Jump to content

Line 1 (Nanjing Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Entranced98 (talk | contribs) at 17:48, 26 July 2023 (Adding local short description: "Metro line in Nanjing, China", overriding Wikidata description "line of Nanjing Metro"). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 1
A Line 1 train approaching Hongshan Zoo
Overview
Other name(s)Tianyin Line
StatusIn operation
LocaleJiangning, Yuhuatai, Qinhuai, Gulou, Xuanwu and Qixia districts
Nanjing, Jiangsu
Termini
Stations32
Service
TypeRapid transit
Rolling stockAlstom Metropolis
Daily ridership763,000 (2014 Avg.)
1.207 million (2019 Peak)[1]
History
OpenedAugust 12, 2005; 19 years ago (2005-08-12)
Technical
Line length18.5 km (11.5 mi)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed65km/h (Normal), 80km/h (Maximum)
Route map

Erqiaogongyuan Depot
Baguazhoudaqiaonan
Badoushan
Yanziji
Jixiang'an
Xiaozhuang 7 
Maigaoqiao
Hongshan Zoo
Left arrow Linchang  3 
Nanjing railway station 3  9 China Railway
Xinmofan­malu
Xuanwumen
Gulou 4 
Zhujianglu
Xinjiekou 2 
Zhangfuyuan
Sanshanjie 5 
Zhonghuamen
China Railway
 10  Phase 2 Right arrow
Andemen 10 
to  10 
Left arrow  10  to Yushanlu
Xiaohang Depot
Tianlongsi
Ruanjian­dadao
Huashenmiao
Nanjing South Railway Station  3  6  S1  S3 
(Left arrow Gaojiachong  S3 
Shuanglong­dadao
Hedingqiao
Shengtailu
Baijiahu
Xiaolongwan
Zhushanlu 5 
Tianyin­dadao
Longmian­dadao
NMU - JIETT
NJCI
CPU
CPU Depot

Line 1 of the Nanjing Metro (Chinese: 南京地铁1号线; pinyin: Nánjīng Dìtiě Yī Hào Xiàn) is a north-south line and the first operating metro line in the Nanjing Metro system, inaugurated on September 3, 2005. After the opening of the 25.08 km (15.58 mi)-long south extension line on May 28, 2010,[2] the total length of Line 1 is now 37.9 km (23.5 mi),[3] running from CPU to Maigaoqiao.

Opening timeline

Segment Commencement Length Station(s) Name
Maigaoqiao — Andemen 27 August 2005 21.72 km (13.50 mi) 12 Phase 1 (1st section)
Andemen — Xiaohang 27 August 2005 2.1 km (1.30 mi) 1 Phase 1 (2nd section)
Xiaohang — Olympic Stadium 3 September 2005 4.6 km (2.86 mi) 3 Phase 1 (3rd section)
Andemen — CPU 28 May 2010 25.08 km (15.58 mi) 14 Southern extension
Nanjing South 28 June 2011 Infill station 1
Andemen[a] — Olympic Stadium 1 July 2014 −6.7 km (−4.16 mi) -4 Line 1 & 10 realignment project
Baguazhoudaqiaonan — Maigaoqiao 28 December 2022 6.524 km (4.05 mi) 5 Northern extension
  1. ^ Not including Andemen (elevated) station.

Route

This line mainly runs in a north-south direction. It starts at Baguazhoudaqiaonan station in the north, and continues southwards towards CPU station which is located at the southeastern side of Nanjing.

Of the total 21.72 km (13.50 mi) of the main line track, 14.33 km (8.90 mi) of the Line 1 track runs underground, while 7.39 km (4.59 mi) of the track run on or above the ground. Of the total 16 stations, 11 of them are underground stations while the other 5 are either ground or elevated stations.

A view of Line 1 train stopping at Zhangfuyuan when first opened in 2006
Old Trainset 0512 29x-0512 30x-
Old train set 2728
Purchased Train Departing NMU JIETT

The southern extension line of Metro Line 1 has a total length of 25.08 km (15.58 mi) with 15 stations (excluding Andemen station). Of the total 15 stations, 8 of them are underground and the other 7 are all elevated stations.[4]

The northern extension covers a length of 7.2 km (4.5 mi) (6.7 km (4.2 mi) underground and 0.5 km (0.31 mi) elevated) with 5 underground stations(excluding Maigaoqiao station).[5] It's completed in 2022.[6]

Stations

Service
routes
Station name Connections Distance
km
Location
English Chinese
Baguazhoudaqiaonan 八卦洲大桥南 Qixia
Badoushan 笆斗山
Yanziji 燕子矶
Jixiang'an 吉祥庵
Xiaozhuang 晓庄  7 
Maigaoqiao 迈皋桥 0.000 0.000
Hongshan Zoo 红山动物园 1.142 1.142 Xuanwu
Nanjing Railway Station 南京火车站  3  Nanjing railway station Nanjing railway station NJH 1.123 2.265
Xinmofan­malu 新模范马路 1.691 3.956 Gulou
Xuanwumen 玄武门 1.061 5.017 Xuanwu
Gulou 鼓楼  4  1.254 6.271 Gulou
Zhujianglu 珠江路 0.862 7.133 Qinhuai
Xinjiekou 新街口  2  1.147 8.280 Qinhuai
Zhangfuyuan 张府园 1.125 9.405
Sanshanjie 三山街 0.909 10.314
Zhonghuamen 中华门 Zhonghuamen railway station VNH 1.914 12.228 Yuhuatai
Andemen 安德门  10  2.093 14.321
Tianlongsi 天隆寺 1.455 15.776
Ruanjian­dadao 软件大道 1.283 17.059
Huashenmiao 花神庙 1.076 18.135
Nanjing South Railway Station 南京南站  3   S1   S3  Nanjing South railway station NKH 1.853 19.988
Shuanglong­dadao 双龙大道 2.276 22.264 Jiangning
Hedingqiao 河定桥 1.345 23.609
Shengtailu 胜太路 0.904 24.513
Baijiahu 百家湖 1.332 25.845
Xiaolongwan 小龙湾 1.475 27.320
Zhushanlu 竹山路 1.135 28.455
Tianyin­dadao 天印大道 1.919 30.374
Longmian­dadao 龙眠大道 1.312 31.686
NMU / JIETT 南医大·江苏经贸学院 1.550 33.236
NJCI 南京交院 2.720 35.956
CPU 中国药科大学 1.964 37.920

References

  1. ^ 南京地铁 (2019-03-09). 【刷新纪录!妇女节南京地铁客流突破408万人次】. 新浪微博 (in Chinese). Retrieved 2019-03-12.
  2. ^ "Nanjing Metro places €85·5m train order". Railway Gazette International. 2008-01-25. Archived from the original on 2016-10-22.
  3. ^ 南京地铁. www.nj-dt.com. Archived from the original on 2013-11-06. Retrieved 2010-05-27.
  4. ^ "南京地铁". www.nj-dt.com. Retrieved 2010-05-27.
  5. ^ "苦等多时,1号线北延迎来重要进展,开通时间……". 南京地铁1号线北延线工程南起地铁1号线迈皋桥站,北至二桥公园站,线路全长7.2km,其中高架线0.5km,地下线6.7km,全线设5座地下站
  6. ^ "1号线北延线、7号线北段今日12时开通初期运营". 2022-12-28.
  • Line 1 on the official Nanjing Metro website (includes route map) (in Chinese)