Jump to content

Interstate 295 (Florida): Difference between revisions

Route map:
From Wikipedia, the free encyclopedia
Content deleted Content added
→‎History: dubious, at best
Line 84: Line 84:
[[Image:Florida SR 9A south at SR 9B.jpg|thumb|300px|right|Southbound on I-295 East Beltway at the future interchange with [[State Road 9B (Florida)|SR 9B]] in southeastern [[Jacksonville, Florida|Jacksonville]]]]
[[Image:Florida SR 9A south at SR 9B.jpg|thumb|300px|right|Southbound on I-295 East Beltway at the future interchange with [[State Road 9B (Florida)|SR 9B]] in southeastern [[Jacksonville, Florida|Jacksonville]]]]


Extending from the southeast corner of the loop is planned to be [[Florida State Road 9B|Interstate 795 (SR 9B)]], an approximately {{convert|11|mi|km|adj=on}} expressway. In May 2008, the SR 9B project was suspended by the [[Florida Department of Transportation]]. The project was reinstated in 2009, and construction of phase one began in June 2010 with completion set for Spring 2013. Construction of phase two, which will extend SR 9B to I-95, is set to start in January 2013 and finish in Fall 2015. After phase two is completed, SR 9B will be renamed Interstate 795.
Extending from the southeast corner of the loop is planned to be [[Florida State Road 9B|Interstate 795 (SR 9B)]], an approximately {{convert|11|mi|km|adj=on}} expressway. In May 2008, the SR 9B project was suspended by the [[Florida Department of Transportation]]. The project was reinstated in 2009, and construction of phase one began in June 2010 with completion set for Spring 2013. Construction of phase two, which will extend SR 9B to I-95, started in May 2013 and will finish in Summer 2016. After phase two is completed, SR 9B will be renamed Interstate 795.


In February 2011, construction began for a new interchange at Collins Road, just west of the congested Blanding Boulevard exit. The $63.4 million project is expected to be complete in 2014.<ref name="collins exit">{{cite news |url=http://jacksonville.com/news/metro/2010-06-16/story/collins-road-interchange-i-295-hopes-relieve-blanding-traffic |title=New interchange expected to ease congestion at Blanding and I-295 |accessdate=September 1, 2010 | work=The Florida Times Union | first=Larry | last=Hannan | date=June 16, 2010}}</ref>
In February 2011, construction began for a new interchange at Collins Road, just west of the congested Blanding Boulevard exit. The $63.4 million project is expected to be complete in 2014.<ref name="collins exit">{{cite news |url=http://jacksonville.com/news/metro/2010-06-16/story/collins-road-interchange-i-295-hopes-relieve-blanding-traffic |title=New interchange expected to ease congestion at Blanding and I-295 |accessdate=September 1, 2010 | work=The Florida Times Union | first=Larry | last=Hannan | date=June 16, 2010}}</ref>

Revision as of 12:43, 3 June 2013

Interstate 295 marker

Interstate 295

Route information
Auxiliary route of I-95
Maintained by FDOT
Length60.864 mi[1] (97.951 km)
Existed1970–present
NHSEntire route
Major junctions
Beltway around Jacksonville, Florida
Major intersections
Location
CountryUnited States
StateFlorida
CountiesDuval
Highway system
SR 294 SR 295
SR 9 SR 9B

Interstate 295 (abbreviated as I-295), an auxiliary route of Interstate 95, is a beltway around central Jacksonville, Florida. The 60.864 miles (97.951 km)-long beltway consists of two segments, the West Beltway (formerly signed as simply I-295), and the East Beltway (formerly signed as State Road 9A), with I-95 serving as the dividing line between the two. The entire highway carries a hidden designation as State Road 9A by the Florida Department of Transportation.[2] The West Beltway was constructed in the 1970s, with the East Beltway being built from the 1980s-2000s.

Route description

Exit signs at the interchange with Interstate 95, on south I-295

Beginning at the I-95 interchange in southeastern Duval as the West Beltway, the beltway travels west, passes through the Mandarin area with interchanges at Old St. Augustine Road, and SR 13 (San Jose Boulevard). It then travels along the three mile Buckman Bridge crossing the St. Johns River immediately south of Naval Air Station Jacksonville, and serves as a major connection in the southern part of Jacksonville. At the western end of the river, I-295 continues west, serving as the border between Clay County and Duval County running just north of the town of Orange Park with interchanges at US 17/SR 15 (Roosevelt Boulevard) and SR 21 (Blanding Boulevard) serving NAS Jacksonville. The freeway then turns north with full interchanges at SR 134 (103rd Street), SR 208 (Wilson Boulevard), and SR 228 (Normandy Boulevard) before reaching the interchange at Interstate 10.

