Camden Town tube station

Listen to this article
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Britmax (talk | contribs) at 17:50, 6 October 2016 (Undid revision 742921711 by Wotton railway station (talk) Please leave these plans and why they did not happen, rather than removing them as though they never existed.). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Camden Town London Underground
LocationCamden Town
Local authorityLondon Borough of Camden
Managed byLondon Underground
Number of platforms4
Fare zone2
OSICamden Road London Overground[1]
London Underground annual entry and exit
2019Increase 20.50 million[2]
2020Decrease 5.51 million[3]
2021Increase 9.12 million[4]
2022Increase 17.34 million[5]
2023Increase 18.81 million[6]
Railway companies
Original companyCharing Cross, Euston and Hampstead Railway
Key dates
22 June 1907Station opened
20 April 1924Link from Euston (C&SLR) opened
Other information
External links
London transport portal

Camden Town is a London Underground station on the Northern line.[7] It is a major junction for the line and one of the busiest stations on the London Underground network. It is particularly busy with visitors to the Camden markets at weekends, and is exit-only at times when market-related traffic would cause dangerous overcrowding on the narrow platforms.[citation needed]

Northbound the next stations are Template:LUL stations and Template:LUL stations, southbound Template:LUL stations and Template:LUL stations. The station is in Travelcard Zone 2.

History

Charing Cross, Euston and Hampstead Railway

The station began life as part of the original route of the Charing Cross, Euston and Hampstead Railway (CCE&HR) (now part of the Northern line) and opened on 22 June 1907.[8] As the line here branched into two routes, to Hampstead and to Highgate, the design of the station was rather unusual, shaped like a V. The line to Hampstead (now the Edgware Branch) is under Chalk Farm Road; the line to Highgate (now the High Barnet branch) is under Kentish Town Road. With the narrowness of the roads above, and the necessity to keep directly beneath them to avoid having to pay compensation to landowners during construction, on both branches the northbound platform is directly above the southbound one.

At the apex of the V was a junction allowing northbound trains to take either of the branches north, and likewise allow the trains south from the branches to join the single southbound track. This resulted in four connecting tunnels. When the CCE&HR and City & South London Railway (C&SLR) lines were joined together after the C&SLR became part of the Underground Group on 1 January 1913,[9] a short extension was planned from the Euston terminus of the City & South London Railway to connect with the CCE&HR south of Camden Town station allowing services to run from both City and West End branches to and from the Hampstead and Highgate branches.[10] City Branch services were extended to this station on 20 April 1924.[11] This complex tunnelling work added another four tunnels that allows trains to proceed to or from either the Edgware or High Barnet Branch on to or off both the City or Charing cross branch without following conflicting paths [12] The multiple junction tunnels are effectively located beneath Camden High Street.

The original lifts and emergency stairs to the platforms were inside the vertex of the V, leading to four passageways, one to each of the platforms, with return passageways back to the lifts. With growing patronage and increasing congestion the lifts were later replaced by escalators that came into service on 7 October 1929 [13] with an escalator heading from the station building to a circulating area at the northern end of the platforms. This has only two pairs of parallel passageways, one for each branch (northbound), with a small side passage on each leading to the lower southbound platforms. One set of the original lift passageways became part of the ventilation system, but the remaining one adds to the confusion of the station. The west façade was bomb damaged in 1940 and only partially was rebuilt.

The line, known post-merger for many years as the 'Edgware - Morden' line, was formally referred to as the Northern line from 28 August 1937.[14]

2003 derailment

On 19 October 2003 the points at one of these connecting tunnels was the site of a derailment, which caused damage severe enough to close the line for over a week, although no serious injuries resulted. 1995 tube stock carriages 51722 and 52722 were both seriously damaged by the impact. After the accident, trains were restricted to travelling either from the Edgware branch to the Bank branch or from the High Barnet branch to the Charing Cross branch. This continued for some time, and many considered whether it would be permanent (particularly as this would make managing the two branches through central London easier). However, full use of the junction was restored in March 2004.

A joint report by London Underground and its maintenance contractor Tube Lines concluded that poor track geometry was the main cause of the derailment and extra friction arising out of striations (scratches) on a newly installed set of points had allowed the leading wheel of the last carriage to climb the rail and so derail. The track at the derailment site is on a very tight bend in a tight tunnel bore, which prevents canting the track by dipping the height of one rail relative to the other, the normal solution in this sort of situation.

Rebuilding plans

The station is particularly busy at weekends with tourists visiting Camden Market and Camden High Street, to the extent that entry is prohibited on Sunday afternoons to prevent overcrowding on the platforms. Congestion is predicted to get worse and entry may in the future be prohibited on Saturdays too. London Underground has therefore submitted plans for the station to be rebuilt.[15]

Rebuilding the station would ease congestion and allow it to be kept open during normal hours. Step-free access for the disabled would also be provided. Furthermore, rebuilding would allow easier interchange and facilitate the planned segregation of Northern line services in order to increase capacity on the Line as a whole.[16] In addition the general ambience of the station would be much improved.

There were plans to completely rebuild the platform area, demolishing the original liftshaft space and the current circulating area at the foot of the escalators and replacing them with a large two-level atrium, the upper level taking the form of a balcony, with various access points onto the platforms and escalator access between levels. This would be reached by an additional new set of escalators.

