Jump to content

Main Southern railway line, New South Wales: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
m Reverted edits by Robert_39201 (talk) (HG) (3.1.20)
Rescuing 1 sources and tagging 0 as dead. #IABot (v1.2.7.1)
Line 27: Line 27:
The original single track was duplicated from [[Granville railway station|Granville]] to [[Liverpool railway station|Liverpool]] in 1857,<ref name="LiverpoolHeritage">{{cite web|url=http://www.environment.nsw.gov.au/heritageapp/ViewHeritageItemDetails.aspx?ID=4803255|title=Liverpool Railway Precinct|publisher=Department of Environment and Heritage}}</ref> to Campbelltown in 1891,<ref>{{cite web|url=http://www.environment.nsw.gov.au/heritageapp/ViewHeritageItemDetails.aspx?ID=4801083|title=Campbelltown Railway Precinct|publisher=Department of Environment and Heritage}}</ref> to Picton in 1892.<ref>{{cite web|url=http://www.environment.nsw.gov.au/heritageapp/ViewHeritageItemDetails.aspx?ID=4806271|title=Picton Railway Precinct|publisher=Department of Environment and Heritage}}</ref> Between 1913 and 1922 the {{convert|343|km|mi|abbr=on}} section from [[Picton railway station|Picton]] to [[Cootamundra railway station|Cootamundra]] was duplicated.<ref>{{cite web|url=http://www.environment.nsw.gov.au/heritageapp/visit/ViewAttractionDetail.aspx?ID=5012023|title=Goulburn Viaduct (Mulwaree Ponds)|publisher=Heritage Council of New South Wales}}</ref> At the same time, the section between Picton and Mittagong was deviated by a less direct route in 1919 to ease the steep grades of the original alignment, and the old line became known as the [[Picton – Mittagong loop railway line]] which is now largely closed. (The Main Southern Railway Deviation, was estimated in the 1914 Act of Parliament to have construction costs of £630,353).<ref>{{Cite Legislation AU|NSW|num_act|msrdtma1914n25566|Main Southern Railway Deviation - Picton to Mittagong Act 1899}}</ref> Other sections of the original Whitton alignment between Goulburn and Wagga Wagga were also replaced by more curvy sections with lower grades. The section from Cootamundra to Junee, including a [[Bethungra Spiral (railway)|rail spiral at Bethungra]], was duplicated between 1941 and 1945.<ref>{{cite web|url=http://www.environment.nsw.gov.au/heritageapp/ViewHeritageItemDetails.aspx?ID=4806760|title=Picton Railway Precinct|publisher=Department of Environment and Heritage}}</ref><ref>{{cite web|url=http://www.environment.nsw.gov.au/heritageapp/visit/ViewAttractionDetail.aspx?ID=5011929|title=Bethungra Spiral|publisher=Heritage Council of New South Wales}}</ref>
The original single track was duplicated from [[Granville railway station|Granville]] to [[Liverpool railway station|Liverpool]] in 1857,<ref name="LiverpoolHeritage">{{cite web|url=http://www.environment.nsw.gov.au/heritageapp/ViewHeritageItemDetails.aspx?ID=4803255|title=Liverpool Railway Precinct|publisher=Department of Environment and Heritage}}</ref> to Campbelltown in 1891,<ref>{{cite web|url=http://www.environment.nsw.gov.au/heritageapp/ViewHeritageItemDetails.aspx?ID=4801083|title=Campbelltown Railway Precinct|publisher=Department of Environment and Heritage}}</ref> to Picton in 1892.<ref>{{cite web|url=http://www.environment.nsw.gov.au/heritageapp/ViewHeritageItemDetails.aspx?ID=4806271|title=Picton Railway Precinct|publisher=Department of Environment and Heritage}}</ref> Between 1913 and 1922 the {{convert|343|km|mi|abbr=on}} section from [[Picton railway station|Picton]] to [[Cootamundra railway station|Cootamundra]] was duplicated.<ref>{{cite web|url=http://www.environment.nsw.gov.au/heritageapp/visit/ViewAttractionDetail.aspx?ID=5012023|title=Goulburn Viaduct (Mulwaree Ponds)|publisher=Heritage Council of New South Wales}}</ref> At the same time, the section between Picton and Mittagong was deviated by a less direct route in 1919 to ease the steep grades of the original alignment, and the old line became known as the [[Picton – Mittagong loop railway line]] which is now largely closed. (The Main Southern Railway Deviation, was estimated in the 1914 Act of Parliament to have construction costs of £630,353).<ref>{{Cite Legislation AU|NSW|num_act|msrdtma1914n25566|Main Southern Railway Deviation - Picton to Mittagong Act 1899}}</ref> Other sections of the original Whitton alignment between Goulburn and Wagga Wagga were also replaced by more curvy sections with lower grades. The section from Cootamundra to Junee, including a [[Bethungra Spiral (railway)|rail spiral at Bethungra]], was duplicated between 1941 and 1945.<ref>{{cite web|url=http://www.environment.nsw.gov.au/heritageapp/ViewHeritageItemDetails.aspx?ID=4806760|title=Picton Railway Precinct|publisher=Department of Environment and Heritage}}</ref><ref>{{cite web|url=http://www.environment.nsw.gov.au/heritageapp/visit/ViewAttractionDetail.aspx?ID=5011929|title=Bethungra Spiral|publisher=Heritage Council of New South Wales}}</ref>


