Jump to content

Line 19 (Beijing Subway)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Terramorphous (talk | contribs) at 14:24, 25 April 2020 (References). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 19
 19 
Construction site of Ping'anli station, Line 19 in March 2017
Overview
Other name(s)M19 / R3 (planned name)
StatusUnder construction
Termini
  • Mudanyuan
  • Xingong
Stations10 (Phase 1)
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing Metro Operation Administration (BJMOA) Corp., Ltd.[1]
Rolling stock8-car Type A
Technical
Line length22.4 km (Phase 1)
Characterfully underground[2]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed100 km/h (Phase 1)[3]
Route map

planned extensions
Mudanyuan
Left arrow outer – inner Right arrow
Xiaoyue river
Beitaipingzhuang
North Hucheng river
Jishuitan
Left arrow outer – inner Right arrow
Left arrow Line 4 Anheqiaobei
Ping'anli
Line 3 (Phase 2, long-term planning)
Line 4 Tiangongyuan Right arrow
Left arrow Line 3 Tiancun
Taipingqiao
Line 1 crossing
Line 2 crossing
Niujie
Line 7 crossing
South Hucheng river
Jingfengmen
Liangshui river
Left arrow Daxing Airport Express Lize Shangwuqu
Ma'cao river
Caoqiao
Left arrow inner – outer Right arrow
Xinfadi
Xingong depot
Xingong
Daxing line (through operation to Line 4)
planned extensions

Line 19 of the Beijing Subway (Chinese: 北京地铁19号线; pinyin: běijīng dìtiě shíjiǔ hàoxiàn) is a rapid transit line under construction in Beijing. Phase 1 of the line, which is currently under construction, is 22.4 km in length with 10 stations. It is fully underground.[4]

Planned opening time

The section from Caoqiao station to Xingong station (3 stations) will be opened in 2021, and the other 7 stations will be opened after 2021.[5]

Description

According to the most recent plan, Phase 1 of Line 19 will begin at Mudanyuan station in Haidian District and end at Xingong station in Fengtai District.[6] Phase 1 of the line is 22.4 km (13.9 mi) in length with 10 stations.[7] The line was envisioned as a major relief line for the overcrowded Line 4 and more direct link to the Beijing Financial Street commercial area.

Rolling stock

The line will use 8-car type A rolling stock.[3][8]

Stations (Phase I)

Station Name Connections Distance
km
English Chinese
Template:BJS stations 牡丹园  10     
Template:BJS stations 北太平庄  12  (U/C)    
Template:BJS stations 积水潭  2     
Template:BJS stations 平安里  4   6     
Template:BJS stations 金融街    
Template:BJS stations 牛街      
Template:BJS stations 景风门  14  (U/C)    
Template:BJS stations 草桥  10 
 Daxing Airport 
   
Template:BJS stations 新发地      
Template:BJS stations 新宫  Daxing     

History

It was reported in February 2012 as one of six new lines under planning by the city's public transit planning authorities.[9] As of 2015, the line was renamed to Line 19[10] with the first phase starting construction in 2016.[6] The line will open in 2021.[11][12]

Future Development

Phase 2 of Line 19, which is under planning, consists of a northern extension. There will be a branch line of the northern extension, which will serve the rebuilt Qinghe railway station, a station on the Beijing–Zhangjiakou intercity railway.[13]

References

  1. ^ "喜讯!北京轨道运营公司获得北京地铁19号线运营权 (BJMOA Obtains Operation Rights for Beijing Subway Line 19)". 继国庆节前成功高水平开通运营北京大兴国际机场线后,又收到成交通知书,经市政府批准,公司被确定为北京地铁19号线的运营商 (Following the successful opening of the Daxing Airport Express before the National Day, a transaction notification was received. With the approval of the municipal government, the BJMOA company was identified as the operator of Line 19)
  2. ^ http://m.sohu.com/n/419834931/
  3. ^ a b 北京地铁19号线无缝对接新机场线 10站中8站能换乘-千龙网·中国首都网. beijing.qianlong.com. Retrieved 2017-03-24.
  4. ^ http://m.sohu.com/n/419834931/
  5. ^ "19号线草桥以南后年先行开通". 2019-07-03.
  6. ^ a b "北京地铁19号线一期预计2020年完工 系首条南北地铁快线-新华网". www.xinhuanet.com. Retrieved 2018-07-21.
  7. ^ "北京地铁19号线将设10座车站8座能换乘 年内开建 北京日报 2015-8-27" (in Simplified Chinese).
  8. ^ 北京地铁19号线一期全部车站开建 计划于2020年通车-千龙网·中国首都网. beijing.qianlong.com. Retrieved 2018-05-29.
  9. ^ (Chinese) "北京轨道交通有望添6条新线12号线缓三环拥堵" 京华时报 2012-02-14
  10. ^ http://news.cnr.cn/native/gd/20150720/t20150720_519258903.shtml
  11. ^ "19号线草桥以南后年先行开通". 2019-07-03.
  12. ^ "编制轨道交通新一轮建设规划". 2019-02-27.
  13. ^ 北京地铁19号线一期计划2020年底开通. www.bj.xinhuanet.com. Retrieved 2017-03-24.