Meon Valley Railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Jozg44 (talk | contribs) at 02:13, 20 February 2009 (added picture of skew tunnel). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Meon Valley Railway
Alton National Rail Watercress Line
Farringdon Halt
Tisted
Privett
Privett Tunnel (
1056 yd
966 m
)
West Meon Tunnel
West Meon Viaduct
over River Meon
West Meon
Droxford
Mislingford Goods Depot
Wickham
Knowle Junction
Knowle Halt
Former loop line
Fareham

The Meon Valley Railway (MVR) was a cross-country railway in Hampshire, England that ran for 22.5 miles (36.2 km) between Alton and Fareham, closely following the course of the River Meon. At its northern (Alton) end, it joined with the Mid-Hants Railway to Winchester, the Alton Line to Brookwood and the Basingstoke and Alton Light Railway. At Fareham it linked with the Eastleigh to Fareham Line, the West Coastway Line and the line to Gosport. The railway was authorised in 1896 and opened in 1903, making it one of the last railways of any size to be built to main-line standards in the United Kingdom.

Background

The MVR was built by the London and South Western Railway (LSWR), which had a virtual monopoly on railway services in southern Hampshire. It already operated services between London (from its Waterloo terminus) and Southampton and Portsmouth. The former destination was served by the South Western Main Line and the latter by the Portsmouth Direct Line, as well as the line from Eastleigh via Fareham.

A large brick over-bridge south of West Meon. Note the underside of the arch is faced with stone, and that the bridge is wide enough to accommodate double track- all evidence of the impressive mainline standards to which the MVR was built.

Despite this, the LSWR felt that it would be advantageous to build a more direct line between London and the Portsmouth area (especially Gosport). Alton was becoming an important railway junction and a thriving market town, as was Fareham. A line between the two that ultimately connected London and Portsmouth was an attractive proposition. Like many, the LSWR anticipated a growth in tourist and holiday traffic to the Isle of Wight, which had become a popular destination in the late 19th century. Steamer services to the Island departed from Stokes Bay, and the LSWR already had a small station there, connected to Gosport station by a short spur line. Since the 1880s Lee-on-the-Solent had developed as a small but promising resort, and the LSWR had constructed a branch line to the town from Gosport in the 1890s. A railway down the Meon Valley would allow a much shorter run to the Gosport peninsula – as things stood, services had to take either the South Western Main Line, which ran out to the west, or come from the east via the busy junction at Havant. There was also support from the military for another main-line from London to Portsmouth. During the late 19th century there was considerable unease between Britain and France, with some in the British government fearing a large naval attack on Portsmouth or even an invasion. This led to the construction of numerous forts and barracks in the area around Portsmouth, and the Admiralty openly supported any increase in railway capacity to ease the movement of troops and equipment to the South Coast if needed.

There was also an element of railway politics in the decision to build the railway. Throughout the mid- and late- 19th century the LSWR's strongest rival was the Great Western Railway. The LSWR had extended its lines as far as Padstow in Cornwall, which was deep in GWR territory. The GWR had long sought to have its own line from the West Country to the booming ports of Southampton and Portsmouth. To this end, it had acquired running rights over the Didcot, Newbury and Southampton Railway in the 1880s. However, this did not provide a fully independent route. In 1895 the GWR had made a basic proposal for the Portsmouth, Basingstoke and Godalming Railway, a line to the south coast from Reading, then south to Basingstoke, down the Meon Valley and then passing through Southwick and Bedhampton, where it would join the line into Portsmouth. Nothing came of this proposal, but the LSWR clearly believed that it should deny one of the last routes to the coast to its rivals. In 1896 the LSWR drew up plans for two railways- the Basingstoke and Alton Light Railway and the Meon Valley Railway, thus effectively blocking the entire length of the GWR's proposed route.

Compared to many cross-country lines, the Meon Valley Railway project had an easy birth. The necessary Act of Parliament was quickly obtained and a contractor found to carry out the work: Relfe & Son of Plymouth. The LSWR's chief engineer of the works was W.R. Galbraith. T. P. Figgis was the line's architect for stations and other non- permanent way structures.