North of the I-10 interchange, the western beltway loops around the northwest side of Jacksonville with full interchanges located at both Commonwealth Avenue and Pritchard Road, before curving northwest to an interchange at US 1/US 23. The road then crosses the Trout River before crossing SR 104 (Dunn Avenue), where the freeway then turns east, with interchanges at SR 115, International Airport Boulevard/Duval Road, and I-95 just south of the Jacksonville International Airport, where the West Beltway ends and the East Beltway begins.

I-295 at the Buckman Bridge

East of the I-95 interchange near the airport, I-295 continues east as the East Beltway, with the next interchange being US 17. I-295 starts to curve to the southeast, with interchanges at Pulaski Road, Alta Drive/Yellowbluff Road, before orienting itself southward at the SR 105 (Zoo Parkway/Heckscher Drive) in the Fort Caroline area. The freeway then crosses the Dames Point Bridge over the St. Johns River, before continuing south towards more remote areas of the highway. Just south of the bridge, it has a partial interchange with SR 113 (Southside Connector), followed by full interchanges with Merrill Road and Monument Road, providing access to NS Mayport. Continuing south, it has full interchanges with SR 10 (Atlantic Boulevard), St. Johns Bluff Road, US 90/SR 212 (Beach Boulevard) and Town Center Parkway/University of North Florida Drive. The next interchange, J. Turner Butler Boulevard is a freeway to freeway interchange and the last completed interchange on I-295 to date, finished in 2008. After interchanges with Gate Parkway and SR 152 (Baymeadows Road) and a planned interchange with the future SR 9B, I-295 curves to the west, it crosses US 1 before completing the loop at I-95 in south Jacksonville.[3]

History

The current version of I-295 appeared on maps in 1967, as a loop around central Jacksonville, with the first section between I-95 in south Duval County to SR 134 (exit 16) in 1970, and the section from SR 134 to I-10 opened in 1973. The section from I-10 to Commonwealth Ave. (exit 22) opened in 1975, followed by the extension to I-95 in north Jacksonville in 1977, completing the western section of the loop.[4]

I-295 northbound at the Dames Point Bridge

The eastern section, formerly signed as SR 9A, had its first section open from I-95 in north Jacksonville to US 17 (exit 36) in 1983. The eastern half of the loop was constructed initially as a Super 2 highway with traffic lights in the late 1980s, and was not up to interstate standards. The Dames Point Bridge was signed as I-295 in 1990, but this designation was removed in 1993 and replaced by SR 9A. The final sections of SR 9A were completed in 2006, creating a complete loop around central Jacksonville. Several sections not under interstate compliance were upgraded, and the route was considered interstate ready in 2009.

The I-295 East Beltway (formerly signed as SR 9A) was designated the Ronald Reagan Memorial Highway in a Florida Department of Transportation ceremony on August 27, 2009. After the Federal Highway Administration accepted the road as the eastern loop of Interstate 295 in 2010, the state was no longer able to name the highway.[5]

Improvements to the I-95 interchange north close by the airport were under construction, new lanes and a flyover ramp were constructed to help improve the interchange. This was completed in late September 2010.[citation needed]

On December 4, 2011, the two halves of the Jacksonville beltway changed over to their current designations, the West Beltway (formerly the whole of I-295), and the East Beltway (formerly State Road 9A). The East Beltway was officially given the I-295 designation, making the entire beltway I-295, with State Road 9A remaining the hidden designation for the entire beltway for FDOT purposes.[6]

Sniper incident

In 1992, a series of sniper shootings and concrete block and brick throwing attacks occurred on Interstate 295 (currently the West Beltway), resulting in the death of one motorist, William Klinedinst, after a concrete block landed on the hood of his moving car, causing it to crash. Another motorist, Debra Lewis, received a bullet wound to the face, and several other injuries occurred.[7] The incidents spurred then-governor Lawton Chiles to dispatch the Florida National Guard to patrol the roadway and the American Automobile Association (AAA) to issue a rare travel warning for the interstate and direct its customers to avoid its use.[8] A task force was set up by the Jacksonville Sheriff's Office (JSO) to investigate the incidents and, though charges were filed, they were eventually dropped. The task force was disbanded at the end of 1992 and the incidents remained unsolved to this day.[7]

Future

Southbound on I-295 East Beltway at the future interchange with SR 9B in southeastern Jacksonville

Extending from the southeast corner of the loop is planned to be Interstate 795 (SR 9B), an approximately 11-mile (18 km) expressway. In May 2008, the SR 9B project was suspended by the Florida Department of Transportation. The project was reinstated in 2009, and construction of phase one began in June 2010 with completion set for Spring 2013. Construction of phase two, which will extend SR 9B to I-95, started in May 2013 and will finish in Summer 2016. After phase two is completed, SR 9B will be renamed Interstate 795.

