinese
Wushan Square 吴山广场 0 0 Shangcheng 1 April 2022[8]
Jiangcheng Road 江城路  5 
Moyetang 莫邪塘 22 April 2022
Guanyintang 观音塘  9  1 April 2022[8]
Citizen Center 市民中心  4  17 September 2021[6]
Olympic Sports Center 奥体中心  6  Binjiang 30 December 2020
Xingyi 兴议 Xiaoshan
Mingxing Road 明星路
Jianshesan Road 建设三路  2 
Xinxing Road 新兴路
Xinhan Road 新汉路
Xinjie 新街
Hehuan Road 合欢路
Yingzhong 盈中
Kanshan 坎山
Xingang 新港
Xiaoshan International Airport 萧山国际机场  1   19  Hangzhou Xiaoshan International Airport HGH
Yongsheng Road 永盛路  19 
Xinzhen Road 新镇路 Qiantang
Yipeng 义蓬
Tangxinxian 塘新线
Middle Qingliu Road 青六中路  8 
Qicheng Road 启成路
Jiangdong'er Road 江东二路

See also

References

  1. ^ "杭州地铁三期新增机场轨道快线、3号线北延、5号线西延". ZJNews. 6 March 2018.
  2. ^ "杭州地铁7号线即将开工 吴山广场暂时全封闭至2021年底". Hangzhou Daily. 20 August 2017.
  3. ^ "关于(杭州市)杭州地铁7号线工程的批前公示". 23 May 2017.
  4. ^ "终于等到你 杭州地铁三期10条线路获批". Qianjiang Evening Post. 22 December 2017.
  5. ^ "4条地铁同时开通!杭州十城区实现地铁全覆盖". Retrieved 2021-01-01.
  6. ^ a b c "明天下午3时 杭州地铁9号线北段和7号线市民中心站正式开通". 2021-09-16.
  7. ^ a b "今天上午10点,杭州地铁7号线江北段、9号线南段开通". 2022-04-01.
  8. ^ a b c "杭州地铁7号线江北段、9号线一期南段、5号线宝善桥站,今天全部开通了". Hangzhou.com.cn. 2022-04-01. Retrieved 2022-04-01.