Design

The decision had been taken to build the line to main-line standards, with a ruling gradient of 1-in-100 and only gentle curves. Stations would be constructed with 600-foot (180 m) long platforms capable of taking 11-coach express trains. The earthworks were to be built to take a single track, but all bridges and tunnels were to be built to dual-track standards. If the line proved successful, it would be upgraded to full-length dual track. As constructed, only the stations had dual tracks, so they were the only places trains could pass each other on the line. The LSWR's promotional material for the line showed the line as a direct London-Gosport route for express services.

File:MVRP003.JPG
The trackbed of the railway south of Wickham, looking towards Knowle Junction.

Due to both the requirements for gentle gradients and the hilly terrain of the Meon Valley the line required some impressive engineering works, including two tunnels and a 62-foot (19 m) high viaduct at West Meon. The summit of the line was at Privett, some 519 feet (158 m) above sea level. As was not unusual with railway construction, due to the constraints of the landscape, a few of the stations were some distance from the settlements they claimed to serve (especially Privett and East Tisted). At the time, several commentators pointed out that these stations were in fact much better placed to serve the large country houses in the area (Basing Park and Rotherfield Park respectively). This point was further emphasised by the naming of the stations. Stations were usually named after the parish they were built in, but the owner of Basing Park insisted the LSWR name the station Privett (instead of the intended name of 'West Tisted') after the much smaller village in the area, next to which his estate was sited.

As befitting a railway built to full standards, the stations were impressive. With leanings towards the Arts and Crafts movement, the stations were built out of brick in a mock-Tudor style, with Portland Stone mullions and gables. The architecture included stained-glass door windows and tiled interiors. The lavatories were in outbuildings styled like Chinese pagodas. Goods yards were planned for Mislingford (mainly to serve a local pumping station) and Farringdon, and all the stations had goods sidings, an ornate corrugated iron goods shed and hand-operated cranes to allow parcels and goods to be picked up and dropped off as needed.

East Tisted station, now used as a private home. All the stations on the Meon Valley Railway used identical buildings in a Tudor style.
Access to the southern entrance of the West Meon tunnel is still possible,though obstructed by a large mound of earth. This is reached using a short walk from the small car park at the northern end of the former viaduct.

Construction

Construction began in 1898. The first task was the laying out and excavating the cuttings to provide material for building up the embankments. The embankments, tunnels, rails, stations, bridges and other structures were then built, with the construction teams starting at the Alton end of the line and moving south. Initially the terrain was easy, with only minimal earth-moving required (considering that the majority of work was done by manual labour). The main problem was obtaining a water supply for both the men and the small steam locomotives used for hauling supplies, since the railway was passing along chalk soil. The further south the railway came, the more undulating the terrain became and greater works of civil engineering were required to maintain the strict gradient requirements of the railway.

After the construction of Privett station, the contractors came to their biggest engineering work – the Privett Tunnel. At just over 1000 yards (900 m) in length, the tunnel also followed a vague 'S'-shape, so the centre of the tunnel was in total darkness. Steam shovels and horses were used to remove the spoil (the latter were lowered into the works down shafts). The ground the tunnel was being driven through was found to be solid enough that the tunnel did not have to be lined with brick- the inner walls of the tunnel are plain, unworked chalk rock. A collapse in the tunnel trapped two navvies – one of whom died of suffocation. The other managed to dig himself free with his pocket knife and was rescued after being trapped for over 24 hours. A second man was killed after being hit by a locomotive. These deaths caused some men to leave the works- enough to make the contractors bring in two steam shovels and a traction engine to speed up progress. The tunnel was built by two teams working from opposite ends, and when the two met they were less than an inch from their planned course.

Between Privett and West Meon the railway had to be built on an embankment some 64 feet (19.5 m) high. This earthwork crossed the A272 road to Petersfield, which was accommodated by a short brick-lined tunnel through the embankment some 167 feet (50 m) long.

A second 600-yard (550 m) tunnel was built on the approach to West Meon, but before the railway could reach the site of West Meon Station, it had to cross the River Meon itself, which at this point ran through a narrow but deep valley. A 6-arch concrete viaduct was planned, but the ground was not as strong as initial tests showed, and very soon after construction the foundations of the viaduct began to subside. A 4-arch iron design was used instead, with large earth embankments on the approaches over the unstable ground. The viaduct dwarfed the surrounding village, standing over 62 feet (19 m) high. Despite being much lighter than the concrete design, the whole structure weighed over 700 tons (700 tonnes). It is rumoured that 2 partially complete arches of the original viaduct are buried within the northern embankment.

