Jump to content

Aonami Line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Tom.Reding (talk | contribs) at 13:43, 1 November 2016 (Category:Templates not safe for use in citation templates fixes using AWB). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Aonami Line
A 1000 series EMU
Overview
OwnerNagoya Seaside Rapid Railway
LocaleNagoya
Termini
Stations11
Service
TypeCommuter rail
Rolling stock1000 series
History
Opened2004
Technical
Line length15.2 km (9.4 mi)
Track gauge1,067 mm (3 ft 6 in)
Minimum radius191 m
Operating speed110 km/h (70 mph)*[1]

The Aonami Line (あおなみ線, Aonami-sen) is a third-sector railway line in the city of Nagoya operated by the Nagoya Seaside Rapid Railway (名古屋臨海高速鉄道, Nagoya Rinkai Kōsoku Tetsudō). Officially called the Nishi-Nagoyakō Line (西名古屋港線, Nishi-Nagoyakō-sen, West Nagoya Port Line), it connects Nagoya Station with Kinjō-Futō Station, and was a freight branch line of Tokaido Main Line, converted for passenger usage in October 2004.[1]

This line is still operated as a freight line by Japan Freight Railway Company (JR Freight) between Nagoya and Nagoya Freight Terminal, and so the section between Nagoya and Arako Station is used for both passenger and freight traffic.

Stations

Number Station name Japanese Distance (km)
AN01 Nagoya 名古屋 0.0
AN02 Sasashima-raibu ささしまライブ 0.8
AN03 Komoto 小本 3.3
AN04 Arako 荒子 4.3
AN05 Minami-Arako 南荒子 5.2
AN06 Nakajima 中島 5.9
AN07 Nagoya Keibajō-mae (Nagoya Race Course) 名古屋競馬場前 7.1
AN08 Arakogawakōen 荒子川公園 8.2
AN09 Inaei 稲永 9.8
AN10 Noseki 野跡 12.1
AN11 Kinjō-Futō 金城ふ頭 15.2

Rolling stock

Services on the line are operated by a fleet of eight four-car 1000 series electric multiple unit (EMU) trains.[2]

History

The Nishi-Nagoyakō Line opened on 1 June 1950 as a freight branch of the Tokaido Main Line between Sasashima Freight Terminal (笹島貨物) and Nishi-Nagoyakō (西名古屋港) operated by Japanese National Railways (JNR).[1] Nagoya Freight Terminal opened on 1 October 1980, and with the closure of Sasashima Freight Terminal on 1 November 1986, Nagoya Freight Terminal became the starting point of the line.[1] With the privatization and division of JNR on 1 April 1987, the line was transferred to Central Japan Railway Company (JR Central) as a "Class 1 railway operator" and JR Freight as a "Class 2 railway operator".[1]

Plans to operate passenger services on the line were formalized in the 1990s, and Nagoya Seaside Rapid Railway company was established in 1997 as a third-sector company funded by the city of Nagoya.[1] The passenger Aonami Line utilized approximately 12 km of existing freight line with a new approximately 4 km extension to Kinjō-Futō Station.[1] This opened on 6 October 2004, and at the same time, the section of track between Nagoya Station and Nagoya Freight Terminal was closed.[1]

Despite serving attractions such as the Nagoya International Exhibition Hall and Nagoya Race Course, passenger ridership figures fell short of targets, and in July 2010, the operating company declared debts of approximately 46 billion yen, applying for alternative dispute resolution (ADR) to avoid bankruptcy.[1]

References

  1. ^ a b c d e f g h i Terada, Hirokazu (19 January 2013). データブック日本の私鉄. Japan: Neko Publishing. p. 114. ISBN 978-4-7770-1336-4. {{cite book}}: Unknown parameter |trans_title= ignored (|trans-title= suggested) (help)
  2. ^ 私鉄車両編成表 2013. Japan: Kotsu Shimbunsha. 30 July 2013. p. 102. ISBN 978-4-330-39313-1. {{cite book}}: Unknown parameter |trans_title= ignored (|trans-title= suggested) (help)