Jump to content

Line S9 (Nanjing Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ASDFGH (talk | contribs) at 18:57, 12 January 2018. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line S9
 S9 
A Line S9 train at Gaochun Station
Overview
StatusIn operation
Termini
Stations6
Service
TypeRapid Transit
Operator(s)Nanjing Metro
History
Opened30 December 2017
Technical
Line length52.4 km (32.6 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in)

Line S9 is a line in the Nanjing Metro system in China, which opened on December 30, 2017. It connects to Line S1 at Xiangyulunan.

Line S9 also serves as the second stage of the Nanjing–Gaochun Intercity Railway or Ninggao Intercity Railway (Chinese: 宁高城际轨道交通; pinyin: Níng gāo chéng jì guǐdào jiāotōng[Note 1]), with Line S1 serving as the first stage.

Opening timetable

Segment Date opened Length
Xiangyulunan — Gaochun 30 December 2017 52.4 km (32.56 mi)

Station list

Station name Connections Distance
km
Location
English Chinese
Template:NJM stations 翔宇路南  S1  0.00 0.00 Jiangning
Template:NJM stations 铜山 10.00 10.00
Template:NJM stations 石湫 7.37 17.37 Lishui
Template:NJM stations 明觉 11.21 28.59
Template:NJM stations 团结圩 16.91 45.50 Gaochun
Template:NJM stations 高淳 6.23 51.74

Notes

  1. ^ "Ning" (宁), is the standard Chinese abbreviation for Nanjing. It comes from the name Jiangning that the city had in the early Qing.

External links