The West Meon viaduct shortly after construction. The large embankments leading to the viaduct are obvious having not had time to grass over. Only the concrete pedestals for the pillars remain now.

West Meon station was the only point on the line where trains could take on water. A deep well was sunk into the hills east of the station and piped to a tank and water column in the station's goods yard. West Meon was also chosen as the site of the temporary 'village' of wooden huts to provide accommodation for the navvies and their families. A smaller collection of huts had been built at Privett.

Having crossed the Meon Valley, the railway then passed through easier country, gradually descending through means of a series of embankments and cuttings. The chalk soil supported many streams and rivulets, so at several key points the builders provided culverts or narrow bridges to provide drainage.

The builders of the railway provided this skewed tunnel to allow the railway on its embankment to cross the River Meon north of Wickham.

South of Droxford, the workers encountered the Reading Beds – an area of clay and gravel that, as part of the larger Fareham Clay Beds, made the area a centre for brickmaking. However, the soil was highly unstable – when wet it was almost liquid, whilst in the summer it was as difficult to work as concrete. Huge amounts of chalk soil excavated from the two tunnels were brought in to stabilise the trackbed and to build embankments, but throughout the life of the railway subsidence was a problem along this stretch. The clay soil also led to standing water and flooding during heavy rain, and a number large grilled drains were provided along the line between Mislingford and Knowle.

File:MVRP001.JPG
This iron bridge carried the railway over the River Meon at Wickham.

The line then passed through the Forest of Bere before heading across the water-meadows at Wickham on an embankment. The embankment crossed the River Meon itself, requiring the river to be taken through a long brick skew tunnel. The embankment also effectively divided the village of Wickham in two, with two new bridges providing the only means of crossing under the railway. This remains the case today. Just south of Wickham station, the Meon was crossed again on a steel bridge supported on 6 tubular steel pillars – this was the second biggest bridge on the line after the West Meon Viaduct. The meandering course of the Meon, the constraints of the landscape and the railway's ruling gradient meant that the railway required 5 under-bridges within half a mile (1 kilometre)- 3 to cross the Meon (including the steel bridge near Wickham station) and the 2 to cross roads in Wickham.

Finally, the railway gradually dropped to the natural ground level to the south of Wickham, joining the Eastleigh to Fareham Line just north of the Knowle Hatches Viaduct. Trains from the Meon Valley then passed down this line and into a newly-built platform at Fareham station.

The construction of the MVR also included the building of a 2-mile (4-kilometre) stretch of line between Fareham and Knowle Junction to bypass the Fareham Tunnel, which had suffered serious subsidence problems due to being built through the local clay beds. The tunnel frequently had to be closed for maintenance and shoring-up, so a bypass line was urgently required, especially given the anticipated increase in traffic caused by the new line. The double-track line ran through the north of Fareham and the village of Funtley, re-joining the main line just south of Knowle Hospital.

File:MVRP002.JPG
One of the brick and iron bridges needed to cross roads in the middle of Wickham. Notice how the brick uprights of the bridge extend outwards from the iron section of the bridge. This was to enable the truss of the bridge to be widened to accommodate double track.

The total cost of the Meon Valley Railway, including the Fareham tunnel by-pass, was £399,500, 2 shillings and 3 pence. This equates to about £27.7 million at today's prices.

Early history

The opening of the railway was delayed by signalling problems and problems with subsidence of the embankments south of Droxford. The line finally opened on 1 June 1903. There were between 8 and 11 services a day, running 4- and 6-coach trains. London-Gosport services were hauled by Adams 'Jubilee' engines. The lighter Alton-Fareham trains were worked by Adams 'Radial' tank engines (a 'Radial' hauled the first public train on the line). Twice a day the line was used by a London-Gosport fast express service, usually hauled by a Drummond T9 'Greyhound'.

As was expected in such an agricultural region, the bulk of traffic came from shipping agricultural produce. On the MVR this included watercress, wheat, fruit (especially strawberries and apples), milk and cattle. The LSWR put on special market-day trains, with both passenger carriages and livestock cars, allowing farmers to accompany their livestock. There were local 'pick-up/set-down' goods services along the line, which called at every station to deliver and pick up any waiting goods. No shunting engines were stationed on the MVR, so the locomotive working the train had to uncouple at each station and marshal wagons into and out of the train as required- standard practise for a rural line. Heavier freight services were often powered by locomotives such as the Drummond 700 Class.

