Jump to content

Danescourt railway station

Coordinates: 51°30′02″N 3°14′02″W / 51.5005°N 3.2339°W / 51.5005; -3.2339
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Gim67gb (talk | contribs) at 15:35, 24 March 2016. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

51°30′02″N 3°14′02″W / 51.5005°N 3.2339°W / 51.5005; -3.2339

Danescourt
General information
LocationCardiff
Managed byArriva Trains Wales
Platforms2
Other information
Station codeDCT
History
Opened1987

Danescourt railway station is a railway station serving the Danescourt suburb of Cardiff, Wales.

The station is the first stop after Radyr on the Cardiff City Line 3 miles (5 km) north of Cardiff Central. The City Line was freight only from its opening (in 1859) until 1987, when British Rail introduced an hourly passenger service between Cardiff Central and Radyr.

Both of the station's two platforms are accessible for disabled passengers via ramps. The Cardiff Central-bound platform is accessible via a bridge, whilst the Radyr-bound platform is accessible via a residential road (Beale Close) off the main road (Danescourt Way). A footbridge links the two platforms.

Some non-stop passenger trains pass through in both directions.

Services

The typical Monday-Saturday off-peak service is:

Journey times from Danescourt are 12 minutes to Cardiff Central and seven minutes to Radyr. There is no Sunday service.[1]

References

  1. ^ GB eNRT December 2015 Edition, Table 130 (Network Rail)


See also

Preceding station National Rail National Rail Following station
Fairwater   Arriva Trains Wales
Coryton - Cardiff Queen Street - Radyr
  Radyr