Line 1 (Changzhou Metro)
Line 1 | |
---|---|
1 | |
Overview | |
Status | In operation |
Locale | Changzhou |
Termini | |
Stations | 29[1] |
Service | |
Type | Rapid transit |
System | Changzhou Metro |
History | |
Opened | 21 September 2019[2] |
Technical | |
Line length | 34.24 km (21.28 mi)[3] |
Character | Underground and Elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 1 of Changzhou Metro (Chinese: 常州地铁1号线; pinyin: Chángzhōu Dìtiě Yī Hào Xiàn) is a rapid transit line in Changzhou.
Construction for Line 1 began on 28 October 2014. The first phase runs from Template:ChangzhouM stations (森林公园) in the north to Template:ChangzhouM stations (南夏墅) in the south. Line 1 opened on 21 September 2019.[2]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Forest Park — Nanxiashu | 21 September 2019[2] | 34.24 km (21.28 mi)[3] | 29 | Phase 1 |
Stations
References
- ^ "揭开神秘面纱 常州地铁1号线向媒体开放".
- ^ a b c "常州地铁1号线今日正式开通初期运营". 2019-09-21.
- ^ a b "定了!常州市轨道交通1号线本周六上午9:30开通". 2019-09-18.