Jump to content

STS-111

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ArielGold (talk | contribs) at 15:06, 1 September 2008 (removing flag icons per WP:MOS Wikipedia:FLAG#Inappropriate_use - Agency affiliation, not nationality; removed forced image sizing per MOS). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

STS-111
COSPAR ID2002-028A Edit this at Wikidata
SATCAT no.27440Edit this on Wikidata
End of mission
Launched Expedition 5 crew
Landed Expedition 4 crew
Endeavour carrying the MPLM on its approach to the ISS on STS-111
File:ISSafterSTS111.jpg
Illustration of the International Space Station during STS-111

STS-111 was a space shuttle mission to the International Space Station (ISS) flown by Space Shuttle Endeavour. STS-111 resupplied the station and replaced the Expedition 4 crew with the Expedition 5 crew. It was launched on June 5, 2002, from Kennedy Space Center, Florida.

Crew

Launched ISS Expedition 5 crew

Landed ISS Expedition 4 crew

Number in parentheses indicates number of spaceflights by each individual prior to and including this mission.

Mission parameters

Docking with ISS

  • Docked: June 7, 2002, 16:25:00 UTC
  • Undocked: June 15, 2002, 14:32:00 UTC
  • Time Docked: 7 days, 22 h, 7 min, 00 s

Mission highlights

STS-111, in addition to providing supplies, rotated the crews aboard the International Space Station, exchanging the three Expedition 4 members (1 Russian, 2 American) for the three Expedition 5 members (2 Russian, 1 American).

The Multi-Purpose Logistics Module (MPLM) carried experiment racks and three stowage and resupply racks to the station. The mission also installed a component of the Canadarm2 called the Mobile Base System (MBS) to the Mobile Transporter (MT) (which was installed during STS-110); This completed the Canadian Mobile Servicing System, or MSS. This gave the mechanical arm the capability to "inchworm" from the U.S. Lab fixture to the MSS and travel along the Truss to work sites.

STS-111 was the last flight of a CNES astronaut, the French agency having disbanded its astronaut group and transferred them to the ESA.

Mission Spacewalkers Start - UTC End - UTC Duration Mission
39. STS-111
EVA 1
Franklin R. Chang-Diaz
Philippe Perrin
June 9, 2002
15:27
June 9, 2002
22:41
7 h, 14 min Attached Power and Data Grapple Fixture to P6 Truss
40. STS-111
EVA 2
Franklin R. Chang-Diaz
Philippe Perrin
June 11, 2002
15:27
June 11, 2002
22:41
5 h, 00 min Attached Mobile Base System to Mobile Transporter
41. STS-111
EVA 3
Franklin R. Chang-Diaz
Philippe Perrin
June 13, 2002
15:16
June 13, 2002
22:33
7 h, 17 min Replace Canadarm2 wrist joint

See also