West Meon Station shortly after the railway opened in 1903 looking south. The intricate wooden footbridge was removed in the 1920s.

Local residents and businesses had high hopes for the railway. The 'Railway Inn' was built next to Droxford station in the hope of accommodating tourists and travellers. A public house was built next to Privett station named 'The Privett Bush'. Coal merchants did good business – West Meon station employed no fewer than three different merchants, and one business supplied coal to 2 of the stations.

Many local newspapers were impressed by the line's speed, the scale of its engineering works, the high standards of the stations and other structures and the beauty of the scenery it passed through. Then, as now, the link between the Meon Valley and the famous figures of Gilbert White and Jane Austen was made several times. Some papers wrote articles descrbing the route and its scenery in great detail, pointing out places of interest along the line, such as the hill fort at Old Winchester Hill.

In 1907 a halt was built at Knowle Hospital to serve both it and the village of Funtley[1]. This small station - little more than a platform and a shelter, became one of the first rural stations in Hampshire to be lit by electricity, since it took its power from the hospital's generators. It was served by trains on both the Meon Valley and Eastleigh-Fareham lines, with MVR trains stopping twice a day.

Unfortunately, the expected London through-traffic never materialised, and after only a few years the London to Gosport services were cut back. Similarly, the tourist traffic to Stokes Bay also failed to grow, with steamers preferring the more established ports at Portsmouth and Southampton. Even during the First World War, traffic was light compared to other lines, despite the line partly being built for military traffic. In fact, in 1915 the regular London traffic was suspended totally, and the services were never reinstated. From then on the MVR only handled regular traffic between Fareham and Alton. The only major troop movements were from local regiments. Droxford station had a brief moment in the public eye when Admiral Doveton Sturdee arrived at the station on his way to his nearby home after his victory in the Battle of the Falkland Islands in 1914).

Occasionally special trains from other parts of the network used the line, and the MVR did see infrequent use as a 'spare' mainline during periods of high traffic such as the summer holiday season or Christmas.

The most obvious signs of the railway not developing as expected were the series of changes made to the signalling arrangements in 1921. Privett signal box was effectively closed and the line was changed from being worked as a single-track main line to operating as a single-track branch line, with longer signal blocks and fewer passing loops (the 'down' platform at Privett was closed, the second line through the station now being only used for shunting).

Southern Railway

The LSWR was merged into the Southern Railway in 1923. By then services had been reduced even further. There were now 6 or 8 services a day, mainly formed of 2- or 3-coach trains hauled by Drummond M7 tank engines, with T9s remaining for faster services. Goods services remained vital to the line, with a twice-daily service — one trip south-bound and one north-bound. Wagons and trucks would be shunted into the train at the three goods yards by the locomotive.

Winter of 1927 brought storms and heavy snowfall to the Meon Valley region. A special Waterloo-Gosport train running down the line at 5:40am on the 27th December became stuck in a huge snowdrift near Tisted. Workmen took nearly a day to free the train and clear the line.

Since the railway opened, there had been calls for a station at Farringdon, just south of Alton. A goods yard for loading agricultural produce was already sited there, and in 1930 a short wooden platform of one coach-length was built to serve the village. Requests for a similar platform and yard at Meonstoke were not acted on, although the planners of the line had allowed for the future construction of a yard at that location. A single section of rail, dug vertically into the ground, marked the possible site for such a yard until after the railway closed- it was finally removed in the 1960s.

In 1931 a further down-grading of the MVR took place when the track at Butts Junction (the approach to Alton station) was re-laid. The signal box was removed and the MVR's direct connection with the Alton Line to London was removed, meaning that MVR trains now ran direct to a bay platform at Alton station. It also meant that trains could not run direct from the Alton Line to the Meon Valley as they had been able to- if this was required trains had to shunt from one line to the other. This change spelt the end of the MVR as an integrated part of the railway network- it was now simply handling stopping local traffic with none of the fast inter-city express traffic that the line was built to handle and that used the line in its early days.

