Jump to content

Boeing 787 Dreamliner

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Bjarki S (talk | contribs) at 18:05, 27 February 2005 (link to composite material). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

File:Boeing 7E7 New.JPG
Boeing 787 in new Boeing colors

The Boeing 787, or Dreamliner, is a mid-sized passenger airliner currently under development by Boeing Commercial Airplanes (BCA) and scheduled to enter service in 2008. It will carry between 200 and 350 passengers depending on the seating configuration, and be more fuel-efficient than earlier airliners. In addition, it is the first major airliner to use composite material in the majority of its construction.

The 787 was known as the 7E7 (a pre-development designator) prior to January 282005.[1]

Background

File:Boeing sonic.jpg
The Sonic Cruiser would have replaced the 767. Instead, Boeing chose a somewhat more conservative route, although the 787 will still contain many advanced features.

When 767 sales began to go the way of the Airbus A330-200 in the late 1990s, Boeing began to consider replacement aircraft. As the 747-400 was also beginning to lose traction, the company began to consider two new projects—the Boeing Sonic Cruiser and the 747X. The Sonic Cruiser was intended to achieve higher speeds (approximately Mach 0.98) while burning fuel at the same rate as the existing 767 and A330-200 products. The 747X would stretch the 747-400 and give it a composite supercritical wing to improve efficiency.

Market interest for the 747X was tepid; the Sonic Cruiser faced much brighter prospects. Several major airlines, primarily in the United States, voiced their optimism for the concept. By decreasing travel time, they would be able to increase customer satisfaction and aircraft utilization.

When the September 11, 2001 attacks occurred, the global airline market was upended. The worst-affected airlines were in the United States—those same airlines were the primary proponents of the Sonic Cruiser. Airlines were not able to justify large capital expenditures, and due to increased petroleum prices, were more interested in efficiency than speed. Boeing proceeded to offer airlines the option of using the airframe for either higher speed or increased efficiency. Due to high projected airframe costs, demand continued to evaporate. Eventually, Boeing switched tacks and decided to offer an alternative project, at the same time cancelling the 747X.

The replacement for the Sonic Cruiser project was dubbed the 7E7. The "E" was said to stand for various things, depending upon the audience. To some, it stood for "efficiency," to others it stood for "environmentally friendly," etc. In the end, Boeing claimed it merely stood for "Eight," after the aircraft was eventually rechristened "787" when several Chinese airlines ordered the product.

The 787 essentially uses the technology proposed for the Sonic Cruiser in a more conventional airframe configuration (see #Features). Boeing claims that the 787 will be up to 20% more fuel-efficient than comparable aircraft. This efficiency improvement will come primarily from the engines; the airframe weight saving due to high usage of composite materials will provide the rest. The 787 will also have advanced systems; for example, signals will be carried around the aircraft using a version of Ethernet, and the brakes will be electrically rather than hydraulically controlled, pushing towards the industry goal of a 'more electric aircraft'.

On December 16, 2003, Boeing announced assembly would take place in Everett, Washington, employing 800 to 1,200 people.

On April 6, 2004, Boeing announced that it had selected two engine types, the General Electric(GE) GEnx and Rolls-Royce Trent 1000 to power the 787. Significantly, this leaves Pratt & Whitney unable to offer one of their own engines to 787 customers. Boeing may have wished to rely on two evolved versions of existing engines rather than the higher-risk option of an all new Pratt & Whitney engine, particularly in light of Pratt & Whitney's recent failures in the Regional Jet market and failed PW8000 engine for the A318.

For the first time in commercial aviation, both engine types will have a standard interface with the aircraft, allowing any 787 to be fitted with either a GE or Rolls-Royce engine at any point in time. Engine interchangeability makes the 787 a far more flexible asset to airlines, allowing them to change from one manufacturer's engine to the other's in light of any future engine developments which conform more closely to their operating profile. The engine market for the 787 is estimated $40 billion USD over the next 25 years.

Any commercial launch of a new airliner can be expected to draw scathing comments from competitors, Boeing's doubt over the A380 and Airbus' mocking of the Sonic Cruiser are recent examples. The 787 is no exception, as Airbus' John Leahy has made attempts at refuting all of the claims that Boeing have made for the aircraft. Airbus is of course in no position to start development of a comparable plane, with the ongoing development of the A380, however Airbus might not be in such a dangerous position as they appear. Airbus is now offering a reduced weight A330 with the 787's next generation turbofans (modified to generate bleed air as with the proposed 747 Advanced). Although this proposed new jet, renamed the A350, lacks the 787's widespread use of composites and advanced systems, Airbus still claims it will almost match the 787's performance and reduced operating costs.

