Jump to content

Guangzhou–Zhaoqing intercity railway

From Wikipedia, the free encyclopedia
Guangzhou–Zhaoqing intercity railway
A CRH6A train entering Foshan West railway station
Overview
Native name广肇城际铁路
StatusOperational
Locale
Termini
Stations16
Service
TypeHigher-speed/regional rail
SystemPRDIR Pearl River Delta Metropolitan Region intercity railway
Services1
Operator(s)China Railway CR Guangzhou (until 23 January 2024)
Guangdong Intercity (since 23 January 2024[1])
Rolling stockCRH6
History
Opened30 March 2016; 8 years ago (2016-03-30)
Technical
Line length117.68 km (73 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC (Overhead line)
Operating speed200 km/h (124 mph)
Guangfozhao ICR route map
Up arrow 
Guangzhou–Shenzhen–Hong Kong XRL
to Shenzhen North
Guangzhou South
Left arrow 
Wuhan–Guangzhou HSR
to Guangzhou North
Left arrow 
Guangzhou–Sanshui Railway
to Guangzhou
Maintenance Depot
Right arrow 
Guangzhou–Sanshui Railway
to Foshan
Foshan West[2]
Left arrow 
Guang Link Railway
 
Down arrow 
Guiyang–Guangzhou HSR & Nanning–Guangzhou HSR
to Zhaoqing East
Shishan
Guangzhou–Zhuhai Railway (Freight Only)[3]
Shishan North
Sanshui North
Up arrow 
Guangzhou–Maoming Railway
to Foshan
Down arrow 
Guangzhou–Maoming Railway
to Zhaoqing
Yundonghai
Bei River[3]
Dawang
Sihui
Right arrow 
Guiyang–Guangzhou HSR & Nanning–Guangzhou HSR
to Foshan West
[3]
Dinghu East
Down arrow 
Guiyang–Guangzhou HSR & Nanning–Guangzhou HSR
to Guiyang North & Nanning
[3]
Dinghushan
Ling Mountain Tunnel
2203m[4]
Duanzhou
Up arrow 
Guangzhou–Maoming Railway
to Foshan
Zhaoqing
Down arrow 
Guangzhou–Maoming Railway
to Maoming

Guangzhou–Zhaoqing intercity railway, also known as Guangzhao intercity railway or Foshan–Zhaoqing intercity railway, is a regional railway within Guangdong province, China. It connects between Foshan and Zhaoqing, with through trains to Guangzhou, the capital of Guangdong province. It is a part of the Pearl River Delta Metropolitan Region intercity railway network. It commenced operations on March 30, 2016.[5]

Overview

[edit]

From Guangzhou to Foshan, the line is 53 km (33 mi) long,[6] and it continues for another 112.9 km (70.2 mi) to Zhaoqing. Between Guangzhou and Foshan, the line has a westerly heading.[6] From Foshan West railway station, the line continues west through Shishan Town in Nanhai District, across Shishan Industrial Park, over the Guangzhou–Zhuhai railway and entering Sanshui District. The line then crosses the Bei River and passes through the Zhaoqing High-tech Industrial Development Zone. The line then turns southwest, crossing the Sui river, the Guangzhou–Maoming Railway and State Road 321, and passes through Dinghu District before reaching Zhaoqing.[7][8] The line has 19 stations, 8 between Guangzhou and Foshan,[6] and 11 between Foshan and Zhaoqing. The line is connected to the Guiyang–Guangzhou high-speed railway and the Nanning–Guangzhou high-speed railway. The operational speed on the line is 200 km/h (124 mph).[9]

History

[edit]

Construction of the Foshan and Sanshui segments of the line started on September 29, 2009[10] and June 18, 2010 respectively.[11] As of April 20, 2011, the planned terminus was tentatively set at Dachong railway station.[12]

On March 8, 2012 the line was renamed from "Foshan–Zhaoqing intercity railway" to "Guangzhou–Zhaoqing intercity railway". Plans for the line were also revised to extend the line to Guangzhou South railway station.[13]

In July 2012, the plans were revised yet again, with the line being extended to Zhaoqing railway station. The route for this section was determined by September 2012.[14][15]

Construction of the Dachong elevated viaduct started on December 18, 2012,[16] and construction of the Guangzhou-Foshan segment of the line started in 2013.[6] The line commenced operations on March 30, 2016.[5]

On 10 April 2021, service patterns were changed and through running between Zhaoqing and Shenzhen Airport was introduced.[17][18]

On 11 October 2023, due to construction of Guangzhan HSR, service pattern has been shorten back to serve between Zhaoqing and Foshan West.[19]

On 1 November 2023, Guangdong Intercity got operation license of Guangzhao intercity railway.[20] Takeover of operations completed in 23 January 2024.[1]

On 22 May 2024, Guangdong Intercity further got operation license of section between Foshan West and Panyu.[21] This section is opened for service on 26 May.[22]

