Circle MRT Line
[圆地铁环线] Error: {{Lang}}: unrecognized language code: gb (help)
The Circle Line is coloured orange on system maps.
Overview
StatusOperational
OwnerLand Transport Authority
Termini
Stations31
Service
TypeRapid transit
SystemMass Rapid Transit (Singapore)
Services3
Operator(s)SMRT Trains (SMRT Corporation)
Rolling stockAlstom Metropolis C830, Alstom Metropolis C830C
History
Opened28 May 2009 (Stage 3)
17 April 2010 (Stage 1 and 2)
8 October 2011 (Stage 4 and 5, except Bukit Brown)
14 January 2012 (Circle Line Extension)
Technical
Line length35.7 km (22.2 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map
Template:MRT route

The Circle Line (CCL) is Singapore's fourth Mass Rapid Transit line, operated by SMRT Corporation. This underground line is 35.7 kilometres (22.2 mi) long with 28 stations (excluding Bukit Brown) and is fully automatically operated.[1] It takes about one hour to travel from one end to the other. The line is coloured orange on the rail map.

As the name implies, the line is an orbital line linking all radial lines leading to the city. It also covers many parts of the Central Area. From Promenade, the line branches with one branch terminating at Dhoby Ghaut and the other terminating at Marina Bay. Transfers to the North South Line are provided at Bishan, Dhoby Ghaut and Marina Bay stations, East West Line at Paya Lebar and Buona Vista stations, and North East Line at Dhoby Ghaut, Serangoon and HarbourFront stations. The future Downtown Line will interchange with the Circle Line at Bayfront, Promenade, Botanic Gardens and MacPherson stations and the future Thomson Line will interchange with the Circle Line at Caldecott and Marina Bay stations.

The Circle Line is the first medium capacity line in Singapore. As a medium capacity line, each Circle Line train has only three cars instead of the six-car configuration as seen on current MRT lines. Half a million people are expected to use the Circle Line each day. The line reduces travelling time for commuters by allowing them to shorten trips between north to east or north to west and vice versa, bypassing busy interchange like City Hall and Raffles Place.

Currently, the Circle Line is not a full circle yet, as there is no through service on the section between HarbourFront and Marina Bay or Dhoby Ghaut. Passengers will need to transfer onto the North East Line to get to Dhoby Ghaut instead. However, a branch passing through the Marina District has been built, and a "Stage 6" that would complete the circle has been mooted but is not officially planned.[2]

History

Plans for the Circle Line date back to the 1980s. The then Minister for Communications and Information, Dr Yeo Ning Hong stated that such a system "it would be feasible when the population reaches four million".

In the 1990s, the Circle Line was first known as the Marina Line. The Marina Line was initially planned as a 12-station underground line, starting from Chinatown and Dhoby Ghaut via the National Stadium to either Kallang or Paya Lebar station. However, the Chinatown leg was later truncated and was reduced to 6 stations up to Stadium station. On the other hand, a further extension towards Upper Paya Lebar was added. Eventually, the Marina Line ended up as an inner circular line. Stations in Circle Line that were a part of the original Marina Line plans include Dhoby Ghaut, Bras Basah, Esplanade, Promenade, Nicoll Highway and Stadium. Also, the part of the Marina Line from Chinatown Station to Promenade Station is now part of the Downtown Line.

Originally scheduled to be opened from 2006 and fully opened in 2010, with an estimated cost of S$6.7 billion, the Nicoll Highway collapse caused the construction of the line to be delayed. As a result, the opening of the Circle Line was delayed to 2009, with full opening by 2011 (excluding the Marina Bay Extension), at an escalated cost of nearly S$10 billion.[3] Due to the re-alignment of the Nicoll Highway Station to a new location, the station is only two-thirds the size of the original plan before the collapse, and located 100 metres (330 ft) away from the highway collapse site.[4] The decision was also made to open both Caldecott, and Haw Par Villa stations (previously Thomson and West Coast), initially planned as shell stations, together with the whole line, leaving only Bukit Brown Station closed.

Stage 3, a 5 kilometres (3.1 mi) five-station segment stretching from Bartley to Marymount, was the first section of the line opened, on May 28, 2009. Ridership on this section has been considerably lower than estimated, at 32,000 passengers per day (ppd) instead of the estimated 55,000 ppd.[5] Tunneling works for the entire line were completed on August 17, 2009.[6] Stages 1 and 2 started operations on April 17, 2010,[7] Stages 4 and 5 on October 8, 2011.[8] and the final Circle Line Extension on January 14, 2012.

