Calbayog Airport
This article needs additional citations for verification. (March 2020) |
Calbayog Airport Luparan san Calbayog Paliparan ng Calbayog | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Summary | |||||||||||
Airport type | Public | ||||||||||
Owner/Operator | Civil Aviation Authority of the Philippines | ||||||||||
Serves | Calbayog | ||||||||||
Elevation AMSL | 4 m / 12 ft | ||||||||||
Coordinates | 12°4′22″N 124°32′42″E / 12.07278°N 124.54500°E | ||||||||||
Map | |||||||||||
Runways | |||||||||||
| |||||||||||
Statistics (2023) | |||||||||||
| |||||||||||
Statistics from the Civil Aviation Authority of the Philippines.[1] |
Calbayog Airport (IATA: CYP, ICAO: RPVC) is an airport serving the general area of Calbayog, located in the province of Samar in the Philippines. The airport is classified as a Class 2 principal (minor domestic) airport by the Civil Aviation Authority of the Philippines, a body of the Department of Transportation that is responsible for the operations of not only this airport but also of all other airports in the Philippines except the major international airports.
Airlines and destinations
Airlines | Destinations |
---|---|
Cebgo | Cebu |
PAL Express | Manila |
Expansion
On August 14, 2014, Philippine Senate President issued statement which included Calbayog Airport in the airport budget priority for 2015 with 678 million pesos allocated.[2]
On May 9, 2017, DOTr begins the construction of new passenger terminal and site development, which also includes a 575-meter runway extension project. It was planned to be finished on April 28, 2019. However, in a progress report announced by the Department of Transportation on November 25, 2019, the construction of the new passenger terminal was then 77% complete, which was way later than the targeted date of completion.
The completion of the new airport terminal and runway extension project was delayed in 2020 due to the COVID-19 pandemic. The new airport terminal including the newly-extended runway were finally inaugurated on May 5, 2021, after almost 4 years of construction. With the new terminal and runway completed, larger jet aircraft can now land and take off from the airport, which means it can accommodate more flights direct from Manila using the Airbus A320.[3]
Control Tower
See also
Notes
References
- ^ "Aircraft, Passenger and Cargo Movements 2023". Archived from the original on 2023-05-18. Retrieved 2024-01-10.
- ^ "DOTC to get P13.3B for rehab of airports". Archived from the original on 2014-08-14. Retrieved 2014-08-14.
- ^ "DOTr, Caap inaugurate modernized Calbayog airport". sunstar.com.ph. May 5, 2021. Retrieved May 6, 2021.