Stations

[edit]
Station
Station Name Distance
km
PRD MIR (CR C-train)
transfers/connections
Metro
transfers/connections
Location
English Chinese
↑ through train to Guangzhou–Huizhou intercity railway  GH 
PYA Panyu 番禺 0.00 0.00  Guangzhu   GFC  Guangzhou Metro  2   7   22  Foshan Metro  2  Guangzhou South Panyu, Guangzhou
CVA Chencun 陈村 3.92 3.92  GFC  Guangzhou Metro  7  Shunde, Foshan
BJA Beijiao West (Beijiaoxi) 北滘西 6.63 10.55 Foshan Metro  3 
SVA Shunde North (Shundebei) 顺德北 5.21 15.76 Guangzhou Metro  Guangfo  Foshan Metro  3  Dongping
ZAA Zhangcha 张槎 9.48 25.24 Foshan Metro  2  Chancheng, Foshan
FOQ Foshan West (Foshanxi) 佛山西 11.18 36.42 Foshan Metro  3   4  Nanhai, Foshan
KSQ Shishan 狮山 8.10 44.52
NSQ Shishan North (Shishanbei) 狮山北 3.75 48.27
ARQ Sanshui North (Sanshuibei) 三水北 6.37 54.64 Sanshui, Foshan
NAQ Yundonghai 云东海 11.17 65.81
WWQ Dawang 大旺 5.93 71.74 Gaoyao, Zhaoqing
AHQ Sihui 四会 6.33 78.07 Sihui, Zhaoqing
UWQ Dinghu East (Dinghudong) 鼎湖东 12.28 90.35 Dinghu, Zhaoqing
NVQ Dinghushan 鼎湖山 9.13 99.48
WZQ Duanzhou 端州 10.70 110.18 Duanzhou, Zhaoqing
ZVQ Zhaoqing 肇庆 7.50 117.68

References

[edit]
  1. ^ a b Ou Yaqin (2024-01-24). "莞惠城际,由广州地铁集团接管运营!". 南方日报 (in Chinese). Archived from the original on 2024-01-24. Retrieved 2024-01-24.
  2. ^ "新建铁路广州枢纽佛山西站及相关工程环境影响报告书(简本)". 中铁第四勘察设计院集团有限公司. August 2012.
  3. ^ a b c d 广州铁路枢纽总平面布置示意图
  4. ^ "珠江三角洲城际轨道交通广肇项目佛肇段项目环境影响报告书(简本)". 环境保护部南京环境科学研究所. July 2009.
  5. ^ a b "廣佛肇城軌擬明日開通". Sina. 2016-03-29. Archived from the original on 2016-04-12.
  6. ^ a b c d "广佛肇城轨站点确定 未来将连接广州南站". March 16, 2013. Archived from the original on June 4, 2015.
  7. ^ "广佛肇城际或10月开工 全程拟设10个车站". July 1, 2009. Archived from the original on April 29, 2014.
  8. ^ "广佛肇城轨力争明年建成通车". March 21, 2012. Archived from the original on September 23, 2015.
  9. ^ "记者深入18米地下探营广佛肇城轨施工现场". October 12, 2012. Archived from the original on April 5, 2015.
  10. ^ 广佛肇轻轨佛山段今天动工_佛山电视台新闻中心, September 29, 2009
  11. ^ "佛肇城際軌道三水段動 2013年建成通車". Xinhua. June 18, 2010. Archived from the original on December 22, 2015.
  12. ^ "广佛肇城际轨道终点暂定大冲". April 20, 2011. Archived from the original on June 4, 2015.
  13. ^ ""佛肇城轨"更名"广佛肇城轨"". March 8, 2012. Archived from the original on June 4, 2015.
  14. ^ "广佛肇城轨规划或有新变化 西部终点站延至肇庆火车站". July 31, 2012. Archived from the original on January 4, 2013.
  15. ^ "广佛肇城轨城区段设端州(大冲)及肇庆(火车站)两个站". September 4, 2012. Archived from the original on December 23, 2015. Retrieved January 14, 2015.
  16. ^ "广佛肇城际轨道大冲特大桥动工". December 18, 2012. Archived from the original on May 2, 2013.
  17. ^ "穗深城际铁路沿线新增站点 直通深圳肇庆" [Guangzhou–Shenzhen intercity railway added a new station, leads directly to Shenzhen and Zhaoqing] (in Chinese). 南方网. 10 April 2021. Retrieved 10 April 2021.
  18. ^ "广深城际将开通一站直达快车" [Guangzhou-Shenzhen railway will open direct non-stop trains]. Xinhua News (in Chinese). 8 April 2021. Archived from the original on April 8, 2021. Retrieved 10 April 2021.
  19. ^ 刘倩 (2023-10-10). "广佛肇城际列车10月11日起将不进出广州站". 南方日报. Archived from the original on 2023-10-10. Retrieved 2023-10-10.
  20. ^ "国家铁路局行政许可决定书(国铁许准字〔2023〕第373号)". National Railway Administration. 2023-11-01. Archived from the original on 2023-12-21. Retrieved 2023-12-21.
  21. ^ "国家铁路局行政许可决定书(国铁许准字〔2024〕第147号)". 国家铁路局. 2024-05-22. Archived from the original on 2024-05-24. Retrieved 2024-05-24.
  22. ^ 郑慧梓 (2024-05-24). "为大湾区一小时生活圈提速!广东城际"四线"将于5月26日贯通". 南方日报. Archived from the original on 2024-05-24. Retrieved 2024-05-24.