Jump to content

Yinfeng line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by WOSlinkerBot (talk | contribs) at 21:45, 20 June 2020 (remove un-needed options from tables). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Yinfeng Line
(鄞奉线)
Overview
Other name(s)Line S3 (S3号线)
Ningbo–Fenghua intercity railway
(宁波至奉化城际轨道交通)
Ningfeng line
(宁奉线)
StatusOperational
OwnerNingbo
LocaleNingbo, Zhejiang, China
Termini
Stations9 (3 in operation)
Service
TypeRapid Transit
SystemNingbo Rail Transit
Operator(s)Ningbo Rail Transit Co.,Ltd.
Rolling stock6-car Type B
History
Opened28 September 2019[1] (initial section)
2020 (entire line)
Technical
Line length21.53 km (13.38 mi)[2][3](5.61 km (3.49 mi)[2][3] in operation)
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h
(The section from Fangqiao to Jinhai Road reserved to be 120 km/h)

Yinfeng line of Ningbo Rail Transit (宁波轨道交通鄞奉线), also known as Ningbo–Fenghua Intercity Railway, Ningfeng line or Line S3, is a rapid transit line in Ningbo. It starts from Gaotang Bridge station in Yinzhou District and ends in Jinhai Road station in Fenghua District. Through train service will be operated on Line 3 and Ningfeng Line and no interchange is needed.[4] Construction of Ningfeng Line started on December 30, 2015.[5] The initial section of the line (Gaotang Bridge - Minghui Road, 3 stations) opened on September 28, 2019. The remaining section of the line (Minghui Road - Jinhai Road, 6 stations) will open in 2020.

Route

The railway starts south of Gaotang Bridge station in south Yinzhou District, goes south until it reaches the Ningbo Ring Expressway and turns into an elevated line and enters the Huanzhen North Road of Jiangshan Town. After reaching Jiangshan Station, it turns east into Yanhu Road and passes Yinzhou Industrial Park and Yongjiang Village until it reaches Fangqiao and turns south again along Donghuan Road before it reaches its destination, Jinhai Road Station.[6] The section between Fangqiao to Dacheng stations the elevated structure will run under the elevated south extension of the Ningbo Airport Expressway forming a three level structure similar to the northern section of Shanghai Metro Line 1.[7]

The route is 21.53 km in length[2][3][8], of which 0.916 km is underground[8] with the rest being elevated.

The line will running up to 80 km/h (the section from Fangqiao to Jinhai Road reserved to be 120 km/h).

It is proposed that in the future, this line will be divided at Fangqiao station: northern part will be integrated into Line 3 and southern part will be extended northwards until it finally reaches Jinfang station of Line 5. A further extension southwards into Ninghai County[4] and a branch line west to Xikou Town has also been proposed.[9]

Opening timeline

Segment Commencement Length Station(s) Name
Gaotang Bridge — Minghui Road 28 September 2019 5.61 km (3.49 mi)[1] 3 initial section of Yinfeng line

Stations

Section Station name Connections Distance
km
Location
English Chinese
Line 3 (through operation) Template:NingboRT stations 大通桥  2  Jiangbei
Template:NingboRT stations 中兴大桥南 Yinzhou
Template:NingboRT stations 明楼  6 
Template:NingboRT stations 体育馆  7 
Template:NingboRT stations 樱花公园  1 
Template:NingboRT stations 儿童公园  4 
Template:NingboRT stations 仇毕
Template:NingboRT stations 钱湖北路
Template:NingboRT stations 锦寓路
Template:NingboRT stations 四明中路
Template:NingboRT stations 鄞州区政府  5 
Template:NingboRT stations 南部商务区
Template:NingboRT stations 鄞州客运总站
Template:NingboRT stations 句章路
Template:NingboRT stations 高塘桥
Yinfeng line Template:NingboRT stations 姜山
Template:NingboRT stations 狮山
Template:NingboRT stations 明辉路
Template:NingboRT stations 朝阳
Template:NingboRT stations 方桥 Fenghua
Template:NingboRT stations 琎琳
Template:NingboRT stations 南渡
Template:NingboRT stations 大成东路
Template:NingboRT stations 金海路

References

  1. ^ a b "官宣 定了!宁奉线首通段9月28日开通,与3号线一期贯通运营". Ningbo Rail Transit. 2019-09-19.
  2. ^ a b c "官宣 宁奉线首通段通过初期运营前安全评估". Ningbo Rail Transit. 2019-09-06.
  3. ^ a b c "宁波至奉化城际铁路首通段已具备初期运营条件". 2019-09-07.
  4. ^ a b China Railway Siyuan Survey and Design Group. Report of Environment Impact of Ningbo–Fenghua Intercity Railway. Wuhan. July 2015.
  5. ^ "Ningbo–Fenghua Intercity Railway begins construction and is scheduled to open in June, 2019". Ningbo PAI Client. December 30, 2015. Retrieved December 30, 2015.
  6. ^ "The route of Ningbo–Fenghua Intercity Railway is almost fixed. Construction expected to start next year". Ningbo Daily. July 9, 2014. Retrieved September 14, 2014.
  7. ^ "二层跑城铁三层跑汽车宁波至奉化快速路开建-宁波频道". nb.zjol.com.cn. Retrieved 2018-01-06.
  8. ^ a b "宁波市轨道交通2号线二期及宁波至奉化城际铁路工程后通段供电系统安装施工招标公告". 2018-06-29.
  9. ^ "宁波市奉化区人民政府门户网站". www.fh.gov.cn. Retrieved 2018-01-06.