Construction of a standard gauge track parallel with the broad gauge track from Albury to Melbourne commenced in 1959, completing the [[Sydney–Melbourne railway]].<ref name=vicrail.net>{{cite web|title=VR timeline|work=Victorian Railways|publisher=Mark Bau|url=http://www.victorianrailways.net/vr%20history/history.html|accessdate=2008-04-08}}</ref> The first freight train operated on the line on 3 January 1962, followed by the first passenger train on 16 April 1962.<ref name=vicrail.net/>
Construction of a standard gauge track parallel with the broad gauge track from Albury to Melbourne commenced in 1959, completing the [[Sydney–Melbourne railway]].<ref name=vicrail.net>{{cite web|title=VR timeline |work=Victorian Railways |publisher=Mark Bau |url=http://www.victorianrailways.net/vr%20history/history.html |accessdate=2008-04-08 |deadurl=yes |archiveurl=https://web.archive.org/web/20080530050949/http://www.victorianrailways.net/vr%20history/history.html |archivedate=30 May 2008 |df=dmy }}</ref> The first freight train operated on the line on 3 January 1962, followed by the first passenger train on 16 April 1962.<ref name=vicrail.net/>


The original [[wrought iron]] [[Murrumbidgee River Railway Bridge]] at [[Wagga Wagga]] was replaced in 2007 by a new concrete and steel bridge.<ref>{{cite web|publisher=[[Engineers Australia|Institution of Engineers]]|work=Railway Lattice Bridge and Viaducts|title=Wagga Wagga|url =http://sydney.ieaust.org.au/heritage/PDFs/Railway%20Wagga.pm.pdf | format=pdf | accessdate=30 January 2007 }}{{dead link|date=September 2016|bot=medic}}{{cbignore|bot=medic}}</ref><ref>{{cite web|publisher=[[National Trust of Australia]]|work=Endangered Places | title=Iron Lattice Girder Railway Bridges | url =http://www.nationaltrust.org.au/pdfs/0305.pdf|format=pdf|accessdate=30 January 2007 |archiveurl=https://web.archive.org/web/20061008112319/http://www.nationaltrust.org.au/pdfs/0305.pdf|archivedate=8 October 2006}}</ref>
The original [[wrought iron]] [[Murrumbidgee River Railway Bridge]] at [[Wagga Wagga]] was replaced in 2007 by a new concrete and steel bridge.<ref>{{cite web|publisher=[[Engineers Australia|Institution of Engineers]]|work=Railway Lattice Bridge and Viaducts|title=Wagga Wagga|url =http://sydney.ieaust.org.au/heritage/PDFs/Railway%20Wagga.pm.pdf | format=pdf | accessdate=30 January 2007 }}{{dead link|date=September 2016|bot=medic}}{{cbignore|bot=medic}}</ref><ref>{{cite web|publisher=[[National Trust of Australia]]|work=Endangered Places | title=Iron Lattice Girder Railway Bridges | url =http://www.nationaltrust.org.au/pdfs/0305.pdf|format=pdf|accessdate=30 January 2007 |archiveurl=https://web.archive.org/web/20061008112319/http://www.nationaltrust.org.au/pdfs/0305.pdf|archivedate=8 October 2006}}</ref>