The Alton Line was converted to electric operation in 1937. It was decided that it was not viable to electrify the MVR, and with that decision went any realistic hope of the line being upgraded to the dual-track standards to which it was built (indeed, the railway would remain single-line for its whole existence).

This period saw changes to the stock used on the MVR. The M7 tank engines remained the main type used, but goods services on the line was now being worked by types deemed redundant for main-line passenger working, such as a small number of Drummond L12s, which had been the LSWR's cutting-edge express locomotives when the line was built. T9s also began to be used for freight services and shunting. Some newly-built types were used during the summer for heavy agricultural trains or tourist services to the coast, such as the Maunsell U-Class.

By the outbreak of the Second World War in 1939, rural lines such as the MVR were all coming under threat from rural bus services, and even goods services were being threatened by local lorry services. The bulk of passenger services were now being run by M7 tank engines with a 2-car 'push-pull' train (carriage sets where the locomotive can be controlled from the rearmost carriage, negating the need to turn the train). These trains looked decidedly lost against the long platforms designed to take up to 11-car expresses.

Wartime

During the Second World War the line was yet again used lightly compared to other railways in the region (such as the Didcot, Newbury and Southampton Railway). The only real change was an increase in goods traffic supplying the naval dockyard at Portsmouth. This saw new locomotive types running over the line, such as Drummond 700s and the distinctive Bulleid Q1s. Standard passenger services had a box van added to cope with the near-constant stream of parcels and luggage to and from Portsmouth. A few troop trains used the line late at night. In 1941 a special military freight train, hauled by a Drummond 700, was stabled for the night at Tisted, with the crew receiving instructions to stay with the engine and be ready to depart instantly in an emergency. Although unknown to both the locomotive crew and station staff, the train was carrying 48 mines.

Despite this relatively light military traffic, the Meon Valley Railway did come under attack during the war. A Junkers Ju 88 dropped bombs at Droxford station during 1940. These missed the station building and tracks but destroyed two railway worker's cottages. The aircraft then dropped further bombs at Soberton, but these also missed the railway. The bomber then turned around and headed up the line to the West Meon Tunnel, and a single bomb was dropped at the northern portal. A direct hit was not achieved, but a short section of line, including several sleepers, was destroyed and a crater was left in the ballast. All trains were quickly halted and the line was repaired in a few days.

File:MVRP007.JPG
A terrace of cottages near Wickham, built for railway workers.

Despite this fairly quiet wartime career, the MVR had one crucial role to play. On Thursday, June 2, 1944, Winston Churchill, U.S. General Dwight D. Eisenhower, the Prime Ministers of Canada and South Africa, William Lyon Mackenzie King and Jan Smuts, and other Allied leaders met in a special train at Droxford Station (the train was actually the Royal Train from the London, Midland & Scottish Railway). The station possessed the longest siding in southern England (outside the railway works at Eastleigh) and was close to a deep cutting. If threatened by an air raid, the train could be pushed into the relative safety of the cutting. During this meeting, final decisions regarding the planning of Operation Overlord were made.

Post-War and British Railways

The Southern Railway was nationalised into British Railways in 1948. No immediate changes were made, with the standard 2-car 'push-pull' sets running around five services a day. However, the rise of private car ownership and a major shift of local goods traffic from rail to road saw the MVR become increasingly uneconomical to operate. Services were gradually run down. This led to even lower passenger numbers as the service became less and less frequent, and more people switched to using cars or buses.

During the early 1950s, British Railways drew up its 'Modernisation Plan'. This mainly concerned itself with the planned withdrawal of steam locomotives and the electrification of its main trunk routes. However, the plan also listed several lines that could be closed either because they were redunant in a nationalised, competition-free network or because they were unsustainable to operate. The Meon Valley Railway fell into both these catergories.

Gradual closure

The site of West Meon station today. The long platforms and large brick under-bridge over the station are still intact and clearly visible.

On 5 February 1955 the Meon Valley Railway closed to passenger traffic, although the goods services were retained. As is often the case, passenger numbers rocketed in the final weeks of operation, as people took a final ride on the railway. It should be noted that the closure was long before the 'Beeching Axe' of the 1960s, where many well-used but uneconomic railways were closed. There is little doubt that in 1955 the Meon Valley was unsustainable as a passenger railway.

The day after 'official' closure to passengers, a special train called 'The Hampshireman', organised by a rail enthusiasts' group, ran along the full length of the line - the last train to do so. It was hauled by two T9s 'double-heading'.

