Overview | |
Status | In operation |
Owner | Suzhou Rail Transit Co., Ltd |
Termini | |
Stations | total 35 stations, first phase are 22 stations (6 Elevated Stations, 16 Underground Stations), second phase are 13 stations. |
Service | |
Type | Rapid transit |
System | Suzhou Rail Transit |
Operator(s) | Suzhou Rail Transit Co., Ltd |
History | |
Opened | December 28, 2013 |
Technical | |
Line length | 40.4 kilometres (25.1 mi) |
Track length | 79.2m |
Number of tracks | 2 |
Character | Elevated and Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | overhead wire |
Line 2 is the main north-south line of Suzhou Rail Transit. It passes through five districts of Suzhou, and has 22 stations, 17 underground and 5 elevated. It began operations on December 28, 2013.
History
The line was opened in two phases, with the 26.557 km (16.502 mi) long first phase from Template:SZRT stations to Template:SZRT stations near Baodai Bridge (宝带桥) started operations on December 28, 2013. This section consisted of 6.57 km (4.08 mi) of elevated track and 19.146 kilometres (11.897 mi) of underground track.[1]
The 14.347 km (8.915 mi) second phase, running from Template:SZRT stations to Template:SZRT stations in the north, and from Template:SZRT stations (尹中路站) to Template:SZRT stations (桑田岛站) in the east, commenced trial operations on September 24, 2016.[2]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Suzhou North Railway Station — Baodaiqiao South | 28 December 2013 | 26.557 km (16.50 mi) | 22 | Phase 1 |
Qihe — Suzhou North Railway Station | 24 September 2016 | 2.2 km (1.37 mi) | 2 | Phase 2 |
Baodaiqiao South — Sangtiandao | 11.643 km (7.23 mi) | 11 |
Stations
Operations
Intervals
Weekdays & Weekends | ||
---|---|---|
Period | Time | Intervals |
weekdays morning rush hours(Peak) | 7:45 — 9:00 | 6m10s |
weekdays evening rush hours(Peak) | 17:00 — 19:00 | 6m10s |
weekends daily rush hours(Peak) | 11:00 — 20:40 | 6m10s |
Other hours(Normal) | Exclude above rush hours | 6m50s |
References
- ^ "Archived copy" 2号线施工6月底结束 12月28日试营运. 扬子晚报 (in Chinese). March 25, 2013. Archived from the original on February 25, 2013. Retrieved February 22, 2013.
{{cite news}}
: CS1 maint: archived copy as title (link) - ^ "终于定了!苏州轨交2号线延伸线明天正式开通". 新华报业网. September 23, 2016.
- ^ "轨交二号线运输方案昨发布一号线将适当调整" (in Chinese). 搜狐. Retrieved December 26, 2017.