Jump to content

Line 1 (Xuzhou Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by WOSlinkerBot (talk | contribs) at 21:46, 20 June 2020 (remove un-needed options from tables). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 1
 1 
Overview
Native name徐州地铁1号线
StatusOperational
LocaleXuzhou, Jiangsu
Termini
Stations18
Service
TypeRapid transit
SystemXuzhou Metro
Rolling stock6-car Type B (CRRC Nanjing Puzhen)
History
OpenedSeptember 28, 2019[1]
Technical
Line length21.967[2] km (13.650 mi)
Number of tracks2
CharacterUnderground, elevated
Operating speed80 km/h (50 mph)

Line 1 of the Xuzhou Metro (Chinese: 徐州地铁1号线; pinyin: Xúzhōu dìtiě yī hào xiàn) is a rapid transit line in Xuzhou city, Jiangsu province, China. Construction commenced in February 2014, and the line was opened on September 28, 2019.[1] It is the first metro line to open in Xuzhou.

Line 1 runs primarily east-west through Xuzhou's main commercial areas, from Luwo in the west to Xuzhoudong Railway Station in the east. It connects the old city, Bashan area, Chengdong New Area, People's Square, Huaihai Square, and Pengcheng Square. It also connects to both major railway stations in the city.

Opening timeline

Segment Commencement Length Station(s) Name
Luwo — Xuzhoudong Railway Station 28 September 2019 21.967 km (13.65 mi)[2] 18 Phase 1

Line overview

Phase 1 stations (from west to east)
Station Name Platform Type Connections Status
English Chinese
Template:XuzhouM stations 路窝 Elevated, side Operational
Template:XuzhouM stations 杏山子 Underground, island  S3 
Template:XuzhouM stations 韩山
Template:XuzhouM stations 工农路
Template:XuzhouM stations 人民广场  5 
Template:XuzhouM stations 苏堤路
Template:XuzhouM stations 徐医附院
Template:XuzhouM stations 彭城广场  2 
Template:XuzhouM stations 民主北路
Template:XuzhouM stations 徐州火车站  3  China Railway
Template:XuzhouM stations 子房山
Template:XuzhouM stations 铜山路
Template:XuzhouM stations 黄山垅  5 
Template:XuzhouM stations 庆丰路
Template:XuzhouM stations 医科大学
Template:XuzhouM stations 乔家湖  4 
Template:XuzhouM stations 金龙湖
Template:XuzhouM stations 徐州东站  6   7  China Railway High-speed

History

As of June 2018, the civil engineering work was reported to be 95% complete, leaving mostly track laying, decorations, and electromechanical installations to be completed.[3] On August 30, 2018, railway work was declared complete, and electromechanical installations and decorations declared as "under intense progress".[4]

References

  1. ^ a b "徐州地铁1号线一期9月28日10:00正式开通". 2019-09-26.
  2. ^ a b "定了,徐州地铁1号线6月7日试运行!". 2019-05-06.
  3. ^ "轨道公司组织媒体集中报道1号线建设进展情况" [The railway company organized the media to report on the construction progress of Line 1]. Xuzhou Rail Transit (in Chinese). 2018-06-06. Retrieved 2018-07-19.
  4. ^ "轨道交通1号线一期工程顺利实现"轨通"" [Smooth implementation of railway on Metro Line 1]. Xuzhou Rail Transit (in Chinese). 2018-08-30. Retrieved 2018-08-30.