Goods services were to continue with a once-a-day service from Fareham to Droxford, and a similar service from the northern end only from Alton to Farringdon. The section of line in between (including West Meon, Privett and East Tisted stations) was lifted. This included the demolition of the West Meon Viaduct. The huge iron bridge had a high value in scrap, and thus was one of the first structures to be demolished (had it been built from concrete as originally planned it would probably still be standing). During the viaduct's demolition, it was found to be suffering from corrosion in several places which would have needed extensive and costly repairs in the near future if the railway were to remain open. This was seen as a further justification of the closure by some at BR.

File:MVRP010.JPG
One of the concrete pedestals that supported the West Meon Viaduct, now heavily overgrown.

Staff numbers at stations had been hugely cut, and even though the line was officially 'open', the station platforms were overgrown and much of the infrastructure neglected.

As British Railways was urged to cut costs throughout the 1960s, the southern goods service to Droxford was withdrawn in 1962. The last BR-scheduled passenger service on any part of the MVR had been the 'Solent Limited' railtour on the 30th April 1961 (a year to the day before the section was closed). A goods service to Farringdon was maintained until 1968, when the final part of Meon Valley Railway was closed to all traffic.

Post-closure

After the 1962 closure of the southern portion of the line, a Mr. Charles Ashby purchased Droxford station and the right to run trains over the railway. He used it for testing a design of railbus that he had developed called the 'Pacerailer'. Like the similarly-named British Rail 'Pacer' of later years, this was essentially a bus-style body on railway bogies. As well as the MVR itself, a special steep-gradient section of track was built for testing at Droxford. The Pacerailer was then moved to the Isle of Wight for testing in service, but was not adopted.

The northern section of line to Farringdon was lifted almost immediately after closure. The two tunnels at West Meon and Privett were sold to private users. West Meon Tunnel was used by a scrapdealer for breaking up ex-military vehicles and aircraft until the 1980s, whilst Privett Tunnel was used for growing mushrooms.

After the Pacerailer tests, the southern portion of the line was leased to a steam locomotive preservation society, which planned to operate the section as a preserved railway. To this end, they moved several locomotives (including a 'USA' tank engine and a 'Terrier' tank engine), as well as rolling stock, to Droxford. However, a fire at the site, and the fact that BR planned to sever the connection with the Eastleigh to Fareham Line, thus cutting off any preserved railway, meant that plans came to nothing.

Once the mainline connection was gone, Ashby used two small Ruston-Hornsby diesel shunters and two ex-BR carriages to operate private-charter trains for a short time. The line south of Wickham was lifted in 1974, and the last remaining section between Wickham and Droxford in 1975. The last vehicle to run on the MVR was an Austin Mini-based railcar owned by Charles Ashby.

Today

Despite the lifting of the entire track, the MVR has physically survived well. The section between Knowle Junction and the West Meon Viaduct is now an 11-mile (17-kilometre) bridleway, the Meon Valley Trail. On this section, all bridges, embankments and cuttings are intact and serviceable, except for two minor bridges north of Droxford which were removed in the 1960s to allow farm traffic to use the lanes they crossed. Along this part of the line, there are still occasional remains of trackside huts, signal posts and telegraph lines. At Mislingford Goods Yard, sleepers are still in the ground, a concrete loading gauge remains in place and the cast iron base of the loading crane still stands next to the remains of a coal bunker.

The old loading gauge at the former Mislingford goods yard.
File:MVRP011.JPG
The site of a brick under-bridge near Farringdon. The bridge was dug out of the railway embankment in the 1970s and the site used for agriculture.

The only remains of the West Meon Viaduct are the two huge embankments approaching either end and the concrete pedestals that formed the foundations for the cast iron pillars.

West Meon Tunnel is currently used to store caravans and other building supplies together with a large amount of Cold War era scrap left behind from the aircraft storage and breaking during the 1980s, whilst part of Privett Tunnel is used as a storage site by a local builders merchant. Both tunnels are home to large colonies of bats, and are thus protected from disturbance and are regularly surveyed.

