Riverside station (Metro-North)
Appearance
Riverside | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||
Location | 1 Riverside Avenue, Riverside, Connecticut | ||||||||||||
Coordinates | 41°01′58″N 73°35′39″W / 41.032735°N 73.594215°W | ||||||||||||
Owned by | ConnDOT | ||||||||||||
Line(s) | Northeast Corridor | ||||||||||||
Platforms | 2 side platforms | ||||||||||||
Tracks | 4 | ||||||||||||
Construction | |||||||||||||
Parking | 324 spaces | ||||||||||||
Other information | |||||||||||||
Fare zone | 15 | ||||||||||||
History | |||||||||||||
Electrified | 12.5 kV AC overhead catenary | ||||||||||||
Key dates | |||||||||||||
January 15, 1972 | Station agent eliminated[1] | ||||||||||||
Passengers | |||||||||||||
2018 | 679 | ||||||||||||
Rank | 69 of 124[2] | ||||||||||||
Services | |||||||||||||
| |||||||||||||
|
The Riverside station is a commuter rail stop on the Metro-North Railroad's New Haven Line, located in the Riverside area of Greenwich, Connecticut. The Riverside Avenue Bridge crosses over the west end of the station platforms.
The station has 324 parking spaces, 307 owned by the state.[3]
Station layout
This station has two high-level side platforms each six cars long.[4]: 20
G | Street level | Exit/entrance and parking |
P Platform level |
Side platform, doors will open on the right | |
Track 3 | ← New Haven Line toward Grand Central (Cos Cob) | |
Track 1 | ← New Haven Line express trains do not stop here ← Amtrak services do not stop here | |
Track 2 | Amtrak services do not stop here → New Haven Line express trains do not stop here → | |
Track 4 | New Haven Line toward Stamford (Old Greenwich) → | |
Side platform, doors will open on the right |
References
- ^ "7 County R.R. Stations to Quit Selling Tickets". The Bridgeport Post. January 6, 1972. pp. 1, 16. Retrieved March 28, 2020 – via Newspapers.com.
- ^ METRO-NORTH 2018 WEEKDAY STATION BOARDINGS. Market Analysis/Fare Policy Group:OPERATIONS PLANNING AND ANALYSIS DEPARTMENT:Metro-North Railroad. April 2019. p. 6.
- ^ "Task 2: Technical Memorandum parking Inventory and Utilization: Final Report" submitted by Urbitran Associates Inc. to the Connecticut Department of Transportation, "Table 1: New haven Line Parking Capacity and Utilization", page 6, July 2003 Archived July 12, 2007, at the Wayback Machine
- ^ "Metro-North Railroad Track & Structures Department Track Charts Maintenance Program Interlocking Diagrams & Yard Diagrams 2015" (PDF). Metro-North Railroad. 2015. Retrieved January 28, 2019.
External links
- Media related to Riverside station (Metro-North) at Wikimedia Commons
- Metro-North station page for Riverside
- List of upcoming Metro-North train departure times and track assignments from MTA
- List of upcoming train departure times and track assignments from MTA
- State Department of Transportation inspection report, January, 2007
- Connecticut Department of Transportation "Condition Inspection for the Riverside Station" report, September 2002
- Riverside Avenue bridge
- Riverside Avenue entrance from Google Maps Street View
- http://www.ct.gov/dot/lib/dot/documents/dpt/1_Station_Inspection_Summary_Report.pdf