Jump to content

Pinggu line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ASDFGH (talk | contribs) at 07:41, 28 June 2016. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Pinggu line
File:Beijing Subway icon.svg
Overview
StatusPlanned
Termini
  • Dongfengbeiqiao
  • Juhewan
Stations9
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing Mass Transit Railway Operation Corp., Ltd
History
Opened2020
Technical
Line length72km
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed160 km/h (maximum service speed)

The Pinggu Line of the Beijing Subway (Chinese: 北京地铁平谷线; pinyin: běijīng dìtiě pínggǔ xiàn) is a rapid transit rail line under planning in Beijing.

History

The Pinggu Line is included in the 2020 plan for the Beijing Subway. Construction will start in 2016 and the line will be operational by 2020.[1]

The line will begin at Dongfeng Beiqiao Station with a connection to Line 14 and will end at Juhewan Station in Pinggu District.[2][3]

References

  1. ^ Li, Qiao (2015-12-16). "Subway Pinggu Line to begin construction". Qianlong. Beijing Qianlong News Network Communications. Retrieved 2016-05-18.
  2. ^ "北京地铁2020年规划图高清大图 三条地铁直通河北" [2020 Beijing Subway plan in large detail - three lines to Hebei Province]. Bendibao (in Chinese). Retrieved 2016-05-18.
  3. ^ "最新:平谷线力争年底进场施工 燕郊设两站-搜狐". mt.sohu.com. Retrieved 2016-05-18.