Jump to content

Line 20 (Shenzhen Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ASDFGH (talk | contribs) at 21:35, 19 July 2018. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 20
20
Overview
Other name(s)Fuyong line
(福永线; 福永線; Fúyǒng xiàn; Fuk1 Wing5 Sin3)
Native name二十号线; 二十號線; Èrshí hào xiàn; Ji6 Sap6 Hou6 Sin3
StatusUnder Construction
LocaleShenzhen, China
Termini
Stations6
Service
TypeRapid transit
SystemShenzhen Metro
Operator(s)SZMC (Shenzhen Metro Group)
Technical
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead Line, 1,500 V DC

Shenzhen Metro Line 20 is a rapid transit rail line under construction in Shenzhen connecting Airport North with the International Exhibition Center.[1] Construction started on 28 September 2016[2] and it is expected to be completed on 28 December 2018.

Stations

Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Template:SZM stations 国际会议中心 0.00 0.00 Bao'an
Template:SZM stations 国际会展中心北 1.65 1.65
Template:SZM stations 国际会展中心南 0.90 2.55
Template:SZM stations 重庆路 1.18 3.73
Template:SZM stations 机场北 11 Shenzhen Bao'an International Airport SZX 4.59 8.32

References

  1. ^ "深圳国际会展中心配套市政项目总体设计专家评审会顺利召开". www.mp.weixin.qq.com. Retrieved 2016-07-08.
  2. ^ "深圳国际会展中心开工奠基 2018年9月建成投用". www.sznews.com. Retrieved 2016-09-28.