North of the tunnels, the line is less well-preserved. The majority of the bridges have been removed, and on the section closed in 1955, much of the earthworks have been levelled and turned back into agricultural land. A cutting directly north of the West Meon Tunnel has been completely filled in, returning it to the natural ground level. This has had the effect of burying a brick over-bridge carrying a lane, which is now visible only as two walls flanking the road seemingly in the middle of a field.

At the very northern end approaching Alton, there is almost no evidence of the line's existence on the ground, and a large roundabout now sits on the Butts Junction site where the MVR joined the Mid-Hants Railway. A short length of Meon Valley Railway track remains as a siding at Butts Junction, now owned and used by the Watercress Line.

Three of the stations have survived (Droxford, East Tisted and Privett), and are used as private houses. Wickham and West Meon stations stood empty for many years and were eventually demolished in the 1970s, although at West Meon the long platforms are still very much in evidence, despite being overgrown, as is the site of the station buildings and the goods yard. There is almost no evidence of Wickham station.

At Droxford station, a plaque commemorates the crucial meeting of the Allied leaders in 1944.

The MVR closely followed the A32 road between Gosport and Alton, and the line crossed the road frequently. Today the road still crosses over and under many of the former bridges of the line. At Hedge Corner, north of Privett, the road was re-routed during the building of the railway to take a chicane-like course under a bridge that carried the railway across the road at a diagonal angle. When the bridge and its embankments were levelled, the road was straightened. The two loops of the chicane now form redundant lay-bys. Small terraces of cottages built for railway workers still stand near Wickham, West Meon and Privett.

The A272 road still passes through the tunnel under the embankment near West Meon, and the tunnel is a prominent local landmark.

Possibility of re-opening

It is probable that it would see significantly more use today if it were open than it did in its final years, due to the greater population of all the villages and towns that it served, especially the greater volume of traffic between Fareham and Alton (as heavy traffic on the A32 and A31 roads show). To that end, a local society is exploring the possibility of constructing a 2' or 2' 6" narrow gauge railway from West Meon to Wickham and perhaps as far as Knowle.

It is, however, unlikely that the whole length of the former line could be re-used. The northern end of the line has been completely levelled, and the majority of the bridges have been demolished. Also, parts of the former track-bed have been built on at Farringdon and East Tisted. The surviving stations are now private homes. From an engineering point of view, it would be relatively simple to reinstate the line from Fareham as far as West Meon, and if the viaduct were rebuilt, as far as Privett. However, such a line, that did not connect to Alton, would be highly unlikely to be viable as a mainline route, and could only function effectively as a small commuter line or heritage railway.

It is said that the Act of Parliament that authorised the Meon Valley Railway had a 'perpetual service' clause imposing a legally-binding requirement on the owner of the railway to run services to West Meon. Such a clause would make the closure of the MVR illegal, through the withdrawal of trains to West Meon. Clauses like these were often put in Railway Acts in the 19th century to prevent companies building lines to cut off rival's routes and then providing an almost non-existent train service. Such a clause was invoked to delay the closure of the Bluebell Railway in West Sussex. However, since there was no protest at the time of the line's closure, any such clause exists today only as a technicality, as with similar cases of now-closed railways.

Analysis

In hindsight it seems hard to locate the reasons why the Meon Valley Railway was built.It connected two medium-sized market towns that already had an indirect but serviceable railway connection between them. It passed through what was then (and still remains) a sparsely populated and overwhelmingly agricultural area, and even then the stations were often a mile or so from the villages they claimed to serve. This is especially obvious at Privett. Even today this area has no real village population centre. The station building, railway worker's cottages and the brick over-bridge carrying the A32 are all still very well preserved and stand in isolated countryside.

File:027161 b031e7bePS.jpg
Privett station as it appears today. The area around the station is still sparsely populated and agricultural.

At the turn of the century, however, the conditions were different. The railways had a virtual monopoly on medium- and long-distance travel, and practically all goods traffic went by rail. Raw material, construction and labour costs were low, making it viable to not only build a railway, but to staff it. Cross-country railways were run mainly to make money from traffic going between the two termini of the route (in this case Alton and Fareham). Any other traffic picked up at intermediate stations along the line was simply a 'bonus'. At the time, it made business sense to build a line through an area of such low population. If, as detailed in the 'Background' section, above, the MVR was also a 'blocking line' to prevent the Great Western Railway using the route to build an independent line to the south coast, then this could also be seen as a reason for the line's construction.