Revision as of 17:33, 31 December 2016

Main Southern Line
New Binalong railway station on 1916 deviation
Technical
Track gauge1,435 mm (4 ft 8+12 in)
Route map
Template:Infobox route diagram

The Main Southern Railway is a major railway in New South Wales, Australia. It runs through the Southern Highlands, Southern Tablelands, South West Slopes and the Riverina regions.

Description of route

The Main Southern Railway commences as an electrified pair of tracks in the Sydney metropolitan area. Originally the line branched from the Main Suburban railway line at Granville, passing through Fairfield and Cabramatta to Liverpool. However this section was later bypassed with a more direct route from Lidcombe via Regents Park to Cabramatta. The former route through Fairfield became known as the Old Main South. From Liverpool, the line heads into Campbelltown and Macarthur, the current limit of electrification and suburban passenger services. The electrification previously extended to Glenlee colliery, but this was removed following the cessation of electric haulage of freight trains in the 1990s.

The line continues as a double non-electrified track south through the Southern Highlands towns of Mittagong and Goulburn to Junee on the Southern Plains. Here the line becomes single track for the remainder of its journey south to the state border with Victoria at Albury. The North East railway line then continues through northern Victoria to Melbourne.

The line north of Macarthur is maintained by RailCorp. South of Macarthur the line is leased to the Australian Rail Track Corporation until 2064.[1][2]

Development of the line

On 26 September 1855 the first railway in New South Wales, the Sydney–Granville railway opened. Exactly a year later, a branch was opened from what was known as Parramatta Junction (the present day Granville) to Liverpool. This line was extended to Campbelltown in 1858, Picton in 1863, Mittagong in 1867, Marulan in 1868, Goulburn in 1869, Yass Junction in 1876, Galong, Harden-Murrumburrah and Cootamundra in 1877 and Junee and Bomen (on the north bank of the Murrumbidgee River) in 1878. The Murrumbidgee River Railway Bridge was completed in 1881[3] and the line was extended to Wagga Wagga, Uranquinty, The Rock, Henty and Albury in 1881.[4][5] Victorian Railways' North East 1,600 mm (5 ft 3 in) gauge line was extended from Wodonga to Albury station in 1883.[6] To accommodate the break of gauge, a very long railway platform was built, the covered platform being one of the longest in Australia.

The original alignment was built under the supervision of John Whitton, Engineer-in-Charge for the New South Wales Railways from 1856 to 1898.[7]

The original single track was duplicated from Granville to Liverpool in 1857,[8] to Campbelltown in 1891,[9] to Picton in 1892.[10] Between 1913 and 1922 the 343 km (213 mi) section from Picton to Cootamundra was duplicated.[11] At the same time, the section between Picton and Mittagong was deviated by a less direct route in 1919 to ease the steep grades of the original alignment, and the old line became known as the Picton – Mittagong loop railway line which is now largely closed. (The Main Southern Railway Deviation, was estimated in the 1914 Act of Parliament to have construction costs of £630,353).[12] Other sections of the original Whitton alignment between Goulburn and Wagga Wagga were also replaced by more curvy sections with lower grades. The section from Cootamundra to Junee, including a rail spiral at Bethungra, was duplicated between 1941 and 1945.[13][14]

Construction of a standard gauge track parallel with the broad gauge track from Albury to Melbourne commenced in 1959, completing the Sydney–Melbourne railway.[15] The first freight train operated on the line on 3 January 1962, followed by the first passenger train on 16 April 1962.[15]

The original wrought iron Murrumbidgee River Railway Bridge at Wagga Wagga was replaced in 2007 by a new concrete and steel bridge.[16][17]

The main line south of Junee was substantially upgraded in 2007 and 2008, including the construction of passing loops up to 7 kilometres (4.3 mi)*.[18]

Redbank Tunnel near Tahmoor closed on 30 November 2012 when replaced by a deviation funded by Xstrata to allow expansion of its Tahmoor Colliery under the tunnel which was sealed.[19][20]

In January 2013 the Australian Rail Track Corporation opened the Southern Sydney Freight Line between Sefton and Macarthur as a dedicated line for freight services.

