Jump to content

Yancheng–Nantong high-speed railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Garuda3 (talk | contribs) at 14:20, 29 December 2020 (adding initial operating speed 300 km/h). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Yancheng–Nantong
high-speed railway
盐通高铁
Overview
StatusUnder construction
LocaleYancheng
Nantong
Termini
Service
Operator(s)China Railway High-speed
History
Opened2020
Technical
Line length156.6 km (97 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed350 km/h (217 mph)

The Yancheng–Nantong high speed railway is a high speed line between Yancheng and Nantong in China. It has a length of 156.6 kilometres (97.3 mi) and a design speed of 350 kilometres per hour (220 mph). The line is expected to open on 30 December 2020. The initial operating speed will be 300 kilometres per hour (190 mph).[1][2]

History

Construction began on 1 May 2018.[1]

Stations

Station Name Chinese Location
Yancheng 盐城 Yancheng Jiangsu
Yancheng Dafeng 盐城大丰
Dongtai 东台
Hai'an 海安 Nantong
Rugao South 如皋南
Nantong West 南通西

References

  1. ^ a b "盐通高铁预计年底开通 途经站点正式命名". js.people.com.cn. Retrieved 2020-11-25.
  2. ^ "盐通高铁29日开始售票 30日开通运营-新华网". www.xinhuanet.com. Retrieved 2020-12-29.