Commercial launch

On April 26, 2004, the Japanese airline All Nippon Airways (ANA) became the launch customer for the 787, then still-known as the 7E7, announcing a firm order for 50 aircraft to be delivered beginning in 2008. The order is valued at roughly $6 billion and represents the largest ever single launch order for a new Boeing jetliner, as well as illustrating market acceptance of the concept.

ANA will buy thirty 787-3, 300-seat, one-class aircraft for the domestic market, and twenty 787-8, long-haul, 230-seat, two-class aircraft for international routes such as Tokyo Narita-Los Angeles. The aircraft will allow new routes to be opened to minor cities not previously served, such as to Denver.

On June 28, 2004, Air New Zealand (ANZ) became the second 787 customer, announcing a firm order for two aircraft and options on 16 more. This unusual arrangement was likely precipitated by ANZ's perception that they needed to secure their delivery slots, far in advance. The aircraft will be used to develop new international routes and increase frequency on existing routes. ANZ was the first airline to announce which powerplant would power their aircraft, selecting the Trent in June 2004.

Blue Panorama of Italy and First Choice Airways of the United Kingdom placed orders for four and six examples, respectively, of the 787-8 on July 7, 2004. Primaris Airlines (run by several prominent industry veterans), which caters to business customers in the same vein as Switzerland's PrivatAir, placed an order on October 21, 2004 for 20 787s and options for 15 more. The Primaris order represents the first American customer for the aircraft. On December 22, 2004, Japan Airlines ordered 30 787's with 20 options for close to $4 billion, and on December 29 of the same year, Continental announced an order for 10 787 airframes.

On December 31, 2004, Vietnam Airlines became the eighth airline to signal its intent to buy the 787, with an order for four jets. This was followed on January 28, 2005 with an order from China Aviation Supplies Import & Export Corporation for 60 787s, which will be distributed among six Chinese state-owned airlines. First deliveries are expected to commence in prior to the 2008 Summer Olympics in Peking.

Date Airline EIS Type Engine
787-3 787-8 787-9 Unknown Options
April 26 2004 All Nippon Airways 2008 30 20     50 Trent 1000
June 2 2004 Air New Zealand 2008       2 16 Trent 1000
July 7 2004 File:Uk flag large.png First Choice Airways 2009   6       GEnx
July 7 2004 File:Italy flag large.png Blue Panorama 2009   4        
October 21 2004 File:Us flag large.png Primaris Airlines 2010       20 15  
December 22 2004 Japan Airlines 2008       30 20  
December 29 2004 File:Us flag large.png Continental Airlines 2009   10        
December 31 2004 File:Vietnam flag large.png Vietnam Airlines 2010   4        
January 28, 2005 File:China flag large.png Air China 2008       TBD    
January 28, 2005 File:China flag large.png China Eastern 2008       15    
January 28, 2005 File:China flag large.png China Southern 2008       13    
January 28, 2005 File:China flag large.png Hainan Airlines 2008       8    
January 28, 2005 File:China flag large.png Shanghai Airlines 2008       TBD    
January 28, 2005 File:China flag large.png Xiamen Airlines 2008       TBD    
February 4, 2005 File:Ethiopia flag large.png Ethiopian Airlines 2008       5 5  
February 25, 2005 File:Iceland flag large.png Icelandair 2010   2        
Total 193 106+  

Customer announced orders and commitments for the 787 now total 191 airplanes, including 56 under firm contract. Boeing is holding unannounced commitments for another 59 aircraft.[2] This makes the 787 the fastest-ever selling Boeing airliner upon launch; the 747 sold 85 units during the same period. Negotiations remain underway with a number of key airlines worldwide. They expect to have 500 orders by entry into service (EIS).

The 787-3 and 787-8 variants will be available first. The 787-9 was expected to be available two years later, but the first 2.5 years production has now been sold out for the initial variants, so the introduction of the 787-9 has been delayed in order to fulfill initial demand.

The 787-8 variant was priced at a list price of $120 million per aircraft, surprising the industry, who were expecting a much higher price tag. Launch customer ANA is rumored to have received a 50 percent discount, though that may never be easily confirmed.

Japanese and other foreign program partners

It also underscores the importance of Japanese industrial participation (35 percent workshare with Boeing itself holding 35 percent) with most of the subcontractors fully supported and funded by the Japanese government. The Japanese participants are no longer junior partners.

Boeing will assemble the aircraft and manufacture its forward fuselage, tail fin, ailerons, flaps, and slats. For its entire history, Boeing has jealously guarded its techniques for designing and mass producing commercial jetliner wings. Due to economic realities, the wings will be manufactured by Japanese companies in Nagoya, while most of the fuselage and the horizontal stabilizers will be manufactured by Vought/Alenia in North Charleston, South Carolina. Many of the foreign companies which will be contributing to the 787 will be producing their structures at their American facilities.

