Line 9 (Guangzhou Metro)
Appearance
This article relies largely or entirely on a single source. (November 2015) |
Line 9 | |||
---|---|---|---|
Overview | |||
Status | Under construction | ||
Owner | City of Guangzhou | ||
Termini | |||
Stations | 11 | ||
Service | |||
Type | Rapid transit | ||
System | Guangzhou Metro | ||
Services | 1 | ||
Operator(s) | Guangzhou Metro Corporation | ||
Technical | |||
Line length | 20.1 km (12.5 mi) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
|
Line 9 of the Guangzhou Metro (Chinese: 广州地铁9号线; pinyin: Guǎngzhōu Dìtiě Jiǔ Hào Xiàn) or Huadu Line (Chinese: 花都线; pinyin: Huādū Xiàn) is expected to run across Huadu District. It will start at Fei'eling and end at Gaozeng, interchanging with Line 3 at Gaozeng. The total length will be 20.1 km with 11 stations. Line 9's color is peppermint green. Line 9 is expected to be opened to operation on 2017.[1][needs update]
Stations
English |
Hanzi |
|||
Fei'eling | 飞鹅岭 | Under construction | Huadu | |
Huadu Auto City | 花都汽车城 | |||
Guangzhou North Railway Station | 广州北站 | Guangzhoubei | ||
Huacheng Lu | 花城路 | |||
Huaguoshan Park | 花果山公园 | |||
Huadu Square | 花都广场 | |||
Ma'anshan Park | 马鞍山公园 | |||
Liantang | 莲塘 | |||
Qingbu | 清㘵 | |||
Qingtang | 清塘 | |||
Gaozeng | 高增 | 3 | Baiyun | |
References
- ^ "First-stage of Guangzhou metro line 6 to put into operation by next year". 8 August 2011. Retrieved 27 August 2012.