Jump to content

Hangzhou–Taizhou high-speed railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Ramramger (talk | contribs) at 12:20, 19 December 2020 (Stations). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Hangzhou–Shaoxing–Taizhou
high-speed railway
杭绍台城际铁路
Overview
StatusUnder construction
LocaleHangzhou
Shaoxing
Taizhou
Termini
Stations12
Service
Operator(s)China Railway High-speed
Technical
Line length267 km (166 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed350 km/h (217 mph)

The Hangzhou–Shaoxing–Taizhou high-speed railway is a high-speed railway in China. It is currently under construction and expected to open in 2021.[1]

Route

The railway does not parallel any existing railway.

Features

Xiaobeishan tunnel, a 596 metres (1,955 ft) long single-bore quadruple-track tunnel. The Hangzhou–Shaoxing–Taizhou high-speed railway uses the inner two tracks.[2]

Stations

It will have the following stations:[3]

Station Name Chinese Metro
transfers/connections
Hangzhou East Hangzhou Metro  1   4   6 
Hangzhou South Hangzhou Metro  5 
Shaoxing North  1 
Dongguan
Sanjie
Shengzhou Xinchang
Tiantai
Linhai
Taizhou Central
Wenling
Wenling West
Yuhuan

References

  1. ^ 滕雪. "杭绍台铁路全线桥梁架设工程启动 预计2021年建成通车". news.cctv.com. Retrieved 2020-11-09.
  2. ^ "我国首条单洞四线超大断面高铁隧道贯通". www.crecg.com. Retrieved 2020-11-09.
  3. ^ "杭绍台铁路最新消息!预计2021年底开通,站点及线路图一览 - 土流网招拍挂手机版". m.tudinet.com. Retrieved 2020-11-09.