Jump to content

York University station

Coordinates: 43°46′27″N 79°29′59″W / 43.77417°N 79.49972°W / 43.77417; -79.49972
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Transportfan70 (talk | contribs) at 14:01, 12 September 2018 (Brampton Transit (Züm): added table). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

York University
General information
Location120 Ian Macdonald Boulevard
Toronto, Ontario
Canada
Coordinates43°46′27″N 79°29′59″W / 43.77417°N 79.49972°W / 43.77417; -79.49972
PlatformsCentre platform
Tracks2
Connections
  •  41  Keele
  •  335   Jane
  •  341   Keele
  •  353   Steeles
 501  Queen
Construction
Structure typeUnderground
AccessibleYes
ArchitectFoster + Partners
Architectural styleHigh-tech architecture
History
OpenedDecember 17, 2017 (2017-12-17)[1]
Services
Preceding station   TTC   Following station
Template:TTC lines

York University is a subway station on Line 1 Yonge–University of the Toronto subway. It is located on the main Keele Campus of York University, near Ian Macdonald and York Boulevards. The station opened on December 17, 2017.

History

York University station entrance building prior to the station's opening in November 2017

The official groundbreaking ceremony for the Toronto–York Spadina Subway Extension was held on November 27, 2009;[2] however, tunnelling operations did not commence until June 2011.[3] The project was initially expected to be completed by the spring of 2015 (which would have been in time for that summer's Pan Am Games) but was pushed later to the autumn of 2016,[4] it was announced on September 5, 2017, that the station would open officially on December 17, 2017.[5]

The first stage of construction for the station began in May 2011. On October 11, 2011, one of the geostructural drilling rigs on site collapsed and killed Kyle Knox, an operator working for a contractor on the project, Anchor Shoring. The incident injured five other workers.[6]

More than 1,400 Toronto Transit Commission (TTC) buses served the campus every weekday at the York University Bus Loop, in addition to hundreds more from other services including GO Transit, York Region Transit / Viva (YRT), Brampton Transit's Züm, and Greyhound. The arrival of the subway resulted in a reduced number of buses entering campus as the 196 York University Rocket bus route was eliminated and other routes such as the 195 Jane Rocket (now 935 Jane Express) and 199B Finch Rocket (now 939B Finch Express) were altered to service Pioneer Village station and Finch West station instead, leaving only the 41A Keele and 106 Sentinel routes servicing the university's grounds directly.[7] Several GO bus routes and Züm still service the campus directly.

Description

Artwork Piston Effect produces a lighting display when a train passes.

The station lies at the east end the Harry W. Arthurs Common on the west side of Ian MacDonald Boulevard.[8] The university's main buildings lie to the west; Seneca College's York campus is found to the south, and the Aviva Centre to the west. The station was built underground, lying on a northwest-southeast axis. The line approaches from Finch West station along Keele Street, then bends towards the northwest to meet the station.

Engineering Consultants Arup and Architecture firm Foster+Partners designed the station, which has a boomerang shape with entrances at the north and south ends of the structure. The north entrance contains stairs and escalators down to the concourse level and then more stairs to the fare gates. Besides stairs, the south entrance provides a barrier-free route consisting of an elevator to the concourse level plus a ramp to the fare gates.[8] Natural light flows through the concourse down to the platform level.[9] Jason Bruges Studio provided the station artwork titled "Piston Effect" consisting of a series of glass panels on the west walls at concourse and above the northbound trainway. Behind the panels are liquid crystal displays (LCDs) that detect the passage of a train and then produce a lighting display in various tones of black and white.[10][11]

The fare-paid area features a Gateway Newstands kiosk.[12]

Fares sold and accepted

Concourse level and faregates

As with all stations from Template:Ttcs north to Vaughan Metropolitan Centre, legacy TTC fare media (tokens, tickets and physical Metropasses) are accepted at this station pending elimination, but they cannot be purchased by passengers, who otherwise need to pay exact change for cash fares. Presto cards can be purchased and loaded with funds for single rides or with TTC Metropasses for unlimited travel, using various automated machines at the station.[13]

As of January 2018, some stores in the nearby York Lanes shopping centre sell legacy TTC fare media.