  • 28 May 2009: Stage 3 (Bartley - Marymount) opened
  • 17 April 2010: Stage 1 and 2 (Dhoby Ghaut - Bartley) opened
  • 8 October 2011: Stage 4 and 5 (Marymount - HarbourFront) opened
  • 14 January 2012: Circle Line Extension (CCLe) (Promenade - Marina Bay) opened

Possible future extensions

The Circle Line is widely expected to have a Stage 6 which completes the circle from HarbourFront to Marina Bay stations. Several options have been mooted for closing the 4 kilometres (2.5 mi) gap, primarily a northern route through the existing Tanjong Pagar MRT Station or a southern route passing through the Port of Singapore's Tanjong Pagar dock area, whose lease expires in 2027. The cost of closing the gap has been estimated to be at S$1.5 to 2.0 billion at 2010 prices. At HarbourFront MRT Station, Paya Lebar MRT Station, Marina Bay MRT Station and at Dhoby Ghaut MRT Station, Circle Line trains change their direction in the platform area; trains terminating for example at Stadium MRT Station change their direction in a nearby siding track. As soon as the circle will have been completed between HarbourFront MRT Station and Marina Bay MRT Station, the Circle Line is the only line in Singapore that have single terminus, which is Dhoby Ghaut MRT Station.

Accidents

Nicoll Highway collapse

On April 20, 2004, a section of the tunnel being built for the Circle Line collapsed, apparently when a retaining wall used in the tunnel's construction gave way. This occurred near what was planned to become the Nicoll Highway Station on the Circle line, not far from the Merdeka Bridge. The accident left a collapse zone 150 metres (490 ft) wide, 100 metres (330 ft) long, and 30 metres (98 ft) deep. Four workers were killed, with three more injured.

A criminal inquiry found the main contractor Nishimatsu Construction Company and joint venture partner firm Lum Chang Construction Company and their officers, as well as key Land Transport Authority officers responsible for the collapse. Several other officers and subcontractors were reprimanded and issued warnings in connection with the accident.

As a result of this accident, the first phase of the Circle Line, previously scheduled to open in 2008, was completed in 2010 instead. The affected station has been shifted about 100 metres (330 ft) away from the accident site and is now located at Republic Avenue.

This accident had also resulted in stricter safety regulations for the construction of all future MRT lines. The shifting of the Nicoll Highway Station also meant it can no longer serve as a terminus for the Bukit Timah Line, partially influencing the creation of the current Downtown Line.

Other incidents

On August 16, 2007, the Building and Construction Authority (BCA) issued a stop-work order and revoked the contractor's tunnelling permit after a 7 metres (23 ft) stretch of two lanes sank about 20 centimetres (7.9 in), close to the junction of Telok Blangah Road and Alexandra Road in the evening, resulting in a halting of tunnelling works.[9]

A section of the road above a construction site near Holland Road caved in on the morning of May 24, 2008, creating a massive hole. The hole, directly in front of two private houses along Cornwall Gardens Road, measured 8 by 7 metres and was 3 metres deep. No one was injured, but the road was temporarily closed to traffic.[10]

Line Disruptions

On 20 September 2011, a power fault disrupted train services on all 16 stations on the Circle Line. The four hours delay left thousands of commuters stranded during rush-hour. It was reported that leaks and a damaged cable along the Circle Line were the caused of the disruption.[11] The disruption started at about 5.30am. Train services were gradually restored from 8am and all services were restored just before 10am. Dakota and Mountbatten stations were the last two to resume operations.[12] Investigations were carried out. It was later found that a faulty cable beneath the platform level at Dakota Station caused a power fault on Tuesday morning that affected train services at all 16 stations on the Circle Line.[13] 27,000 passengers were affected by the disruption during the four hours delay, with bus bridging services plying the Circle Line route.[14]

On 17 October 2011, at about 8.36am, a train heading from Labrador Park Station to Pasir Panjang Station experienced a train fault and had to be taken out of service. Announcements were made in the affected stations, while bus bridging services were provided plying the affected section of the Circle Line. Normal train services resumed at 11.12am.[15][16]

