This is an old revision of this page, as edited by Citation bot (talk | contribs) at 13:40, 27 September 2023 (Alter: title. | Use this bot. Report bugs. | Suggested by Whoop whoop pull up | #UCB_webform 421/599). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Alaköprü Dam
Alaköprü Dam is located in Turkey
Alaköprü Dam
Location of Alaköprü Dam in Turkey
CountryTurkey
LocationAnamur, Mersin Province
Coordinates36°10′53.05″N 32°53′44.55″E / 36.1814028°N 32.8957083°E / 36.1814028; 32.8957083
PurposeWater supply, power
StatusOperational
Construction beganNovember 2, 2010
Opening dateMarch 7, 2014
Dam and spillways
Type of damEmbankment, concrete-face rock-fill
ImpoundsAnamur (Dragon) Creek
Height93 m (305 ft)
Length385.40 m (1,264 ft)
Dam volume2,008,000 m3 (2,626,365 cu yd)[1]
Spillway typeControlled chute, two radial gates
Spillway capacity893.50 m3/s (31,554 cu ft/s)
Reservoir
Total capacity130,500,000 m3 (105,798 acre⋅ft)
Active capacity86,500,000 m3 (70,127 acre⋅ft)
Inactive capacity44,000,000 m3 (35,671 acre⋅ft)
Catchment area210.90 km2 (81.43 sq mi)
Power Station
Commission date2015 est.
TypeConventional
Installed capacity26 MW
Annual generation111.27 GWh

Alaköprü Dam (Template:Lang-tr) is a concrete-face rock-fill dam on the Anamur (Dragon) Creek in Anamur district of Mersin Province, southern Turkey. The development is backed by the Turkish State Hydraulic Works (DSİ). The dam was primarily built as part of the Northern Cyprus Water Supply Project, to supply water for drinking and irrigation to Northern Cyprus.[2][3][4]

Preliminary construction on the dam began on November 2, 2010 and the official groundbreaking took place on March 7, 2011. After the completion of the 560 m (1,840 ft) long diversion tunnel, construction of the dam started on August 9, 2012 with placement of the foundation.[4][5] The dam was completed on schedule, on March 7, 2014 but its reservoir did not begin to collect water until February 2015.[6][7] The dam's 26 MW hydroelectric power station is expected to be commissioned in 2015.[8]

Up to 75,000,000 m3 (61,000 acre⋅ft) water from the dam's reservoir, which makes more than half of its capacity, will be transferred to Geçitköy Dam in Northern Cyprus via an 80 km (50 mi) pipeline crossing the Mediterranean Sea under 250 m (820 ft) depth.[4][5]

Part of the populated places in the area such as the villages of Sarıağaç, Akine, Çaltıbükü and Ormancık will be submerged in the reservoir of Alaköprü Dam.

See also

References

  1. ^ "Alaköprü Dam and HEPP" (in Turkish). Boyut Group. Archived from the original on 15 June 2013. Retrieved 10 May 2013.
  2. ^ "Alaköprü Barajı İnşaatı" (in Turkish). Ak-Eli İnşaat. Archived from the original on 2011-03-18. Retrieved 2012-10-13.
  3. ^ "Alaköprü Barajı". Haber Anamur (in Turkish). 2012-10-12. Retrieved 2012-10-13.
  4. ^ a b c "Alaköprü Barajı Su Derivasyonu Merasimi" (PDF) (in Turkish). DSİ. Archived from the original (PDF) on 2012-10-16. Retrieved 2012-10-13.
  5. ^ a b "Alaköprü Barajı'nda Derivasyon İşlemine Başlanıyor" (in Turkish). DSİ. 2012-08-09. Retrieved 2012-11-03.
  6. ^ "TRNC Water Supply Project giant step" (in Turkish). Anadolu Ajansi. Retrieved 22 December 2014.
  7. ^ "Alakopru Dam began to fill with water". Kibris. 16 February 2015. Retrieved 25 February 2015.
  8. ^ "Alaköprü DAM and HPP". Boyut Group. Archived from the original on 22 December 2014. Retrieved 22 December 2014.