Surface connections

Toronto Transit Commission

Direct bus connections to the subway have been moved to Pioneer Village station to reduce bus congestion on campus, and there is no attached bus terminal at the station. Transfers are required to connect to surface routes on-street:

Route Name Additional Information
41 Keele Southbound to Keele station
335 Jane Blue Night service, southbound to Jane station
341 Keele Blue Night service, southbound to Keele station
353 Steeles Blue Night service, eastbound to Staines Road

Regional transit

The York University Vivastation, which is longer in use after YRT moved its bus connections to Pioneer Village station on September 2, 2018

All YRT bus and subway connections have been moved to Pioneer Village station, although Züm buses continue to serve this station. GO Transit bus routes stop nearby at the bus loop on York Boulevard in the University Commons area.

A memorandum of understanding between the TTC and YRT stated: "Upon commencement of revenue services operations of the [TYSSE], York Region agrees not to operate or permit the operation of public transit services directly onto the York University campus." However, this assumed the elimination of the double fare (YRT plus TTC fare) for those riding a YRT bus to Vaughan Metropolitan Centre, Template:Ttcs, or Pioneer Village stations and continuing by subway to York University. The plan was to use a third party technology system to reimburse one of the two fares; though such a solution has not yet been implemented.[14][9] However, despite the continuing lack of fare integration, YRT stopped serving the campus after September 1, 2018, forcing passengers to walk from the Pioneer Village Terminal or pay a TTC fare to take the subway one stop to reach it.[15]

GO Transit

  • 25 Waterloo/Mississauga
  • 45/46/47/48 407 West
  • 51/52/54 407 East

Brampton Transit (Züm)

Route Name Additional Information
501A/C Züm Queen Westbound to Downtown Brampton Terminal

See also

References

  1. ^ https://www.thestar.com/news/gta/transportation/2017/12/16/after-delays-cost-overruns-and-tragedy-a-subway-to-vaughan-is-complete.html
  2. ^ "Toronto–York Spadina Subway Extension breaks ground". Railway Gazette. November 30, 2009. Retrieved January 1, 2013.
  3. ^ "Tunnel boring for Toronto–York Spadina Subway Extension begins". Toronto Transit Commission. June 17, 2011. Retrieved January 1, 2013.
  4. ^ "Schedule Status Update" (PDF). Toronto–York Spadina Subway Extension Project. Toronto Transit Commission. October 24, 2012. Retrieved January 1, 2013.
  5. ^ A. Byford, CEO (March 26, 2015). "Toronto–York Spadina Subway Extension – Schedule and Budget Change" (PDF). Toronto Transit Commission. Retrieved April 1, 2015. The TYSSE project is currently 70 per cent complete. However, it has been determined that the publicly stated opening date of the end of 2016 and the approved budget are not achievable. This report recommends that a comprehensive project "reset" involving a new third-party project manager be undertaken to deliver the project by December 31st, 2017
  6. ^ Scallan, Niamh; Aulakh, Raveena (October 11, 2011). "Workers were trapped in their machines in deadly accident at TTC site". Toronto Star. Retrieved October 12, 2011.
  7. ^ "TTC Bus Route Changes". Toronto Transit Commission. Retrieved February 19, 2018.
  8. ^ a b "Toronto–York Spadina Subway Extension Project – York University Station – Approval of Conceptual Design" (PDF). Toronto Transit Commission. September 24, 2009. Retrieved September 16, 2010.
  9. ^ a b Byford, Andy (November 17, 2017). "30 days to go: York University Station". Toronto Transit Commission. Retrieved November 19, 2017.
  10. ^ "York University Station". Toronto Transit Commission. pp. Public Art. Retrieved November 19, 2017.
  11. ^ "Park-like York University Station in the heart of campus". Canadian Broadcasting Corporation. July 7, 2014. Retrieved January 21, 2018.
  12. ^ transittoronto (December 19, 2017), News: Opening Day for the Toronto-York Spadina Subway Extension, retrieved December 20, 2017
  13. ^ "New Customer Service Agents at TTC stations". Toronto Transit Commission. Retrieved February 18, 2018.
  14. ^ "Line 1 Extension – Operations and Maintenance Agreement" (PDF). Toronto Transit Commission. November 13, 2017. Retrieved November 19, 2017.
  15. ^ "York University Service Update". York Region Transit. August 7, 2018. Retrieved August 7, 2018.

Media related to York University (TTC) at Wikimedia Commons