Messier-Dowty will build the undercarriage. This highlights the French participation in the Boeing program, partially as an industrial offset for Air France launch of the Boeing 777-300ER. Honeywell and Rockwell-Collins will provide flight control, guidence and other Avionics systems. The 787 will be the first aircraft in history with standard "dual" head up guidence systems. Future integration of forward looking infrafred is being looked at by Flight Dynamics allowing improved visibility using thermal sensing as part of the HUD system allowing pilots to "see" through the clouds.

The final assembly will consist of attaching fully-completed subassemblies, instead of building the complete aircraft from the ground up. This is a technique which Boeing has previously used on the 737 program, which involves airlifting fuselage barrel sections from Boeing's Wichita, Kansas facility to their final assembly plant at Renton, Washington. Airbus has also used this technique in the past, which in their case is more a political necessity as a result of having to divide workshare between partner nations.

The 787 will undergo wind-tunnel testing at Boeing's Transonic Wind Tunnel, QinetiQ's 5-metre wind tunnel based in Farnborough, UK, and NASA Ames Research Center's wind tunnel, as well as at the French aerodynamics research agency, ONERA.

The first composite section rolled out in January of 2005, and final design is due between March and April of 2005.

Features

  • Twin aisle seating.
  • Cruise speed: 0.85 Mach (903 km/h or 561 mph at altitude)
  • Range of 8,500 nautical miles (15,700 km), enough to cover the Los Angeles to London or New York to Tokyo routes.
  • Construction materials (by weight): 61 percent composite, 20 percent aluminum, 11 percent titanium, 8 percent steel. Composite materials are significantly lighter and stronger than traditional aircraft materials, making the 787 a very light aircraft for its capabilities. By volume, the 787 will be 80 percent composite.
  • The 787 production line will be able to finish an aircraft in as little as three days, compared to 11 days for the 737.
  • Larger windows than any other civil air transport, with a higher eye level, so passengers can see the horizon, with liquid crystal display (LCD)-based "auto-dimming" to reduce cabin glare and maintain transparency.
  • Light-emitting diode (LED) cabin lighting will be used instead of fluorescent tubes.
  • Cabin air provided by electrically driven compressors (no engine bleed air).
  • A version of Ethernet (AFDX) will be used to transmit data between the flight deck and aircraft systems.
  • Bleedless turbofans, allowing elimination of superheated air conduits normally used for deicing, aircraft power, and other functions. These systems are to be replaced with an all-electrical system.

Variants

The 787 is currently being sold in three variants:

  • The 787-3 will be a 296-seat (two class) short-range version targeted at high density flights in Asia, with a range of 3,500 nautical miles (6,500 km). EIS is 2010.
  • The 787-8 will be the "baseline" model, with 223 seats in three classes and a range of 8,500 nautical miles (15,700 km). EIS is 2008.
  • The 787-9 will be a stretched variant, seating 259 in three classes. With targeted EIS set at 2010. However, the EIS may be changed back to 2010 as Qatar Airways wants the aircraft to enter service in 2010. In addition, late 2007 entry is possible for the -3/-8 variants as the project is presently a couple of months ahead of schedule.
787 Specifications (Basic Design)
787-3 787-8 787-9 767-300
(for comparison)
767-400
(for comparison)
Length 55.5 m 55.5 m 62 55.0 m 61.4 m
Height 16.5 m 16.5 m 16.5 m 15.9 m 16.8 m
Wingspan 51.6 m 58.8 m 60.0 m 47.6 m 51.9 m
Cross section 5.75 m 5.75 m 5.75 m 4.50 m 4.50 m
MTOW 163,500 kg 216,500 kg 226,800 kg 156,500 kg 204,120 kg
Seats 296
two class
223
three class
259
three class
218
three class
245
three class
Cargo 16 tons 16 tons 16 tons 10 tons
Engine GE GENX or
Rolls-Royce
Trent 1000
GE GENX or
Rolls-Royce
Trent 1000
GE GENX or
Rolls-Royce
Trent 1000
GE CF6-80C2 or
Pratt & Whitney
PW4062
GE CF6-80C2
Cruising speed 0.85 Mach 0.85 Mach 0.85 Mach 0.80 Mach 0.80 Mach
Range1 6,500 km 15,700 km 15,400 km 7,400 km 10,454 km
Service ceiling 13,000 m 13,000 m 13,000 m 13,000 m 13,000 m
EIS 2010 2008 2010 1986 2000


1 With full load (passengers and cargo)

Related content
Related Development
Similar Aircraft

Boeing 767 - Airbus A330 - Airbus A350

Designation Series

707 - 717 - 727 - 737 - 747 - 757 - 767 - 777 - 787

Related Lists

List of airliners