Branches

The Rock station
Cootamundra station
Binalong station and telegraph office

Several lines branched from the Main South, some of which are closed either fully or in part:

Passenger services

Albury station looking south with the standard gauge platform on the left, former broad gauge platform on the right

Commuter services

Electric commuter passenger trains operate between Sydney and Macarthur as part of the T2. Diesel railcars operate south from Campbelltown to Goulburn on an irregular frequency as part of the Southern Highlands Line.

Country services

Prior to 1962 travelling south of Albury into Victoria required a change of trains (due to gauge differences between NSW and Victoria) and often an overnight stay. From March 1956 a daylight connection was introduced between Sydney and Melbourne whereby a train from Sydney connected at Albury with a train to Melbourne and vice versa. In 1962 the railway south of Albury was converted to standard gauge, allowing through operation of trains between Sydney and Melbourne. Between April 1962 and August 1991, the Main South was served by the Intercapital Daylight, a locomotive hauled limited stop passenger train. It was operated jointly by the New South Wales Government Railways and the Victorian Railways with the former's air-conditioned rolling stock. Two overnight services also ran, the limited stops Southern Aurora and the Spirit of Progress. Until 1982 locomotives were exchanged at Albury for a locomotive of the respective state that the train was entering.

The South Mail operated overnight between Sydney and Albury until it ceased in June 1985. In August 1986 the Southern Aurora and the Spirit of Progress were merged into the Sydney/Melbourne Express. In August 1991, airline deregulation and falling patronage saw the Intercapital Daylight replaced by a coach service between Melbourne and Albury, connecting with the Riverina XPT at Albury. In November 1993 the delivery of additional XPT rollingstock saw the introduction of a through overnight XPT service between Sydney and Melbourne, replacing the Sydney/Melbourne Express, and the Riverina XPT extended to Melbourne from December 1994.[50]

As at December 2014, NSW TrainLink services operated on the Main South line were:[51]

  • Sydney to Canberra - 3 in each direction per day
  • Sydney to Griffith - 1 in each direction per week
  • Sydney to Melbourne - 2 in each direction per day