On 14 December 2011, a communication network problem caused service disruption between Marymount and one-north MRT stations at 6am.[17] Partial train service was restored by 6.40am but extra peak hour trains could not be deployed for the morning peak hours. Bus bridging services were provided for stations between Marymount and one-north MRT stations and also between Serangoon and one-north MRT stations. SMRT said services had resumed around 10am but TODAY's deputy news editor Leong Wee Keat, who was at Bishan MRT, says the service is still slow.[18] In an updated statement, SMRT reported that full services were resumed at 11.45am and bus bridging services were extended till 1pm. SMRT is still attending to the fault and investigating its cause with the system supplier Alstom.[17][19]

On 19 January 2012, around 12.30pm, a track fault occurred between Promenade and Marina Bay. This was the first time that Circle Line Extension encountered a fault since operation began on 14 January 2012, 5 days ago. Bus bridging services provided between stations. Train services resumed at 12.50pm.[20][21][22]

In the morning of 18 April 2012, during the peak hours, a track fault caused train services for Dhoby Ghaut and Harbourfront bounds to be suspended between Bishan and one-north stations. Free bus bridging services between Bishan and one-north stations at designated bus boarding points outside both stations were provided, but commuters were advised by SMRT to "make alternate travel plans where possible". As of 10.15am, train service for both bounds between the affected stations resumed.[23][24]

Stations

View of underground platform at Bishan Station of the Circle Line from ground level (when under construction). This station interchanges with Bishan Station on the North South Line
Alstom Metropolis C830 rolling stock for the Circle Line parked in the depot.
one-north Station on the Circle Line.
Station Number Station Name Interchange/Notes
 CC1  NS24  NE6  Dhoby Ghaut Template:SMRT linesTemplate:SMRT lines
 CC2  Bras Basah  
 CC3  Esplanade  
 CC4  DT15  Promenade Template:SMRT lines
 CC5  Nicoll Highway  
 CC6  Stadium Terminal for Marina Bay shuttle train service in non peak hour.
 CC7  Mountbatten  
 CC8  Dakota  
 CC9  EW8  Paya Lebar Template:SMRT lines
 CC10  DT26  MacPherson Template:SMRT lines
 CC11  Tai Seng  
 CC12  Bartley  
 CC13  NE12  Serangoon Template:SMRT lines
 CC14  Lorong Chuan  
 CC15  NS17  Bishan Template:SMRT lines
 CC16  Marymount  
 CC17  TS9  Caldecott Template:SMRT lines
 CC18  Bukit Brown (Not in operation)
 CC19  DT9  Botanic Gardens Template:SMRT lines
 CC20  Farrer Road  
 CC21  Holland Village  
 CC22  EW21  Buona Vista Template:SMRT lines
 CC23  one-north  
 CC24  Kent Ridge  
 CC25  Haw Par Villa  
 CC26  Pasir Panjang  
 CC27  Labrador Park  
 CC28  Telok Blangah  
 CC29  NE1  HarbourFront Template:SMRT lines
The current map of the Circle Line shown on top of the train doors. Note that Bayfront and Marina Bay has only been added recently.

Circle Line Extension

Station Number Station Name Interchange
 CC4  DT15  Promenade Template:SMRT lines
 CE1  DT16  Bayfront Template:SMRT lines
 CE2  NS27  Marina Bay Template:SMRT linesTemplate:SMRT lines

Circle Line Extension had been in operation since 14 January 2012.[25]

Rolling stock

Interior of CCL MRT Alstom Metropolis C830 train
Door of Alstom Metropolis C830, which shows the Circle Line Stage 3 map
Emergency exit of Alstom Metropolis C830

The rolling stock consists of 40[26] Alstom Metropolis C830 trains[27] running in three-car formation. They are stabled at Kim Chuan depot, the world's largest underground depot. 24 additional Alstom Metropolis C830C trains will arrive starting in 2015.[28][29]

Additional information

  • Trains from Marina Bay to Stadium were being extended to HarbourFront during peak hours.
  • Additional train service runs across the whole line during lunch hours from 12pm to 2pm on weekdays (excluding public holidays). Trains run at a frequency of 5 minutes during these times, down from the usual 7 minutes.
  • There used to be a short working trip on the Circle Line from Paya Lebar to HarbourFront (Originally Marymount and later one-north) since 19 April 2010, the first working day since its operations. However, on 14 January 2012, with the opening of Bayfront and Marina Bay, the short working trip and the middle platform of Paya Lebar station became defunct as trains will run the full line during peak hours. The short working trip on the Circle Line from Paya Lebar to HarbourFront is available during non-peak hours or after lunchtime express.
  • Like the North East Line, the Circle Line features the Art in Transit programme. This consists of artwork that is integrated into station designs as well as "Art Seats". Also part of the LTA's Art in Transit programme were open architectural competitions for two Circle Line stations, Stadium, and Bras Basah, both of which were awarded to WOHA Architects.

