Jump to content

Line 1 (Nantong Rail Transit)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Garuda3 (talk | contribs) at 19:12, 23 November 2020. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 1 of the Nantong Metro (Chinese: 南通地铁1号线; pinyin: Nántōng dìtiě yī hào xiàn) is a rapid transit line under construction in Nantong, Jiangsu, China. It will run from Pingchao Station (平潮站) to Zhenxing Road Station (振兴路站). The total length of the line is 39.2 kilometres (24.4 mi). There will be 28 underground stations. Construction began on December 18, 2017[1] and will last until March 2022.[2]

The line will serve Nantong West railway station.

References

  1. ^ "南通轨道交通1号线开工建设 一期设28座站点" [Nantong Metro Line 1 construction begins, including 28 subway stations]. people.com.cn. 18 December 2017.
  2. ^ "最新消息!南通地铁1、2号线计划通车试运行时间是…". 2019-12-12.