Jump to content

Line 17 (Beijing Subway)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ASDFGH (talk | contribs) at 07:41, 28 June 2016. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 17
File:Beijing Subway icon.svg
Overview
StatusUnder construction
Termini
  • North Area of Science and Technology
  • Ciqu East
Stations20
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing Mass Transit Railway Operation Corp., Ltd.
Technical
Line length49.7 km (30.9 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed100 kilometres per hour (62 mph)

Line 17 of the Beijing Subway (Chinese: 北京地铁17线; pinyin: běijīng dìtiě shíqī hàoxiàn), also known by its codename, Line R2 (Chinese: 北京地铁R2线; pinyin: běijīng dìtiě ēr èr hàoxiàn),[1] is an express rapid transit rail line under planning in Beijing.[2] Line 17 is planned to run parallel and to the east of Line 5 from the Future Technology City in Changping District to Yizhuang in Daxing District.[3][4] The line is expected to have a total length of 49.7 km (30.9 mi).[4] With stations every 2.5 km and trains operating up to 100km/h, Line 17 will be Beijing's first north south express line. Line 17 is planned to utilize 8 car high capacity wide body A size trains.[2] The northern-most section from Changping to Wangjing West may open in 2015, with the rest of the line to follow by 2020.[4]

History

In January 2011, an official with the city's planning committee indicated that Line 17 of the Subway was planned to run east-west through the city's Central Business District under Guanghua Road with transfers to Lines 4 and 5.[5] In February 2012, the city's planning committee identified a different Line 17, code-named R2, as a line planned for 2020, that would run north-south from Tiantongyuan to Yizhuang that would run parallel and to the east of Line 5.[6] On June 15, 2012, the city government disclosed tentatively planned stations for the R2 Line including:[1][3][7][4]

  1. North Area of Science and Technology 未来科技城北区
  2. South Area of Science and Technology 未来科技城南区
  3. Tiantongyuan 天通苑      Line 5
  4. Wangjing West 望京西      Line 13 &      Line 15
  5. Taiyanggong 太阳宫      Line 10 &      Line 12
  6. Workers' Stadium 工人体育场      Line 3
  7. Dongdaqiao 东大桥      Line 6
  8. Yong'anli 永安里      Line 1
  9. Guangqumenwai 广渠门外      Line 7
  10. Panjiayuan 潘家园
  11. Shilihe 十里河      Line 10 &      Line 14

On October 10, 2013, city authorities confirmed that Line 17 is in fact Line R2 and would run from the Future Technology City in Changping District to Yizhuang in Daxing District.[4] Construction was expected to begin in 2014 and Line 17 would have a total length of 49.7 km (30.9 mi).[4] The northern section of Line 17, with six stations from the Future Technology City to Wangjing West, may open as early as 2015, with the rest of the line to follow in 2020.[4]

Construction on the first two stations, North Area of Science and Technology and South Area of Science and Technology, began on May 3, 2016.[8]

References

  1. ^ a b (Chinese) "北京再规划建设3号、12号、R2线三条新地铁线路" 中国质量新闻网 2012-06-16
  2. ^ a b http://news.china.com/domestic/945/20150720/20044694.html
  3. ^ a b (Chinese) "北京将再增3条新地铁" 《新京报》 2012-06-16
  4. ^ a b c d e f g (Chinese) "北京地铁17号线有望明年开建 从昌平至亦庄" 新京报 2013-10-10
  5. ^ (Chinese) Roll.sohu.com "CBD核心区地铁17号线地下步道规模空前" 中证网 2011-01-17
  6. ^ (Chinese) "北京轨道交通有望添6条新线 12号线缓三环拥堵" 京华时报 2012-02-14
  7. ^ (Chinese) "北京将再增3条新地铁" 新京报 2012-06-16
  8. ^ "北京地铁17号线两站已开工 一车站将建最长站台". 中国国情 (in Chinese). May 4, 2016. Retrieved 2016-05-18.