In February 2011, construction began for a new interchange at Collins Road, just west of the congested Blanding Boulevard exit. The $63.4 million project is expected to be complete in 2014.[9]

Exit list

The entire route is in Jacksonville, Duval County.

mikmExit[1]DestinationsNotes
0.0000.00061 I-95 – Daytona Beach, JacksonvilleSigned as exits 61A (south) and 61B (north)
2.8884.6483Old St. Augustine Road
4.6897.5465 SR 13 (San Jose Boulevard)Signed as exits 5A (north) and 5B (south)
5.109–
9.000
8.222–
14.484
Buckman Bridge over the St. Johns River
9.41615.15410 US 17 / SR 15 (Roosevelt Boulevard / Park Avenue)Naval Air Station Jacksonville
11.52218.54312 SR 21 (Blanding Boulevard)Orange Park Mall
12.61220.29713Collins RoadFuture interchange
15.73825.32816 SR 134 (103rd Street)
17.26027.77717 SR 208 (Wilson Boulevard)
19.22430.93819 SR 228 (Normandy Boulevard)
20.43432.88521 I-10 – Jacksonville, Lake CitySigned as exits 21A (east) and 21B (west)
22.01835.43522Commonwealth Avenue
24.52439.46825Pritchard Road
27.48144.22628 US 1 / US 23 (New Kings Road) – CallahanSigned as exit 28A (south) and 28B (north)
29.81647.98430 SR 104 (Dunn Avenue)
31.46650.64032 SR 115 (Lem Turner Road)
33.12753.31333International Airport Boulevard / Duval Road
34.88456.14035 I-95 – Jacksonville, Jacksonville International Airport, SavannahSigned as exits 35A (south) and 35B (north); River City Marketplace
35.70557.46236 US 17 (North Main Street)
37.25259.95137Pulaski Road
39.53163.61940Alta Drive
41.30266.46941 SR 105 (Heckscher Drive / Zoo Parkway)
42.602–
44.708
68.561–
71.951
Dames Point Bridge over the St. Johns River
45.17072.69445 SR 113 (Southside Connector) / SR 116 (Merrill Road east)Southbound exit, northbound entrance
45.58873.36746 SR 116 (Merrill Road) – Jacksonville UniversitySR 116 via Merrill Road east only; signed southbound as Merrill Road west
46.72775.20047Monument Road – Naval Station Mayport
48.18377.54348 SR 10 (Atlantic Boulevard) – Florida State College at Jacksonville South Campus
48.74978.45449St. Johns Bluff RoadNorthbound exit, southbound entrance
50.77781.71851 US 90 (Beach Boulevard)
52.05383.77152Town Center Parkway / University of North Florida Drive
53.15785.54853 SR 202 (J. Turner Butler Boulevard) – Jacksonville Beaches
54.33687.44555Gate Parkway
55.71989.67156 SR 152 (Baymeadows Road)
57.65392.78458 SR 9B / Future I-795Future interchange; southbound exit, northbound entrance
60.03896.62260 US 1 (Philips Highway)Module:Jct warning: "road" parameter is deprecatedAvenues Mall
60.86497.95161 I-95 – Daytona Beach, JacksonvilleSigned as exits 61A (south) and 61B (north)
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

  1. ^ a b "Florida Department of Transportation Interchange Report" (PDF). Florida Department of Transportation. August 4, 2010. pp. 10, 22. Retrieved October 8, 2010.
  2. ^ Florida Official Transportation Map (PDF) (Map). Florida Department of Transportation. 2010. Retrieved November 6, 2010.
  3. ^ Google (June 10, 2012). "Interstate 295 (Florida)" (Map). Google Maps. Google. Retrieved June 10, 2012.
  4. ^ Historic Florida Interstate Information
  5. ^ Hannan, Larry: "Jacksonville's 9A now Ronald Reagan Memorial Highway" Florida Times-Union, August 26, 2009.
  6. ^ "I-295, SR 9A Getting $1.3 Million Name Change" First Coast News, December 2nd, 2011.
  7. ^ a b "Scars of I-295". Retrieved April 16, 2008.
  8. ^ Rohter, Larry (November 7, 1992). "Florida Guard to Patrol Highway to Halt Attacks". The New York Times. Retrieved April 16, 2008.
  9. ^ Hannan, Larry (June 16, 2010). "New interchange expected to ease congestion at Blanding and I-295". The Florida Times Union. Retrieved September 1, 2010.
KML is from Wikidata