However, no source seems to be able to adequately explain why the MVR was built to such expensive main-line standards. Course (1976, see source list) cites the five stations on the MVR as the most expensive stations per head-of-population-served to be built in the United Kingdom. The stations are considered some of the finest rural stations of the late Victorian period, especially given the LSWRs usual lack of brilliance in this area of railway design. The decision to build the line to express standards (with a low ruling gradient and gentle curves) meant that vastly expensive earthworks had to be constructed, and the bridges and other associated structures were built on a large scale and a very high standard (despite going un-maintained for over 50 years, most are still in excellent condition).

It is possible that the LSWR genuinely believed that it was building a new, fast line to the South Coast that cut significant time and distance off its existing routes and served what was expected to become the booming resort at Stokes Bay. The encouragement from the Army and the Admiralty may have made the LSWR expect the line to be used for the significant military London-Portsmouth traffic, and as a major trunk route in the event of war. Whilst the line was never heavily used by tourists (Stokes Bay never developed as a resort) or high levels of military traffic, it also seems the LSWR never even tried to stimulate such use- almost from the day the MVR opened its express and fast services were cut back- only 12 years after the line's opening they were removed entirely.

Trivia

Shortly after the final closure of the MVR in 1968, the section of line between Alton and Farringdon was used for the filming of the first of the long-running 'Milk Tray Man' series of adverts for Cadbury Milk Tray. The eponymous 'action man' character jumps onto the roof of a moving train that consisted of a British Railways diesel locomotive and two carriages. This was the only recorded time that a BR diesel locomotive was used on any part of the MVR.

Other plans for a Meon Valley Railway

The Meon Valley formed one of the most direct routes from London to Portsmouth- the reason why the original South Western Main Line went via Basingstoke was because of a planned connection with another line heading towards Bristol. As such, there were several plans for railways in the Meon Valley in the middle and late 19th century.

  • 1851- The Alton & Petersfield Railway proposed a route down the Meon Valley from Meonstoke to Fareham. This included a line from Meonstoke connecting with the Bishop's Waltham branch, which would have required significant engineering works to cross the valley somewhere between Meonstoke and Droxford.
  • 1864- The LSWR was actually granted an Act of Parliament to build a line from Ropley on the Mid-Hants Railway through West Meon and Warnford, before joining with the still-proposed Petersfield-Bishop's Waltham Line.
  • 1881- the Windsor, Aldershot & Portsmouth Railway was proposed, which would run from Farnham, westward to East Tisted, then down the Meon Valley to West Meon, where it would turn east over the South Downs through Hambledon before reaching the lines into Portsmouth at Cosham. This main-line railway would have required several gradients of around 1-in-80 and 3 tunnels of nearly a mile in length. The proposal had the support of the Army and the Royal Navy but failed to find financial backers and never progressed.
  • 1895- The Great Western Railway put forward a tentative proposal for the Portsmouth, Basingstoke and Godalming Railway, a line down the Meon Valley from Basingstoke to Bedhampton (see 'Background' section above).
  • 1944- Around the time of the Allied leaders' meeting at Droxford, a proposal was made for the USATC to build a branch from Droxford to Southwick House. The success of the Allied invasion of Europe in 1944 meant that this plan was never carried out.

Sources and further reading

  • Course, E (1976) The Railways of Southern England. Vol: III
  • Moore, P (1988) The Industrial Heritage of Hampshire and the Isle of Wight, Chichester : Phillimore
  • Robertson, K. (1988) Hampshire Railways Remembered, Newbury : Countryside Books, ISBN 0-905392-93-0
  • Tillman, D (1983) The Meon Valley Railway Revisited, KRB Publications, ISBN 0954203542
  • Stone, R.A (1983) The Meon Valley Railway, Runpast Publishing, ISBN 978-1870754361
  • Vaughan, J (2004) Branches & Byways- Sussex and Hampshire, Ian Allen Publishing, ISBN 978-0860935858
  • Platform 14 Ltd (2008-05-11). "Meon Valley Rail". Along These Lines. Season 1. Episode 5. ITV Meridian.
  • Subterranea Britannica- Pictures of Droxford Station in use and after closure, with information about 1944 Wartime meeting.
  • Fareham & District Model Railway Club - an accurate model of the West Meon Viaduct with photographs of how the site of the viaduct appears today.