Line 11 (Suzhou Rail Transit)
Line 11 | |
---|---|
S1 | |
Overview | |
Status | Under construction |
Owner | Suzhou Rail Transit Co., Ltd |
Termini | |
Stations | 28[1] |
Service | |
Type | Rapid transit |
System | Suzhou Rail Transit |
Operator(s) | Suzhou Rail Transit Co., Ltd |
Rolling stock | 6-car Type B[2] |
Technical | |
Line length | 41.27 kilometres (25.64 mi) |
Number of tracks | 2 |
Character | Underground[3][4] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | overhead wire |
Line S1 of Suzhou Rail Transit is an under construction intercity rapid transit line. Running west-east, the line will mainly serve Kunshan city center and connect it to Suzhou Industrial Park in the west and nearby metropolitan Shanghai in the east via a transfer to Line 11 of the Shanghai Metro.[1] The line will be the first metro line in downtown Kunshan.[3] The terminus Huaqiao station will be an interchange metro station between Suzhou Rail Transit system and Shanghai metro system. The line started construction on November 27, 2018 and is scheduled to be completed by 2023.[5] The line will use 6-car Type B rolling stock operating up to 100km/h.[6]
Stations
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Template:SZRT stations | 唯亭 | 3 | 0.00 | 0.00 | SIP | |
Yangchenghu South[a] | 阳澄湖南[a] | |||||
Template:SZRT stations | 渔家灯火 | Kunshan | ||||
Template:SZRT stations | 城铁阳澄湖站 | Yangchenghu | ||||
Template:SZRT stations | 莲湖公园 | |||||
Template:SZRT stations | 祖冲之路 | |||||
Template:SZRT stations | 文化艺术中心 | |||||
Template:SZRT stations | 虹祺路 | |||||
Template:SZRT stations | 鹿城路 | |||||
Template:SZRT stations | 白马泾路 | |||||
Template:SZRT stations | 玉山广场 | |||||
Template:SZRT stations | 珠江路 | |||||
Template:SZRT stations | 黑龙江路 | |||||
Template:SZRT stations | 青阳中路 | |||||
Template:SZRT stations | 顺帆路 | |||||
Template:SZRT stations | 金沙江路 | |||||
Template:SZRT stations | 洞庭湖路 | |||||
Template:SZRT stations | 时代大厦 | |||||
Template:SZRT stations | 金融街 | |||||
Template:SZRT stations | 昆嘉路 | |||||
Template:SZRT stations | 洪湖路 | |||||
Template:SZRT stations | 城铁花桥站 | Huaqiao | ||||
Template:SZRT stations | 光夏路 | |||||
Template:SZRT stations | 陆家 | |||||
Exhibition Center | 展览中心 | |||||
Xihuan Lu | 西环路 | |||||
Template:SZRT stations | 花溪公园 | |||||
Huaqiao | 花桥 | 11 (Shanghai Metro) | ||||
References
- ^ a b "苏州地铁s1号线最新消息(站点+线路图+开通时间)". Retrieved 28 September 2018.
- ^ "S1线首座车站主体围护结构完工". 2019-05-22. Retrieved 2019-06-16.
- ^ a b "国家发展改革委关于苏州市城市轨道交通第三期 建设规划(2018~2023年)的批复". Retrieved 28 September 2018.
- ^ "上海至苏州第二条跨省地铁完成选址,两地直达只需1小时". Retrieved 15 November 2018.
- ^ 新华报业网 (2018-11-27). "苏州轨道交通6号线、S1线开工,2024年将建成9条线". news.sina.com.cn. Retrieved 2019-03-19.
- ^ "S1线首座车站主体围护结构完工". 2019-05-22. Retrieved 2019-06-16.