Mount Mercer Wind Farm

Coordinates: 37°50′28″S 143°52′16″E / 37.8411°S 143.871°E / -37.8411; 143.871
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 59.167.126.79 (talk) at 06:28, 18 February 2012. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Mount Mercer Wind Farm
Map
CountryAustralia
Coordinates37°50′28″S 143°52′16″E / 37.8411°S 143.871°E / -37.8411; 143.871
StatusFinal Design
Owner(s)Meridian Energy
Power generation
Nameplate capacity
  • 131 MW

Mount Mercer Wind Farm website

The proposed Mount Mercer Wind Farm will be located at Mount Mercer approximately 30 kilometres south of Ballarat in Western Victoria on 2600ha. The wind farm will consist of 64 Enercon E82 wind turbines, giving a total installed capacity of 131 MW[1]. It is expected to generate approximately 395,000 megawatt hours (MWh) of electricity each year which could power approximately 74,000 households and result in a reduction of some 510,000 tonnes of carbon dioxide[2].

Construction was due to commence in September 2009 under the management of WestWind Energy, however the project changed hands to Meridian Energy in the middle of 2009[3]. Construction was delayed until the end of 2009 or early 2010 with Meridian Energy citing the global financial crisis as the cause of the delay in construction[3]. Construction has been further delayed until mid-year 2011, Meridian Energy cite the reason as re-designing how the Mount Mercer Wind Farm is back hauled to the national grid and thus having to renegotiate easement agreements with local land owners[4].

A proposed location[5] of the 64 wind turbines has been made available to the public.

References

  1. ^ Mount Mercer Wind Farm Website
  2. ^ Wind farm to boost power supply
  3. ^ a b Mount Mercer Update August 2009
  4. ^ Holcombe, Angus. Meridian Energy Project Manager. Email update from March 30th, 2011.
  5. ^ Mount Mercer wind farm turbine layout