Chongqing–Wanzhou intercity railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by DePiep (talk | contribs) at 17:10, 20 April 2016 (Template:Infobox rail line: fix bad parameters, use alt parameters (via AWB script)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Chongqing-Wanzhou Intercity Railway
逾万客运专线
Overview
StatusUnder construction
LocalePeople's Republic of China
Termini
Stations7
Service
TypeHigh-speed rail
Operator(s)China Railway High-speed
Technical
Line length248 km (154 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed250 km/h (155 mph)
Chongqing-Wanzhou Intercity Railway
Simplified Chinese逾万客运专线
Traditional Chinese逾萬客運專線
Template:BS-header

Template:BS-header Template:BS-table Template:BS4 Template:BS4 Template:BS4 Template:BS4 Template:BS4 Template:BS4 Template:BS4 Template:BS4 Template:BS4 Template:BS4 Template:BS4

Technical
Line length248 km (154 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed250 km/h (155 mph) max.

|}

Chongqing–Wanzhou Intercity Railway is a high speed railway currently under construction between Chongqing and Wanzhou. Construction started in December 2012, according to the summarizing and commending meeting of the phase II of “100-day Battle” in Chongqing Liangjiang New Area.[1] It is expected to be completed in 2016 and take passengers from Chongqing North Railway Station to Wanzhou Railway Station in one hour.

The 248-km-long Chongqing-Wanzhou Railway is designed to run at a speed of 250 km/hour connecting Chongqing North Railway, Fusheng, Changshou, Changshou Lake, Dianjiang County, Liangping and Wanzhou, according to the approval from The Ministry of Railways of PRC.

After completion, the train could take passengers from Dianjiang County to urban Chongqing in 30 minutes.

References