According to London Underground, achieving this reduction in congestion requires them to demolish the old station building. In addition, to provide both a new temporary exit during construction works, and to comply with modern safety standards, London Underground claims that it is necessary to demolish Buck Street Market, commonly known as Camden Market (one of five local markets), the Electric Ballroom, a church, and several houses and shops to the north of the station, on the south side of Buck Street.

Apart from complaints about destruction of one of the ox-blood tiled station buildings, there is a significant controversy over the demolition of the buildings to the north. Complaints particularly centred on London Underground's desire to replace the buildings with modern construction said to be out of place and out of scale with the remainder of Camden Town, together with complaints about the loss of the buildings and market themselves. This led to a public inquiry being held. In January 2004, consultants Arup published plans commissioned by Save Camden, a group of local market traders, for a remodelling that would preserve the majority of the threatened buildings, including the market. In 2005 Transport for London lost its appeal to the office of the Deputy Prime Minister and the scheme has been cancelled.

In 2013, TfL announced[17] new redevelopment plans,[18] and have scheduled the works to start in 2018 and complete by 2025.[19] The revised scheme envisages the new station building being instead on the north side of Buck Street, on the site of the soon to be vacated Hawley School, thus avoiding the need to demolish both the original station, and the other previously-threatened buildings.[20]

Station layout

Track layout
1907 to 1924
upper level
1
2
3
4
Camden Town
lower level
1924 to present
upper level
1
2
3
4
Camden Town
lower level

As one of only three stations where transfers between the Bank and Charing Cross branches of the Northern line are possible and the northern of the two junctions between them, Camden Town features a complex platform arrangement. Similar to its sister station of Kennington, the station has four platforms with cross-platform interchanges available between branches.

However, unlike Template:LUL stations, trains do not terminate at Camden Town, thus there are no terminus platforms or a loop to allow terminating trains to turn around. Instead, all northbound trains use either platform 1 or 3, with Template:LUL stations branch trains using the former and Template:LUL stations branch trains using the latter. Likewise, all southbound trains use either platform 2 or 4.

Connections

Out-of-station interchange

Camden Road station is located north of the station for London Overground services to Stratford, Hackney or Gospel Oak and Richmond.

Buses

London Buses Routes 24, 27, 29, 31, 88, 134, 168, 214, 253, 274, C2 and Night Routes N5, N20, N28, N29, N31, N253, N279 serve the station. Route 46 passes nearby.

Air raid shelter

Camden Town is one of eight London Underground stations with a deep-level air-raid shelter underneath it. The entrances are on Buck Street (near the market) and Underhill Street with the shelter tunnels reaching from just north of Hawley Crescent to south of Greenland Street.

Nearby places

See also

References

  1. ^ "Out-of-Station Interchanges" (Microsoft Excel). Transport for London. 2 January 2016. Retrieved 28 August 2016.
  2. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2019. Transport for London. 23 September 2020. Archived from the original on 9 November 2020. Retrieved 9 November 2020.
  3. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2020. Transport for London. 16 April 2021. Retrieved 1 January 2022.
  4. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2021. Transport for London. 12 July 2022. Retrieved 7 September 2022.
  5. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2022. Transport for London. 4 October 2023. Retrieved 10 October 2023.
  6. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2023. Transport for London. 8 August 2024. Retrieved 16 September 2024.
  7. ^ "Tube Map" (pdf). Transport for London. Retrieved 13 April 2015.
  8. ^ Rails Through the Clay; Croome & Jackson; London; 2nd ed; 1993; p80
  9. ^ Rails through the Clay; Croome & Jackson; London; 2nd ed; 1993; p122
  10. ^ Reconstructing London's Underground; H G Follenfant; London Transport; 2nd ed; 1975; pps 16/17
  11. ^ ABC of Underground stations; Leboff;1994; p28
  12. ^ Rails through the Clay; Croome & Jackson; 2nd ed; London;1993; p144
  13. ^ ABC of Underground stations; Leboff; 1994; p28
  14. ^ Rails through the Clay' Croome & Jackson; London; 2nd ed; 1993; p228
  15. ^ "Camden Town Redevelopment". alwaystouchout. Archived from the original on 11 November 2007. Retrieved 21 November 2007. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  16. ^ "Transport 2025 - Transport vision for a growing world city" (PDF). Transport for London. Archived from the original (PDF) on 1 October 2007. Retrieved 21 November 2007. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  17. ^ "New upgrade plan for Camden Town underground station unveiled". Camden New Journal. 13 September 2013. Retrieved 13 April 2015.
  18. ^ "We Need To Talk About Camden: The Future of the Northern Line". London Reconnections. 6 May 2013. Retrieved 13 April 2015.
  19. ^ "Fit for the Future – Stations" (pdf). Transport for London. 21 November 2013. p. 8. Retrieved 13 April 2015.
  20. ^ TfL: Camden Town Station Capacity Upgrade
Listen to this article
(2 parts, 9 minutes)
Spoken Wikipedia icon
These audio files were created from a revision of this article dated
Error: no date provided
, and do not reflect subsequent edits.
Preceding station   London Underground   Following station
Template:LUL lines
  Out of system interchange  
Preceding station   London Overground   Following station
Template:LOG lines
  Former Route  
Preceding station   London Underground   Following station
Template:LUL lines
(1907–1924)