Line 9 (Guangzhou Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Primefac (talk | contribs) at 02:07, 17 October 2016 (replace template being merged/deleted using AWB). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 9
Overview
StatusUnder construction
OwnerCity of Guangzhou
Termini
Stations11
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
Operator(s)Guangzhou Metro Corporation
Technical
Line length20.1 km (12.5 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Route map
Template:Infobox RDT

Line 9 of the Guangzhou Metro (Chinese: 广州地铁9号线; pinyin: Guǎngzhōu Dìtiě Jiǔ Hào Xiàn) or Huadu Line (Chinese: 花都线; pinyin: Huādū Xiàn) is expected to run across Huadu District. It will start at Fei'eling and end at Gaozeng, interchanging with Line 3 at Gaozeng. The total length will be 20.1 km with 11 stations. Line 9's color is peppermint green. Line 9 is expected to be opened to operation on 2017.[1][needs update]

Stations

Station Name
English
Station Name
Hanzi
Platform Types
Transfer
Location
Fei'eling 飞鹅岭 Under construction Huadu
Huadu Auto City 花都汽车城
Guangzhou North Railway Station 广州北站 Guangzhoubei
Huacheng Lu 花城路
Huaguoshan Park 花果山公园
Huadu Square 花都广场
Ma'anshan Park 马鞍山公园
Liantang 莲塘
Qingbu 清㘵
Qingtang 清塘
Gaozeng 高增  3  Baiyun
Line 9 Phase 1 map

References

  1. ^ "First-stage of Guangzhou metro line 6 to put into operation by next year". 8 August 2011. Retrieved 27 August 2012.