See also

References

  1. ^ Memorandum between The Commonwealth of Australia & The State of New South Wales & Australian Rail Track Corporation Limited Australian Rail Track Corporation
  2. ^ The Agreement in Summary Australian Rail Track Corporation
  3. ^ "Murrumbidgee River Rail Bridge, Wagga Wagga, NSW (Place ID 15910)". Australian Heritage Database. Australian Government. Retrieved 30 January 2007.
  4. ^ "Albury Railway Precinct". Department of Environment and Heritage.
  5. ^ "Main South Line". www.nswrail.net. Retrieved 16 April 2008.
  6. ^ T. Richards (1883). The Union of the railway systems of New South Wales and Victoria : celebration at Albury on the 14th June, 1883. New South Wales Government.
  7. ^ C. C. Singleton. "Whitton, John (1820–1898)". Australian Dictionary of Biography. National Centre of Biography, Australian National University.
  8. ^ "Liverpool Railway Precinct". Department of Environment and Heritage.
  9. ^ "Campbelltown Railway Precinct". Department of Environment and Heritage.
  10. ^ "Picton Railway Precinct". Department of Environment and Heritage.
  11. ^ "Goulburn Viaduct (Mulwaree Ponds)". Heritage Council of New South Wales.
  12. ^ Main Southern Railway Deviation - Picton to Mittagong Act 1899 (NSW)
  13. ^ "Picton Railway Precinct". Department of Environment and Heritage.
  14. ^ "Bethungra Spiral". Heritage Council of New South Wales.
  15. ^ a b "VR timeline". Victorian Railways. Mark Bau. Archived from the original on 30 May 2008. Retrieved 2008-04-08. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  16. ^ "Wagga Wagga" (pdf). Railway Lattice Bridge and Viaducts. Institution of Engineers. Retrieved 30 January 2007.[dead link]
  17. ^ "Iron Lattice Girder Railway Bridges" (PDF). Endangered Places. National Trust of Australia. Archived from the original (pdf) on 8 October 2006. Retrieved 30 January 2007.
  18. ^ "Main rail line to get better passing loops". Border Mail. 10 June 2007.
  19. ^ "Rail tunnel will soon be history". Wollondilly Advertiser. 15 January 2013.
  20. ^ "Signaling & Infastructure" Railway Digest February 2013 page 51
  21. ^ "Bombala Line". www.nswrail.net. Retrieved 11 December 2006.
  22. ^ "Canberra Branch". www.nswrail.net. Retrieved 11 December 2006.
  23. ^ "Captains Flat Branch". www.nswrail.net. Retrieved 11 December 2006.
  24. ^ "Crookwell Branch". www.nswrail.net. Retrieved 11 December 2006.
  25. ^ "Taralga Branch". www.nswrail.net. Retrieved 11 December 2006.
  26. ^ "Yass Branch". www.nswrail.net. Retrieved 12 December 2006.
  27. ^ "Goondah–Burrinjuck Line". www.nswrail.net. Retrieved 12 December 2006.
  28. ^ "Boorowa Branch". www.nswrail.net. Retrieved 11 December 2006.
  29. ^ "Vale Boorowa" Railway Digest" December 1987 page 392
  30. ^ Date, Ken; Dominik Giemza (December 2006). "Southern Semaphore Swansong". Railway Digest. 44 (12). Australian Railway Historical Society NSW Div.
  31. ^ "Blayney – Demondrille Line". www.nswrail.net. Retrieved 11 December 2006.
  32. ^ "Grenfell Branch". www.nswrail.net. Retrieved 11 December 2006.
  33. ^ "Eugowra Branch". www.nswrail.net. Retrieved 11 December 2006.
  34. ^ "Lake Cargelligo Branch". www.nswrail.net. Retrieved 11 December 2006.
  35. ^ "Stockinbingal – Parkes Line". www.nswrail.net. Retrieved 11 December 2006.
  36. ^ "Temora – Roto Line". www.nswrail.net. Retrieved 11 December 2006.
  37. ^ "Rankins Springs Branch". www.nswrail.net. Retrieved 11 December 2006.
  38. ^ "Tumut Branch". www.nswrail.net. Retrieved 11 December 2006.
  39. ^ "Kunama Branch". www.nswrail.net. Retrieved 11 December 2006.
  40. ^ "Hay Branch". www.nswrail.net. Retrieved 11 December 2006.
  41. ^ "Tocumwal Branch". www.nswrail.net. Retrieved 11 December 2006.
  42. ^ "Yanco – Griffith Line". www.nswrail.net. Retrieved 11 December 2006.
  43. ^ "Tumbarumba Branch". www.nswrail.net. Retrieved 11 December 2006.
  44. ^ "Kywong Branch". www.nswrail.net. Retrieved 11 December 2006.
  45. ^ "Oaklands Branch". www.nswrail.net. Retrieved 11 December 2006.
  46. ^ "Westby Branch". www.nswrail.net. Retrieved 11 December 2006.
  47. ^ "Rand Branch". www.nswrail.net. Retrieved 11 December 2006.
  48. ^ "Corowa Branch". www.nswrail.net. Retrieved 11 December 2006.
  49. ^ "Holbrook Branch". www.nswrail.net. Retrieved 11 December 2006.
  50. ^ Banger, C. The Intercapital Daylight, 1956–1991 Australian Railway Historical Society Bulletin June 2001
  51. ^ "Southern timetable". NSW TrainLink. 7 September 2019.