References

  1. ^ "ALSTOM chosen for the world's longest fully automated metro line in Singapore". railway-technology.com. 2002-02-20.
  2. ^ http://motoring.asiaone.com/Motoring/News/Transport/Story/A1Story20100424-212250.html
  3. ^ http://motoring.asiaone.com/Motoring/Motorworld/Story/A1Story20090818-161682.html
  4. ^ "Circle Line will exceed $6.7b budget" Christopher Tan, The Straits Times, 15 September 2007
  5. ^ http://www.channelnewsasia.com/stories/singaporelocalnews/view/449350/1/.html
  6. ^ http://www.straitstimes.com/Breaking%2BNews/Singapore/Story/STIStory_417858.html?vgnmr=1
  7. ^ http://app.lta.gov.sg/corp_press_content.asp?start=kpt8zx9w8ik53wi33gr59p754348fsj35b9glldouy8ndlh7kb
  8. ^ http://sg.news.yahoo.com/blogs/singaporescene/final-batch-circle-line-stations-open-004355257.html
  9. ^ "Stop-work order at Telok Blangah site is fourth this year on $6.7b MRT project" T. Rajan, The Straits Times, 22 August 2007
  10. ^ "Road above Circle Line construction site caves in" CNA Live, Channel NewsAsia, 24 May 2008
  11. ^ "Leaks, damaged cable cause of 4-hour delay on Circle Line". The Straits Times. 29 September 2011. Retrieved 19 October 2011.
  12. ^ "Thousands affected by Circle Line disruption". Channel News Asia. 20 September 2011. Retrieved 19 October 2011.
  13. ^ "Faulty cable led to Circle Line disruption". Channel News Asia. 20 September 2011. Retrieved 19 October 2011.
  14. ^ "Call for thorough probe on Circle Line disruption". Channel News Asia. 22 September 2011. Retrieved 19 October 2011.
  15. ^ "Two SMRT lines hit by delays". TODAY. 17 October 2011. Retrieved 19 October 2011.
  16. ^ "Train faults along two lines". TODAY. 18 October 2011. Retrieved 19 October 2011.
  17. ^ a b "SMRT apologises for Circle Line disruption". TodayOnline. Retrieved December 14, 2011.
  18. ^ "Circle Line disrupted". TodayOnline. Retrieved December 14, 2011.
  19. ^ http://www.channelnewsasia.com/stories/singaporelocalnews/view/1171290/1/.html Dec 14, 2011. Retrieved 2011-12-14.
  20. ^ "Promenade & Marina Bay Circle Line stations hit by track fault". Channel News Asia. January 19, 2012. Retrieved January 19, 2012.
  21. ^ "Train service between Promenade, Marina Bay stations resumes". TheStraits Times. January 19, 2012. Retrieved January 19, 2012.
  22. ^ "SMRT statement on Circle Line disruption between Marina Bay and Promenade stations" (PDF). January 19, 2012. Retrieved January 20, 2012.
  23. ^ "Track fault disrupts section of Circle Line train service". Channel News Asia. 18 April 2012.
  24. ^ "Circle Line train service resumes". Channel News Asia. 18 April 2012.
  25. ^ "Marina Bay, Bayfront stations open; more relief for commuters soon". Straits Times. Retrieved 2012-01-14.
  26. ^ Tuas West Extension Groundbreaking Ceremony Speech (PDF) (Speech). Land Transport Authority. 4 May 2012.
  27. ^ AWARD OF ELECTRICAL & MECHANICAL SYSTEMS CONTRACT 830 FOR THE MARINA LINE
  28. ^ "Circle Line on track to open by 2010" Asha Popatlal, Channel NewsAsia, 17 July 2006
  29. ^ "Construction Starts for Tuas West Extension" (Press release). Land Transport Authority. 4 May 2012.